Construction of a new single storey eight classroom primary school with a connected General Purpose Hall for Gaelscoil Lorgan
Deadline
08 Sep
08 Sep 2023
Deadline
08 Sep
Construction of a new primary school with General Purpose Hall in Castleblayney, Co Monaghan
Construction of a new primary school with General Purpose Hall in Castleblayney, Co Monaghan
Bidder profile
Mid-sized to large construction firms with experience in public sector projects and compliance with educational facility standards.
Risks & flags
- Undisclosed contract value
- High turnover requirement
- Two-step tender process
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Cavan and Monaghan Education and Training Board |
| Title | Construction of a new single storey eight classroom primary school with a connected General Purpose Hall for Gaelscoil Lorgan at Shercock Road, Killycard, Castleblayney. Co Monaghan |
| CPV / category | works |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | 12 months |
| Submission deadline | 2023-09-08T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
Cavan and Monaghan Education and Training Board ran this procurement for “Construction of a new single storey eight classroom primary school with a connected General Purpose Hall for Gaelscoil Lorgan at Shercock Road, Killycard, Castleblayney. Co Monaghan” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:
- consequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage Lintols designer concrete - Product Liability Insurance required covering the consequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage Storm water Attenuation Designer - PI €1m annual aggregate Anchor designer - P
- onsequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage • Lintols designer concrete - Product Liability Insurance required covering the consequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage • Storm water Attenuation Designer - PI €1.5m each and every claim or € 3m in the agg
- The minimum requirement is adequate resources (available to the tenderer) within the firm providing the PSCS service
- The minimum requirement is adequate resources (available to the tenderer) within the firm providing the PSCS service to
- Prepare planned preventative maintenance schedules for 12 months from practical completion
- the successful Tenderer shall be required to supply its Tax Clearance Access
- status by the Employer. By supplying these numbers the successful Tenderer
- 2B submitted with its Tender that the parent company will supply a parent
- operations subject to Relevant Contracts Tax (and therefore to reverse-charge Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.
3. Background & buyer context
The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.
- derer will be required to produce evidence from their Insurance Company in the form of a copy of the policy confirming that the tenderer has current Public Liability Insurance with a minimum level of cover of €6,500,000 in accordance with the conditions stated
- derer will be required to produce evidence from their Insurance Company in the form of a copy of the policy confirming that the tenderer has current Employer’s Liability Insurance with a minimum level of cover in respect of any one incident of €13,000,000. I/we will provide evidence (in the form
- nderer will be required to produce evidence from their Insurance Company in the form of a copy of the policy confirming that the tenderer has current Public Liability Insurance with a minimum level of cover of €6,500,000 in accordance with the conditions sta
- nderer will be required to produce evidence from their Insurance Company in the form of a copy of the policy confirming that the tenderer has current Employer’s Liability Insurance with a minimum level of cover in respect of any one incident of €13,000,000. I/we will provide evidence (in the f
4. Eligibility & selection criteria
- Turnover requirement — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Insurance — — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.; Minimum indemnity limit for Public liability insurance: €6,500,0006 for any one event, but this limit may be; Minimum indemnity limit for Employers’ liability insurance: €13,000,0007 for any one event
- Certifications — eason this evidence cannot be provided then alternative evidence that is considered appropriate by the Contracting Authority may be provided): (i) Minimum level of Professional Indemnity Insurance required for Works Contractor is [€1,000,000]; (ii) Maximum permissible excess on P
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender Additional binding lines surfaced in the deterministic extract:
- — use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.
- Minimum indemnity limit for Public liability insurance: €6,500,0006 for any one event, but this limit may be
- Minimum indemnity limit for Employers’ liability insurance: €13,000,0007 for any one event
- If required, the minimum indemnity limit for professional indemnity insurance shall be €1,000,000 annual aggregate limit
- consequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage Lintols designer concrete - Product Liability Insurance required covering the consequence of goods being defective and also the delivery and supply of incorrect goods which cause injury and damage Storm water Attenuation Designer - PI €1m annual aggregate Anchor designer - P
- The minimum Turnover requirement is [€5,000,000.00] The minimum Turnover requirement is
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail threshold |
|---|---|---|---|
| Maximum permissible excess on Professional Indemnity Insurance in any one claim | 2% | not stated | not stated |
| The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract. |
6. Submission requirements
- Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
- CVs (page count, named roles) — not specified in extract.
- Pricing schedule (format/template) — expected at ITT stage.
- Case studies (number/value range) — client references/comparable project evidence was referenced.
- Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
- Mandatory site visit — not specified in extract.
- Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
- Value: not disclosed (eTenders placeholder)
- [Instruction to Tenderers - Gaelscoil Lorgan.pdf] Instruction to Tenderers
- [Instruction to Tenderers - Gaelscoil Lorgan.pdf] on its behalf,
- [Instruction to Tenderers - Gaelscoil Lorgan.pdf] Tenderers. They are not being distributed to the public, and
- [Instruction to Tenderers - Gaelscoil Lorgan.pdf] as it becomes apparent to the Tenderer. The Employer will decide on
- The Employer has sent a contract notice for the Works to etenders and where
7. Key dates & process
| Milestone | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | not specified |
| Mandatory site visit | not specified |
| Tender deadline (date + time) | 2023-09-08T15:00:00+00:00 |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not stated |
| Date surfaced in documents | 2023-09-08T15:00:00+00:00 |
| Date surfaced in documents | 10 Apr 2019 |
| Date surfaced in documents | 23 Sep 2021 |
| Date surfaced in documents | 7 January 2022 |
8. Contract terms that matter
Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.
- VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
- Minimum amount for interim payments, except release of retention, € 5,000
- Within 3 months after receipt of the Contractor’s final statement, the Employer’s
- lace arrangements to complete the Works within 6 months after the termination, the Employer’s Representative shall issue this certificate as soon
- within 5m of the fan equipment/ doorway must be
- the date 10 days before the last day for receipt of the
- 2 shall be final and binding on the Parties unless, within 28 days after receiving notice of the determina
- binding on the Parties unless, within 28 days after receiving notice of the determina
9. Risks, red flags & unusuals
- Qualification gate: the deterministic extract included a turnover threshold line (— use these verbatim for insurance / turnover. If a category (insurance, turnover) has no entry here, treat it as 'not specified' for THIS tender.), which can materially narrow bidder pool composition.
- Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
- The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
- Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.
10. SME fit assessment
This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.
- Credible bidder profile — mid-sized to large specialist with formal QA/compliance process.
- Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
- Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
- Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.
11. Where to dig deeper
- Source RFT/PQQ filenames: Instruction to Tenderers - Gaelscoil Lorgan.pdf, Schedule and, schedules.
- eTenders CFT / notice reference: contract notice for the Works to etenders and where.
- Clarification contact / portal: eTenders message portal (email not surfaced in extract).
- Key attachments to prioritise: schedules for 12 months from practical completion, ITT-W2 v 2.3 07/01/2022, ITT-W2 V2.3.
This tender has been awarded
- C.J. Callan Construction Ltd · 26 Aug 2024
Can you bid?
Required certifications
- Professional Indemnity Insurance
Minimum turnover
€5,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,000,000
Scoring
Lowest Price
Documents (238)
21-052 - A1 - Project Particular.pdf
913.9 KB · Specification
21-052- QC Doc - Part B.pdf
165.7 KB · Specification
Volume A 2.4 Part 2 Gael Scoil Lorgan Castleblayney General Responsibilities 2793.pdf
388.9 KB · Specification
Volume A.2.3 Mech Spec Part 1 - Project Particulars 2793.pdf
851.5 KB · Specification
Volume A.2.3 Mech Spec Part 2 - General Responsibilities 2793.pdf
437.8 KB · Specification
Volume A.2.3 Mech Spec Part 4 - Equipment Schedules 2793.pdf
1.2 MB · Specification
Instruction to Tenderers - Gaelscoil Lorgan.pdf
369.5 KB · RFT / Invitation to Tender
CITE.zip
399.1 KB · Pricing / BOQ / Schedule of Rates
Volume A.2.5 - Preliminaries Text Version.pdf
427.5 KB · Pricing / BOQ / Schedule of Rates
Volume C Electrical Pricing Document 2793.pdf
180.6 KB · Pricing / BOQ / Schedule of Rates
MF-1.10-09-04-2020.docx
51.1 KB · Contract / Agreement / Terms
MF-1.18-28-06-2018-REV.docx
61.3 KB · Contract / Agreement / Terms
PW-CF1-A2-09-12-2019.docx
31.9 KB · Contract / Agreement / Terms
PW-CF1-v2.6-07-01-2022.pdf
1.2 MB · Contract / Agreement / Terms
2023-02-28 BCAR M&E INF PIP 2793.pdf
93.1 KB · Form / Declaration / Certificate
21-052 - Gaelscoil Lorgan - School - DAC Report.pdf
202.7 KB · Form / Declaration / Certificate
21-052 - OPP PIP.Tender Stage.pdf
288.0 KB · Form / Declaration / Certificate
21-052 Gaelscoil Lorgan Application-Form-2021.pdf
265.2 KB · Form / Declaration / Certificate
DAC2205115MN, DAC22#28 - GAELSCOIL LORGAN - GRANT WITH CONDITIONS.pdf
72.9 KB · Form / Declaration / Certificate
DoES-QW2 Suitability Questionnaire-Open.docx
520.9 KB · Form / Declaration / Certificate
DoES-QW2 Suitability Questionnaire-Open.pdf
484.0 KB · Form / Declaration / Certificate
form-b2-certificate-of-satisfactory-execution-april-2019.docx
53.8 KB · Form / Declaration / Certificate
Form_of_Application_for_a_Disability_Access_Certificate (1)_Signed.pdf
205.0 KB · Form / Declaration / Certificate
Form_of_Application_for_a_Fire_Safety_Certificate_Signed.pdf
251.2 KB · Form / Declaration / Certificate
FSC Grant.pdf
68.7 KB · Form / Declaration / Certificate
MF-1.13-09-04-2020.docx
46.0 KB · Form / Declaration / Certificate
MF-1.14-09-04-2020.docx
54.9 KB · Form / Declaration / Certificate
MF-1.6-09-04-2020.docx
55.6 KB · Form / Declaration / Certificate
MF-1.7-09-04-2020.docx
63.3 KB · Form / Declaration / Certificate
21049-DOW-00-EV-DR-SE-1002_Prop_Eav_PL_A2B-C02.pdf
207.4 KB · Drawing / Plan / Layout
21049-DOW-00-EV-DR-SE-6002-Eaves Level RC Details Sheet 1-A2B-C01.pdf
284.8 KB · Drawing / Plan / Layout
21049-DOW-00-EV-DR-SE-6003-Eaves Level RC Details Sheet 2-A2B-C01.pdf
248.8 KB · Drawing / Plan / Layout
21049-DOW-00-EV-DR-SE-6004-Eaves Level RC Details Sheet 3-A2B-C01.pdf
250.2 KB · Drawing / Plan / Layout
21049-DOW-00-EV-DR-SE-6005-Eaves Level RC Details Sheet 4-A2B-C01.pdf
270.5 KB · Drawing / Plan / Layout
21049-DOW-00-EV-DR-SE-6006-Eaves Level RC Details Sheet 5-A2B-C01.pdf
249.4 KB · Drawing / Plan / Layout
21049-DOW-00-EV-SH-SE-6003-Eaves Level RC Details Sheet 2-A2B-C01.pdf
37.8 KB · Drawing / Plan / Layout
21049-DOW-00-EV-SH-SE-6004-Eaves Level RC Details Sheet 3-A2B-C01.pdf
42.8 KB · Drawing / Plan / Layout
21049-DOW-00-EV-SH-SE-6005-Eaves Level RC Details Sheet 4-A2B-C01.pdf
49.0 KB · Drawing / Plan / Layout
21049-DOW-00-EV-SH-SE-6006-Eaves Level RC Details Sheet 5-A2B-C01.pdf
43.0 KB · Drawing / Plan / Layout
21049-DOW-00-F1-DR-SE-1000_Prop_Found_PL_A2B-C02.pdf
228.3 KB · Drawing / Plan / Layout
21049-DOW-00-F1-DR-SE-6000-Foundation RC Details-A2B-C01.pdf
272.1 KB · Drawing / Plan / Layout
21049-DOW-00-F1-SH-SE-6000-Foundation RC Details-A2B-C01.pdf
26.3 KB · Drawing / Plan / Layout
21049-DOW-00-GF-DR-SE-1001_Prop_GF_PL_A2B-C02.pdf
267.0 KB · Drawing / Plan / Layout
21049-DOW-00-RF-DR-SE-1003_Prop_RF_PL_A2B-C02.pdf
242.6 KB · Drawing / Plan / Layout
21049-DOW-00-RF-DR-SE-6007-Roof Level RC Details Sheet 1-A2B-C01.pdf
262.2 KB · Drawing / Plan / Layout
21049-DOW-00-RF-DR-SE-6008-Roof Level RC Details Sheet 2-A2B-C01.pdf
243.9 KB · Drawing / Plan / Layout
21049-DOW-00-RF-DR-SE-6009-Roof Level RC Details Sheet 3-A2B-C01.pdf
263.4 KB · Drawing / Plan / Layout
21049-DOW-00-RF-DR-SE-6010-Roof Slab RC Details-A2B-C01.pdf
280.8 KB · Drawing / Plan / Layout
21049-DOW-00-RF-SH-SE-6008-Roof Level RC Details Sheet 2-A2B-C01.pdf
42.9 KB · Drawing / Plan / Layout
21049-DOW-00-RF-SH-SE-6009-Roof Level RC Details Sheet 3-A2B-C01.pdf
59.7 KB · Drawing / Plan / Layout
21049-DOW-00-RF-SH-SE-6010-Roof Slab RC Details-A2B-C01.pdf
31.9 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5100_Pipe_Bed_Det_A2B-C02.pdf
382.9 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5101_Wat_Det_A2B-C02.pdf
289.0 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5102_Manhole_Det_SH_1_A2B_C02.pdf
423.5 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5103_Manhole_Det_SH_2_A2B_C02.pdf
426.9 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5104_Gully_Det_A2B_C02.pdf
249.8 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5105_Paving_Det_A2B_C02.pdf
265.1 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5106_Road_Surf_Det_A2B_C02.pdf
228.8 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-CE-5107-A2B-P01-Proposed Bike Shelfter Details.pdf
231.4 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-SE-6001-Column RC Details-A2B-C01.pdf
252.0 KB · Drawing / Plan / Layout
21049-DOW-00-XX-DR-SE-6011-Retaining Wall RC Details-A2B-C01.pdf
270.7 KB · Drawing / Plan / Layout
21049-DOW-00-XX-SH-SE-6001-Column RC Details-A2B-C01.pdf
42.8 KB · Drawing / Plan / Layout
21049-DOW-00-XX-SH-SE-6011-Retaining Wall RC Details-A2B-C01.pdf
37.2 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-2000_Prop_FHS_SH1_A2B-C02.pdf
318.4 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-2001_Prop_FHS_SH2_A2B-C02.pdf
171.2 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-3000_Prop_EL_SH1_A2B-C02.pdf
253.0 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-3001_Prop_EL_SH2_A2B-C02.pdf
148.0 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4000_Prop_Found_Det_A2B-C02.pdf
163.0 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4001_Prop_EV+RF_Det_SH1_A2B-C02.pdf
175.5 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4002_Prop_EV+RF_Det_SH2_A2B-C02.pdf
150.7 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4003_Prop_ST_Det_A2B-C02.pdf
115.9 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4004_Prop_Truss_Det_A2B-C02.pdf
244.8 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4005_Prop_Con_Det_SH1_A2B-C02.pdf
172.5 KB · Drawing / Plan / Layout
21049-DOW-00-ZZ-DR-SE-4006_Prop_Con_Det_SH2_A2B-C02.pdf
135.8 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5000-A2B-P03-Existing Site Layout.pdf
415.4 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5001-A2B-P05-Proposed Site Drainage Layout.pdf
939.5 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5002-A2B-P04 Proposed Site Levels & Watermain Layout.pdf
940.8 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5003-A2B-P01-Proposed Site Drainage Sections.pdf
252.8 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5004-A2B-P01-Proposed Site Entrance & Exit Sections.pdf
223.4 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5005-A2B-P01-Proposed Site Sections.pdf
632.8 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5010-A2B-P04 Propsoed Road Markings & Sight Lines.pdf
1.0 MB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5011-A2B-P04-Swepth Analysis.pdf
1.1 MB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5012-A2B-P04-Swepth Analysis Sheet.pdf
864.7 KB · Drawing / Plan / Layout
21049-LORG-DOW-00-XX-DR-CE-5017-S1-P01-Swepth Analysis Sheet 2.pdf
797.9 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-0001-D2-P01.pdf
206.0 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-0003-D2-P01.pdf
254.5 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-0004-D2-P02.pdf
1.2 MB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-0005-D2-P02.pdf
1.1 MB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-4001-D2-P01.pdf
195.3 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-4002-D2-P01.pdf
202.0 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-4003-D2-P01.pdf
160.2 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-4004-D2-P01.pdf
184.1 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9201-PL-P01 - Site Location Map.pdf
207.0 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9202-PL-P01 - Existing Site Plan.pdf
121.2 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9203-PL-P01 - Proposed Site Plan.pdf
727.3 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9204-PL-P01 - Proposed Landscape Plan.pdf
647.4 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9401-FC-P01.pdf
366.9 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9402-FC-P01.pdf
121.0 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9403-FC-P01.pdf
627.6 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9403-P02 - Proposed Site Plan.pdf
659.0 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9501-DC-P01.pdf
425.1 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9502-DC-P01.pdf
121.6 KB · Drawing / Plan / Layout
21052-OPP-00-00-DR-A-9503-DC-P01.pdf
745.5 KB · Drawing / Plan / Layout
21052-OPP-00-XX-IS-A-0001-D2-P03 - Gaelscoil Lorgan Issue Sheet.pdf
108.2 KB · Drawing / Plan / Layout
21052-OPP-00-ZZ-DR-A-0101-D2-P01.pdf
3.6 MB · Drawing / Plan / Layout
21052-OPP-00-ZZ-DR-A-9231-PL-P01 - Proposed Site Sections and Contextual Elevation.pdf
4.4 MB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-1201-D2-P01.pdf
888.4 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-1212-D2-P01.pdf
1.1 MB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-1221-D2-P01.pdf
952.4 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-1231-D2-P01.pdf
246.4 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-1241-D2-P01.pdf
334.3 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4005-D2-P01.pdf
387.2 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4101-D2-P01.pdf
1.6 MB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4102-D2-P01.pdf
2.4 MB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4103-D2-P01.pdf
1.6 MB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4104-D2-P01.pdf
826.3 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4105-D2-P01.pdf
396.5 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4115-D2-P01.pdf
900.6 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-4116-D2-P01.pdf
271.0 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-9211-PL-P01 - Proposed Ground Floor Plan & Water Tank Room Plan.pdf
240.7 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-9411-FC-P01.pdf
628.2 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-9411-FC-P02 FSC - Ground Floor Plan.pdf
669.0 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-9441-FC-P01.pdf
250.9 KB · Drawing / Plan / Layout
21052-OPP-01-00-DR-A-9511-DC-P01.pdf
562.7 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-1202-D2-P02.pdf
474.2 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4106-D2-P01.pdf
412.2 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4107-D2-P01.pdf
623.8 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4108-D2-P01.pdf
173.8 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4109-D2-P01.pdf
426.0 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4110-D2-P01.pdf
270.1 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4111-D2-P01.pdf
402.4 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4112-D2-P01.pdf
321.0 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4113-D2-P01.pdf
273.2 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-4114-D2-P01.pdf
186.4 KB · Drawing / Plan / Layout
21052-OPP-01-RF-DR-A-9212-PL-P01 - Proposed Roof Plan.pdf
123.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-1251-D2-P01.pdf
318.0 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2001-D2-P01.pdf
431.3 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2002-D2-P01.pdf
1.0 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2003-D2-P01.pdf
992.5 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2021-D2-P01.pdf
313.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2022-D2-P01.pdf
1015.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-2023-D2-P01.pdf
731.4 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-3001-D2-P01.pdf
598.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-3002-D2-P01.pdf
579.9 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-3003-D2-P01.pdf
594.2 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-4117-D2-P01.pdf
246.4 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-6001-D2-P01.pdf
925.2 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-6002-D2-P01.pdf
221.2 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-6003-D2-P01.pdf
173.5 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-6004-D2-P01.pdf
178.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7001-D2-P01.pdf
1.1 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7002-D2-P01.pdf
1.0 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7003-D2-P01.pdf
1.2 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7004-D2-P01.pdf
1.1 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7005-D2-P01.pdf
412.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7006-D2-P01.pdf
467.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7007-D2-P01.pdf
176.5 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7008-D2-P01.pdf
127.9 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7009-D2-P01.pdf
382.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7010-D2-P01.pdf
150.0 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7011-D2-P01.pdf
172.4 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7012-D2-P01.pdf
165.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7013-D2-P01.pdf
140.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7014-D2-P01.pdf
131.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7015-D2-P01.pdf
134.5 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7016-D2-P01.pdf
157.2 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7017-D2-P01.pdf
283.9 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7018-D2-P01.pdf
220.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7019-D2-P01.pdf
217.0 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-7020-D2-P01.pdf
191.0 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9221-PL-P01 - Proposed Elevations - 1-2.pdf
269.4 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9222-PL-P01 - Proposed Elevations - 2-2.pdf
280.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9232-PL-P01 - Proposed Sections AA, BB.pdf
289.6 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9333-PL-P01 - Proposed Sections CC, DD.pdf
174.2 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9421-FC-P01.pdf
330.1 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-DR-A-9521-DC-P01.pdf
297.7 KB · Drawing / Plan / Layout
21052-OPP-01-ZZ-M3-0001 - Site_Planning - Sheet - 9241 - Proposed 3D Visualisation 1-2.pdf
1.4 MB · Drawing / Plan / Layout
21052-OPP-01-ZZ-M3-0001 - Site_Planning - Sheet - 9242 - Proposed 3D Visualisation 2-2.pdf
1.7 MB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5001_SITE.pdf
875.0 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5101_ BOILER HOUSE.pdf
599.6 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5201_SOILS.pdf
749.8 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5301_PLUMB.pdf
812.5 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5350_PLUMB SCHEMATIC.pdf
523.0 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5351_RAIN WATER SCHEMATIC.pdf
803.5 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5601_HEAT.pdf
836.4 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5650-HEAT SCHEMATIC.pdf
610.9 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5701_VENT.pdf
1005.5 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-M-5750_VENT SCHEMATIC.pdf
441.2 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-ME-5801_BMS MECHANICAL WIRING.pdf
695.2 KB · Drawing / Plan / Layout
2793-SMK-ZZ-L0-DR-ME-5802_BMS MECHANICAL WIRING.pdf
852.5 KB · Drawing / Plan / Layout
E6101 Dist Board Zoning.pdf
958.7 KB · Drawing / Plan / Layout
E6201 Small Power & Data..pdf
1.6 MB · Drawing / Plan / Layout
E6202 Solar PV..pdf
609.9 KB · Drawing / Plan / Layout
E6301 General Lighting..pdf
1.2 MB · Drawing / Plan / Layout
E6302 Emergency Lighting.pdf
628.4 KB · Drawing / Plan / Layout
E6501 LV Switchgear.pdf
5.9 MB · Drawing / Plan / Layout
E6701 Fire Alarms.pdf
719.9 KB · Drawing / Plan / Layout
E6801 Security.pdf
584.2 KB · Drawing / Plan / Layout
E6901 Lightning Protection.pdf
384.0 KB · Drawing / Plan / Layout
ME5061 Existing Site Utilities.pdf
770.9 KB · Drawing / Plan / Layout
ME5062 Proposed Site Utilities.pdf
1.4 MB · Drawing / Plan / Layout
ME5063 Proposed EV Car Charging.pdf
1.4 MB · Drawing / Plan / Layout
ME5064 Proposed Site Lighting.pdf
942.5 KB · Drawing / Plan / Layout
ME5065 Proposed Grey Water.pdf
1.3 MB · Drawing / Plan / Layout
ME5067 Infrastructure Routes.pdf
8.3 MB · Drawing / Plan / Layout
ME6051 RWH Schematic.pdf
704.1 KB · Drawing / Plan / Layout
ME6052 eCar Charging Schematic.pdf
1.3 MB · Drawing / Plan / Layout
ME6053 Petrol Interceptor Schematic.pdf
382.6 KB · Drawing / Plan / Layout
MP_Gaelscoil_Lorgan_26_08_22.pdf
17.0 MB · Drawing / Plan / Layout
SGL_21233_Castleblaney_31.08.21_-Layout1.pdf
524.0 KB · Drawing / Plan / Layout
SGL_21233_Castleblaney_31.08.21_-Layout2.pdf
587.3 KB · Drawing / Plan / Layout
SGL_21233_Castleblaney_31.08.21_-Layout3.pdf
563.2 KB · Drawing / Plan / Layout
SGL_21233_Castleblaney_31.08.21_-Layout4.pdf
393.8 KB · Drawing / Plan / Layout
11175 -PSDP- Preliminary Health & Safety Plan - Gaelscoil Lorgan.pdf
1.5 MB · Other
21052 Gaelscoil Lorgan FSC Report RFI 23.09.2022.pdf
224.8 KB · Other
21052 Gaelscoil Lorgan FSC Report.pdf
226.7 KB · Other
GI Report Project Gealscoil Lorgan, Castleblayney 24-01-20 Rev A.pdf
6.1 MB · Other
21-052 Gaelscoil Lorgan - Application Letter.pdf
593.5 KB
21-052 Gaelscoil Lorgan Site Notice.pdf
539.7 KB
21-052 PP Appendix C - list of ancillary certs.pdf
194.0 KB · Appendix / Annex
21-052-NBS Tender Issue-2023-01-12.pdf
1.2 MB
21049 DA Specification REV A Jan 23.pdf
2.7 MB
21049-DOW-XX-XX-RG-IM-0001-Document Issue Register.pdf
178.3 KB · Appendix / Annex
21052 Ironmongery Schedule - Stage 2B.pdf
8.9 MB
21052 Sanitaryware Schedule - Stage 2B.pdf
396.4 KB · Appendix / Annex
Further Information Response Letter.pdf
532.5 KB · Clarification / Addendum
Gaelscoil Lorgan - Notif of Decision.pdf
651.8 KB
ME5801 BMS Mechanical Wiring.pdf
1.7 MB
ME5802 BMS Mechanical Wiring.pdf
1.6 MB
MF-1.11-09-04-2020.docx
46.6 KB · Insurance / Indemnity
MF-1.31-Site-Closure-Costs-Supplement-29-07-2021.docx
39.1 KB · Appendix / Annex
Schedule of Mechanical Certs 2793.pdf
254.4 KB · Appendix / Annex
Volume A 2.4 Part 1 Gael Scoil Lorgan Castleblayney Electrical Specification 2793.pdf
1.6 MB
Volume A 2.4 Part 3 Gael Scoil Lorgan Castleblayney Standard Clauses 2793.pdf
701.8 KB
Volume A 2.4 Part 4 Gael Scoil Lorgan Castleblayney Equipment Schedule 2793.pdf
1.2 MB · Appendix / Annex
Volume A.2.3 Mech Spec Part 3 - Standard Clauses 2793.pdf
1.4 MB
Volume B Tender and Schedule - Gaelscoil Lorgan.pdf
493.8 KB · Appendix / Annex
Volume C - Gaelscoil Lorgan, Castleblayney.pdf
1.5 MB
Original notice text
This tender involves the construction of a new single storey primary school with eight classrooms and a General Purpose Hall for Gaelscoil Lorgan, located at Shercock Road, Killycard, Castleblayney, Co Monaghan.
AI analysis updated 4 months ago
Deadline
08 Sep
Location
Shercock Road, Killycard, Castleblayney, Co Monaghan, Ireland
Procedure
Open
Clarification
25 Jul 2023
eTenders ID
1994163
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender