Employer’s Representative Services on Developer Design and Build Apartment Development - Blocks 5 and 7, Marina Quarter, Centre Park Rd, Cork City
Value
€150k
Deadline
08 May
08 May 2026
Value
€150k
Deadline
08 May
Employer’s Representative Services for apartment development in Cork City
Employer’s Representative Services for apartment development in Cork City
Bidder profile
Ideal for firms experienced in public procurement and capable of demonstrating compliance with insurance and quality standards.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Tuath Housing Association Ltd |
| Title | Employer’s Representative Services on Developer Design and Build Apartment Development - Blocks 5 and 7, Marina Quarter, Centre Park Rd, Cork City |
| CPV / category | works / Professional Consultancy |
| Estimated value | €150000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | 42 Month |
| Submission deadline | 2026-05-08T09:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for Employer’s Representative Services on Developer Design and Build Apartment Development - Blocks 5 and 7, Marina Quarter, Centre Park Rd, Cork City. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Professional Consultancy under buyer workflows in Tuath Housing Association Ltd.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: ---------------------------------------------- ------------------------------------------------- ------------------------------------------------- Minimum level of Professional Indemnity Insurance complying with the conditions below: € 6,500,000 : Cover on Each And Every cla; ---------------------------------------------- ------------------------------------------------- ------------------------------------------------- Minimum level of Professional Indemnity Insurance complying with the conditions below: € 6,500,000 € CA Entry; Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 -------------------------------------
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — not specified for this tender
- Insurance
- Public Liability — €6500000
- Professional Indemnity — €6,500,000
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: ---------------------------------------------- ------------------------------------------------- ------------------------------------------------- Minimum level of Professional Indemnity Insurance complying with the conditions below: € 6,500,000 : Cover on Each And Every cla; ---------------------------------------------- ------------------------------------------------- ------------------------------------------------- Minimum level of Professional Indemnity Insurance complying with the conditions below: € 6,500,000 € CA Entry; Minimum level of Public Liability Insurance required in respect of any one accident: € 6500000 -------------------------------------
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | - The invitation letter - Suitability Assessment Questionnaire(s) - These Instructions - Any information submitted with tenders and not called for in these Instructions or in post-tender clarifications. |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2026-05-08T09:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): 3. Instructions to Tenderers_Marina Quarter.docx, 1.Information Memorandum for ER Consultancy Services_Marina Quarter.docx
- eTenders CFT ID: not stated
- Clarification contact / portal: eTenders clarification portal
- Priority attachments: 3. Instructions to Tenderers_Marina Quarter.docx, 1.Information Memorandum for ER Consultancy Services_Marina Quarter.docx, 5. Standard Conditions of Engagement_Marina Quarter.docx
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Lots (1)
Construction of 168 residential units at Marina Quarter, Cork City.
Documents (41)
8. Scope of Services_Marina Quarter.docx
34.7 KB · Specification
1.Information Memorandum for ER Consultancy Services_Marina Quarter.docx
43.6 KB · RFT / Invitation to Tender
3. Instructions to Tenderers_Marina Quarter.docx
118.6 KB · RFT / Invitation to Tender
12. Development Agreement Extract_Marina Quarter.DOCX
27.7 KB · Contract / Agreement / Terms
5. Standard Conditions of Engagement_Marina Quarter.docx
82.3 KB · Contract / Agreement / Terms
6. Collateral Warranty for Consultants (HFA Precedent)_Marina Quarter.DOCX
43.7 KB · Contract / Agreement / Terms
7851827_Contract notice - general directive, standard regime_0.pdf
1.9 MB · Contract / Agreement / Terms
10. PI Certificate_Marina Quarter.docx
40.3 KB · Form / Declaration / Certificate
2. Form of Tender and Schedule_Marina Quarter.docx
195.2 KB · Form / Declaration / Certificate
7. Confirmation Criminal Offence_Marina Quarter.docx
15.1 KB · Form / Declaration / Certificate
SAQ (Part 1)_Marina Quarter.docx
134.7 KB · Form / Declaration / Certificate
SAQ (Part 2)_Marina Quarter.docx
63.7 KB · Form / Declaration / Certificate
06. Planned Site Layout.pdf
3.2 MB · Drawing / Plan / Layout
Level 0 - Floor Plan.pdf
611.5 KB · Drawing / Plan / Layout
Podium 2 - SE Elevation.pdf
1.3 MB · Drawing / Plan / Layout
Podium 2 Elevations.pdf
2.6 MB · Drawing / Plan / Layout
Podium 2 Level 01 Floor Plan.pdf
1.7 MB · Drawing / Plan / Layout
Podium 2 Level 02 Floor Plan.pdf
2.3 MB · Drawing / Plan / Layout
Podium 2 Level 03 Floor Plan.pdf
2.4 MB · Drawing / Plan / Layout
Podium 2 Level 04 Floor Plan.pdf
2.4 MB · Drawing / Plan / Layout
Podium 2 Level 05 Floor Plan.pdf
2.4 MB · Drawing / Plan / Layout
Podium 2 Level 06 Floor Plan.pdf
2.3 MB · Drawing / Plan / Layout
Podium 2 Level 07 Floor Plan.pdf
2.1 MB · Drawing / Plan / Layout
Podium 2 Level 08 Floor Plan.pdf
1.4 MB · Drawing / Plan / Layout
Podium 2 Level 09 Floor Plan.pdf
1.2 MB · Drawing / Plan / Layout
Podium 2 Level 10 Floor Plan.pdf
1.2 MB · Drawing / Plan / Layout
Podium 2 Level RL Floor Plan.pdf
797.6 KB · Drawing / Plan / Layout
Podium 2 NE Elevation and SW Sectional Elevation.pdf
2.2 MB · Drawing / Plan / Layout
Podium 2 NE Sectional Elevation.pdf
1.5 MB · Drawing / Plan / Layout
Podium 2 NW and SE Sectional Elevations.pdf
2.0 MB · Drawing / Plan / Layout
Podium 2 SW Sectional Elevations.pdf
2.5 MB · Drawing / Plan / Layout
Revised Floor Areas Feb 2026.pdf
171.8 KB · Drawing / Plan / Layout
11. ESPD_Marina Quarter.docx
57.6 KB · ESPD (European Single Procurement Document)
36107_7851827.pdf
10.5 KB · Appendix / Annex
Amendments To Phase 2 Permitted Development.pdf
27.5 MB · Clarification / Addendum
SAQ Appendix-A-QC1-and-QC2.docx
37.1 KB · Appendix / Annex
SAQ Appendix-B1-QC1-and-QC2.docx
19.5 KB · Appendix / Annex
SAQ Appendix-B3-QC1-and-QC2.docx
18.4 KB · Appendix / Annex
SAQ Appendix-C-QC1-and-QC2.docx
27.3 KB · Appendix / Annex
SAQ Appendix-D-QC1-and-QC2.docx
26.1 KB · Appendix / Annex
Schedule of Accommodation.pdf
171.8 KB · Appendix / Annex
Original notice text
Tuath Housing Association invites tenders from suitably qualified and experienced Employer Representatives (ER) to manage a design and build construction project of 168 apartment units in 3 blocks at Blocks 5 and 7, Marina Quarter, Centre Park Rd, Cork City. Please refer to the procurement documentation published with this contract notice for further details.
AI analysis updated 3 months, 1 week ago
Value
€150k
Deadline
08 May
Location
Marina Quarter, Centre Park Rd, Cork City
Procedure
Open
Clarification
30 Apr 2026
eTenders ID
7851827
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender