← Tenders / Airfield Rehabilitation of Taxiway Alpha and Associated Works at Shannon Airport
Awarded Construction & Civil Engineering Works Restricted

Airfield Rehabilitation of Taxiway Alpha and Associated Works at Shannon Airport

Value

€2.0m

Deadline

17 Jul

Rehabilitation of Taxiway Alpha and associated works at Shannon Airport.

SME fit: Medium Bid effort: Medium 📍 Clare

Rehabilitation of Taxiway Alpha and associated works at Shannon Airport.

Bidder profile

Firms with experience in public procurement and construction works, capable of meeting insurance and turnover requirements.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Airport Authority DAC
Title AIRFIELD REHABILITATION OF TAXIWAY ALPHA AND ASSOCIATED WORKS AT SHANNON AIRPORT
CPV / category works / Construction & Civil Engineering
Estimated value €2000000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2023-07-17T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for AIRFIELD REHABILITATION OF TAXIWAY ALPHA AND ASSOCIATED WORKS AT SHANNON AIRPORT. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Shannon Airport Authority DAC.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and conformance with specification, quality, and administrative requirements.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: 8 of Volume 2A Works Requirements: Project Particulars 1 Sum B Public Liability Insurance - minimum level of Public Liability for works up to €13m limit as per clause 5; 8 of Volume 2A Works Requirements: Project Particulars 1 sum Project Particulars 1 Sum B Public Liability Insurance - minimum level of Public Liability for works up to €13m limit as per clause 5; 8 of Volume 2A Works Requirements: Project Particulars 1 sum C Employers Liability Insurance - Minimum level of €13m

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — turnover requirements for any three of the previous four years; 2018, 2019, 2020 and 2021: o A minimum of €6m
  • Insurance
  • Public Liability — €13m
  • Employer's Liability — €13,000,000
  • Professional Indemnity — €6,500,000
  • Motor — €127m
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: 8 of Volume 2A Works Requirements: Project Particulars 1 Sum B Public Liability Insurance - minimum level of Public Liability for works up to €13m limit as per clause 5; 8 of Volume 2A Works Requirements: Project Particulars 1 sum Project Particulars 1 Sum B Public Liability Insurance - minimum level of Public Liability for works up to €13m limit as per clause 5; 8 of Volume 2A Works Requirements: Project Particulars 1 sum C Employers Liability Insurance - Minimum level of €13m

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2023-07-17T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 11640 - SAG Airfield Rehab - Instructions to Tender.pdf, 11640-8201.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: 11640 - SAG Airfield Rehab - Instructions to Tender.pdf, 11640-8201.pdf

This tender has been awarded

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€6,000,000

Public liability insurance

€13,000,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Lots (1)

Lot 1: Airfield Rehabilitation of Taxiway Alpha

Rehabilitation of Taxiway Alpha and associated works, including aeronautical ground lighting installations.

Documents (43)

PDF

Volume 2A.pdf

1.1 MB · Specification

PDF

11640 - SAG Airfield Rehab - Instructions to Tender.pdf

694.5 KB · RFT / Invitation to Tender

PDF

11640 - SAA - Airfield Rehab - BOQ Rev1.pdf

1.2 MB · Pricing / BOQ / Schedule of Rates

PDF

11640 - SAA - Airfield Rehab - BOQ.pdf

1.1 MB · Pricing / BOQ / Schedule of Rates

XLSX

11640 - SAA Rehab - Excel BOQ.xlsx

52.5 KB · Pricing / BOQ / Schedule of Rates

PDF

11640-8021.pdf

391.1 KB · Pricing / BOQ / Schedule of Rates

PDF

11640 - SAG Airfield Rehab - Contract Data.pdf

842.4 KB · Contract / Agreement / Terms

PDF

11640 - SAA Airfield Rehab - Form of Tender.pdf

254.5 KB · Form / Declaration / Certificate

PDF

11640 - SAG Airfield Rehab PQQ.pdf

528.2 KB · Form / Declaration / Certificate

PDF

11640_-_SAG_Airfield_Rehab_PQQ[1].pdf

528.2 KB · Form / Declaration / Certificate

PDF

11640-6000.pdf

437.0 KB · Drawing / Plan / Layout

PDF

11640-6001.pdf

921.2 KB · Drawing / Plan / Layout

PDF

11640-6002.pdf

700.4 KB · Drawing / Plan / Layout

PDF

11640-6101.pdf

418.2 KB · Drawing / Plan / Layout

PDF

11640-6102.pdf

303.7 KB · Drawing / Plan / Layout

PDF

11640-8020.pdf

415.3 KB · Drawing / Plan / Layout

PDF

11640-8101.pdf

295.9 KB · Drawing / Plan / Layout

PDF

11640-8102.pdf

297.6 KB · Drawing / Plan / Layout

PDF

11640-8103.pdf

296.3 KB · Drawing / Plan / Layout

PDF

11640-8104.pdf

297.2 KB · Drawing / Plan / Layout

PDF

11640-8105.pdf

295.7 KB · Drawing / Plan / Layout

PDF

11640-8106.pdf

298.2 KB · Drawing / Plan / Layout

PDF

11640-8107.pdf

296.9 KB · Drawing / Plan / Layout

PDF

11640-8200.pdf

1.4 MB · Drawing / Plan / Layout

PDF

11640-8300.pdf

810.7 KB · Drawing / Plan / Layout

PDF

11640-8301.pdf

874.8 KB · Drawing / Plan / Layout

PDF

11640-8302.pdf

789.2 KB · Drawing / Plan / Layout

PDF

11640-8303.pdf

791.5 KB · Drawing / Plan / Layout

PDF

11640-8304.pdf

686.6 KB · Drawing / Plan / Layout

PDF

11640-8400.pdf

1.4 MB · Drawing / Plan / Layout

PDF

11640-8401.pdf

1.4 MB · Drawing / Plan / Layout

PDF

11640-8402.pdf

1.5 MB · Drawing / Plan / Layout

PDF

11640-8403.pdf

1.4 MB · Drawing / Plan / Layout

PDF

11640-8404.pdf

447.7 KB · Drawing / Plan / Layout

PDF

11640-8405.pdf

596.2 KB · Drawing / Plan / Layout

PDF

DLM Issue Sheet_2023.06.14.pdf

86.3 KB · Drawing / Plan / Layout

OTHER

plot.log

266 bytes · Drawing / Plan / Layout

PDF

11640- TSGA Preliminary Health & Safety Plan T1.pdf

846.1 KB · Other

PDF

11640-8010.pdf

929.1 KB · Other

PDF

11640-8202.pdf

819.1 KB · Other

DOC

11640 - SAG Airfield Rehab PQQ.doc

452.5 KB

PDF

11640-8201.pdf

1.4 MB · Appendix / Annex

PDF

Volume 2B.pdf

3.7 MB

Original notice text

This tender involves the rehabilitation of Taxiway Alpha at Shannon Airport, ensuring compliance with specifications and quality requirements while maintaining operational delivery.

AI analysis updated 4 months ago

Bid ↗
Details

Value

€2.0m

Deadline

17 Jul

View on eTenders ↗

Location

Shannon Airport, County Clare, Ireland.

Procedure

Restricted

Clarification

22 Jun 2023

eTenders ID

1933183

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender