Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Modern Methods of Construction Data Dashboard
Awarded IT & Software Services Open

Modern Methods of Construction Data Dashboard

Deadline

10 Aug

Operational contract for a Modern Methods of Construction Data Dashboard

SME fit: Medium Bid effort: Medium 📍 Ireland

Operational contract for a Modern Methods of Construction Data Dashboard

Bidder profile

Firms with experience in public sector tenders and operational capabilities in data services.

Risks & flags

  • Undisclosed contract value
  • Two-step tender process
  • Ambiguity in requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer The Department of Enterprise Tourism and Employment
Title Modern Methods of Construction Data Dashboard
CPV / category services
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location Ireland
Contract length 12 months
Submission deadline 2023-08-10T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

The Department of Enterprise Tourism and Employment ran this procurement for “Modern Methods of Construction Data Dashboard” as an operational contract requiring implementation and sustained service execution. The extracted pack showed qualification-stage material with references to later ITT technical depth; practical activity therefore centred on building, integrating, and operating the specified service stack with compliant reporting and handover obligations where stated. Constituent activities and named work elements in the supplied extracts:

  • ty estimates that the expenditure on the Services to be covered by the proposed Services Contract may amount to some €75,000 (excl
  • Typical MMC systems include timber frame, steel frame, and precast concrete
  • rer shall be required to supply its Tax Clearance Access Number and Tax Reference Number to facilitate online verification of their tax status by
  • tion (the “Services Contract”) will be issued for a term of 6 months (“the Term”)
  • Prior to and as a condition of award of any Services Contract, the successful Tenderer shall be required to designate a single entity who will carry overall responsibility for the Services Contract (the “Prime Contractor”), irrespective of whether or not tasks
  • Prior to and as a condition of award of any Services Contract, the successful Tenderer shall be required to designate a single entity who will carry overall responsibility for the Services Contract (the “Prime Contractor”), irrespective of whether or not tasks are to be performed by a subcontractor or other consortium member (the “Subcontractor”).
  • No publicity regarding this Competition or any Services Contract pursuant to this Competition is permitted unless and until the Contracting Authority has given its prior written consent to the relevant communication.
  • The terms “Registrable Interest” and “Relative” shall be interpreted as per Section 2 of the Ethics in Public Office Acts 1995 and 2001, copies of which are available at www.irishstatutebook.ie. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or terminating any Services Contract entered into by a Tenderer.
  • [20230627 - FINAL - Modern Methods of Construction Data Dashboard.docx] the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or terminating any Services Contract entered into by a Tenderer.
  • Any conflict of interest or potential conflict of interest on the part of a Tenderer, Subcontractor or individual employee(s) or agent(s) of a Tenderer or Subcontractor(s) must be fully disclosed to the Contracting Authority as soon as the conflict or potential conflict is or becomes apparent. Tenderers are required to declare that the preparation of their Tender was carried out independently. In the event of any actual or potential conflict of interest, the Contracting Authority may invite Tenderers to propose means by which the conflict of interest might be removed and in circumstances where there are links between Tenderers, the Contracting Authority may seek further information to confirm the Tenders have been prepared independently. The Contracting Authority will, at its absolute discretion, decide on the appropriate course of action, which may in appropriate circumstances include eliminating a Tenderer from this Competition or any Mini-Competition or terminating any Framework Agreement or Services Contract entered into by a Tenderer.
  • [20230627 - FINAL - Modern Methods of Construction Data Dashboard.docx] from this Competition or any Mini-Competition or terminating any Framework Agreement or Services Contract entered into by a Tenderer.
  • Tenderers must address each of the issues and requirements in this part of the RFT and submit a detailed description in each case which demonstrates how these issues and requirements will be dealt with / met and their approach to the proposed delivery of the Services. A mere affirmative statement by the Tenderer that it can/will do so or a reiteration Non-binding monetary references in the source were treated as context only and were not used as qualification thresholds.

3. Background & buyer context

The buyer context reflected a formal Irish public-procurement route, with pre-qualification used to control entry into the tender stage.

  • The output from the study will enable the Department to create a baseline assessment of the levels of MMC adoption in the Irish construction sector and provide a framework or dashboard of metrics that can continue to inform the Department’s ongoing work and policy impact over time in the area of MMC adoption and promoting innovation in construction, which is a key focus in the Government’s Housing for All Strategy.
  • As the Department, through the MMC LIG, engages in policy development to promote MMC in residential construction in Ireland, it is crucial that we have a robust set of indicators to benchmark and track progress and policy impact. The overarching objectives for this research and analysis assignment are as follows:
  • Identification of existing data from a variety of potential sources;
  • Formulation of recommendations as to the future gathering of data, including augmenting of existing data gathering mechanisms and potentially repeat survey work; and

4. Eligibility & selection criteria

  • Turnover requirement — not specified for this tender
  • Insurance — not specified for this tender
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail threshold
Quality not stated Methodology / implementation detail not stated in extract not stated
Price not stated Pricing basis not stated in extract not stated
The documents indicated a staged process (qualification, then tender). Any explicit MEAT split is captured above where a numeric line was visible; otherwise it remained not specified in the provided text extract.

6. Submission requirements

  • Method statement / response document (template/page limits) — Appendix 1 questionnaire/PQQ response was required.
  • CVs (page count, named roles) — not specified in extract.
  • Pricing schedule (format/template) — expected at ITT stage.
  • Case studies (number/value range) — client references/comparable project evidence was referenced.
  • Declarations (ESPD/Bona Fides/Tax/COI) — ESPD/declaration/statement-of-confirmation language was present.
  • Mandatory site visit — not specified in extract.
  • Submission portal and formatting — eTenders portal and PDF electronic copies were referenced. Submission-related source lines:
  • Value: not disclosed (eTenders placeholder)
  • Each Tenderer is required to accept the provisions of this RFT. ALL TENDERERS MUST RETURN, with their Tender, a scanned signed copy of the Tenderer’s Statement, as set out in Appendix 3, printed on the Tenderer’s letterhead. The Contracting Authority must be able to read the scanned signature of the Tenderer. If possible, please sign documents using blue ink. If the Contracting Authority cannot read the scanned signature, Tenderers may be requested to re-submit. Tenderers may not amend the Tenderer’s Statement.
  • Where a group of undertakings (in whatever form and regardless of the legal relationship between them) come together to submit a Tender in response to this RFT, the Contracting Authority will deal with all matters relating to this Competition through a single nominated entity authorised to represent all members of the group of undertakings. The Tenderer must provide details of all members of the group of undertakings and their role in the Tender and clearly set out the contact details including name, title, telephone number, postal address, facsimile number and e-mail address of the nominated entity authorised to represent the Tenderer and to whom all communications shall be directed and accepted until this Competition has been completed or terminated. Correspondence from any other person will NOT be accepted, acknowledged or responded to.
  • Tenderers are required to notify the Contracting Authority immediately via the e-tenders website, if at any stage they decide to
  • Tenderers are required to notify the Contracting Authority immediately via the e-tenders website, if at any stage they decide to withdraw from this Competition.
  • Marks will be awarded based on the quality and comprehensiveness of the proposed approach and the Tenderer’s understanding in addressing the requirements specified in detail in Appendix 1 to this RFT. The following approach will be used:

7. Key dates & process

Milestone Date
RFT issued not specified
Clarification deadline not specified
Mandatory site visit not specified
Tender deadline (date + time) 2023-08-10T16:00:00+00:00
Expected award not specified
Contract start not specified
Go-live / mobilisation not stated
Date surfaced in documents 2023-08-10T16:00:00+00:00
Date surfaced in documents 10 August 2023
Date surfaced in documents January 2024
Date surfaced in documents August 2023

8. Contract terms that matter

Contract duration in the extract: 12 months. Payment cycle, SLA/KPI schedule, and penalty regime were not fully disclosed in the snippets unless listed below.

  • VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims)
  • tion (the “Services Contract”) will be issued for a term of 6 months (“the Term”)
  • e right to extend the Term for a period or periods of up to 2 months with a maximum of 2 such extension or e
  • ontinues for 20 calendar days either Party may terminate at 14 days notice
  • breach(es) (if the breach(es) are capable of remedy) within 30 days after receipt of a request in writing f
  • ) are capable of remedy) within 30 days after receipt of a request in writing f
  • For the Term and for a period of 12 months thereafter (and save in respect of publ
  • Where a group of undertakings (in whatever form and regardless of the legal relationship between them) come together to submit a Tender in response to this RFT, the Contracting Authority will deal with all matters relating to this Competition through a single nominated entity authorised to represent all members of the group of undertakings. The Tenderer must provide details of all members of the group of undertakings and their role in the Tender and clearly set out the contact details including name, title, telephone number, postal address, facsimile number and e-mail address of the nominated entity authorised to represent the Tenderer and to whom all communications shall be directed and accepted until this Competition has been completed or terminated. Correspondence from any other person will NOT be accepted, acknowledged or responded to.

9. Risks, red flags & unusuals

  • Numeric qualification gates were only partially visible, so eligibility certainty required full pack review.
  • Contract value was not disclosed in metadata, creating uncertainty on margin, resourcing, and financing assumptions.
  • The two-step process (PQQ then ITT) shifted effort to compliance evidence early, with competitive scoring detail potentially deferred.
  • Technical and contractual granularity appeared ITT-dependent, increasing ambiguity at qualification stage for non-incumbent bidders.

10. SME fit assessment

This competition looked most accessible to firms with established public-sector tender capability, documented financial capacity, and direct operational experience in the relevant service category.

  • Credible bidder profile — specialist operator with compliant procurement governance and evidencable experience.
  • Consortium / sub-contracting — allowed or addressed in the extracts (Appendix references and reliance provisions).
  • Indicative bid-prep effort — 6 to 12 working days for evidence collation, form completion, and review cycles at PQQ level.
  • Pwin signal — strongest for bidders with reusable qualification artefacts, comparable references, and low-friction mobilisation capability.

11. Where to dig deeper

  • Source RFT/PQQ filenames: 20230627 - FINAL - Modern Methods of Construction Data Dashboard.docx, RFT Requirements, RFT. ALL TENDERERS MUST RETURN, with their Tender, a scanned signed copy of the Ten.
  • eTenders CFT / notice reference: not specified in extract.
  • Clarification contact / portal: eTenders message portal (email not surfaced in extract).
  • Key attachments to prioritise: Appendix 3, printed on the Tenderer’s letterhead. The Contracting Authority must be able, RFT, the Contracting Authority will deal with all matters relating to this Competit, RFT.

This tender has been awarded

Scoring

Most Economically Advantageous Tender

Documents (1)

DOCX

20230627 - FINAL - Modern Methods of Construction Data Dashboard.docx

171.1 KB · RFT / Invitation to Tender

Original notice text

The Department of Enterprise Tourism and Employment seeks to implement and sustain a data dashboard for Modern Methods of Construction, focusing on metrics to inform policy and innovation in the construction sector.

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

10 Aug

View on eTenders ↗

Location

Services to be provided across Ireland.

Procedure

Open

Clarification

03 Aug 2023

eTenders ID

1988308

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender