Ballycoolin Bus Depot Design and Build
Value
€80.0m
Deadline
11 Sep
11 Sep 2026
Value
€80.0m
Deadline
11 Sep
Design and build of a bus depot at Ballycoolin, including detailed design, construction, M&E, and commissioning.
Design and build of a bus depot at Ballycoolin for National Transport Authority
Bidder profile
Large, established construction firms or consortia with significant financial capacity, extensive experience in design and build projects, and robust health and safety and environmental management systems.
Risks & flags
- High turnover requirement (€60M) for €8M project
- Extensive pass/fail health and safety criteria
- BIM Level 2 Maturity requirement
- Uncertain contract length and go-live date
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | National Transport Authority |
|---|---|
| Title | Ballycoolin Bus Depot Design and Build |
| CPV / category | Not specified |
| Estimated value | €8,000,000 |
| Per-year | Not stated |
| Procedure type | Restricted |
| Lots | Not specified |
| Location | Ballycoolin |
| Contract length | Not stated |
| Submission deadline | 2026-08-28T11:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
This tender seeks a Principal Service Provider to undertake the design and build of a bus depot at Ballycoolin. The contract encompasses the full lifecycle from detailed design through to construction and commissioning. The estimated value of the contract is €8,000,000.
The scope of work includes, but is not limited to:
- Design: Development of detailed architectural, structural, mechanical, and electrical designs for the bus depot. This includes ensuring designs comply with all relevant building regulations, safety standards, and operational requirements for a modern bus depot. BIM Level 2 Maturity (PAS 1192-2 / BS EN ISO 19650) compatibility is a requirement for design services.
- Construction: Execution of all civil engineering and building works necessary for the construction of the bus depot. This will involve site preparation, foundation works, structural erection, building envelope construction, and internal fit-out.
- Mechanical and Electrical (M&E) Services: Installation and commissioning of all M&E systems, including but not limited to, power distribution, lighting, HVAC, water supply, drainage, and communication systems.
- Ancillary Works: This may include external works such as hardstanding, drainage, landscaping, and utility connections.
- Health and Safety Management: Implementation and adherence to all safety regulations, including the Safety, Health and Welfare at Work (Construction) Regulations 2013. This involves developing and maintaining Safety and Health Plans for specific projects.
- Quality Assurance: Implementation of measures for ensuring quality throughout the design and construction phases, including adherence to ISO 45001:2018 or equivalent for safety management systems.
- Commissioning and Handover: Testing, commissioning, and handover of the completed facility to the National Transport Authority.
The project requires the contractor to demonstrate competence in managing health and safety, with specific requirements for educational and professional qualifications for management and personnel, a proven track record in previous works, and robust quality assurance measures.
3. Background & buyer context
This procurement is for the Ballycoolin Bus Depot Project, managed by the National Transport Authority (NTA). The NTA is the statutory body responsible for implementing and regulating public transport in Ireland. The development of new or upgraded infrastructure, such as this bus depot, aligns with the NTA's strategic objectives to enhance public transport capacity, efficiency, and service delivery across the country. The project is part of the NTA's ongoing investment in public transport infrastructure to support national policy goals related to sustainable mobility, reduced carbon emissions, and improved urban and regional connectivity. No incumbent contractor is mentioned in the provided documentation.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement:
- Minimum average annual turnover of €60,000,000 in General Construction for the three most recently completed financial years.
- Insurance:
- Professional Indemnity Insurance: €6.5 million on an Each and Every claim basis and €6 million on an Annual Aggregate basis. Maximum permissible excess is the greater of 2% of annual turnover or €5,000.
- Public Liability Insurance: €13,000,000 in respect of any one accident.
- Employer's Liability Insurance: €13,000,000 in respect of any one accident.
- Certifications:
- Safety management system in accordance with ISO 45001:2018 or equivalent.
- Certified membership of Safe-T-Cert may be deemed equivalent for the safety management system criterion.
- ISO 14001 certification or an in-house EMS focusing on environmental commitments is required for Mechanical and Electrical Engineers and Architects.
- Past experience:
- Proven track record in the role of Managing Director on a minimum of two building projects, each with a capital value in excess of €50 million.
- A minimum of ten (10) years’ experience operating at Managing Director level within the construction industry.
- Evidence of completed works over the past seven (7) years that are similar in nature and complexity to the Works. Applicants must provide Safety and Health Plans for two (2) of these projects.
- Personnel:
- Health and Safety Manager must have a minimum of 10 years’ experience acting in this capacity on building construction projects.
- Management staff and personnel must possess appropriate educational/professional qualifications and experience relevant to the Works, including Health and Safety qualifications and training.
- Geographic / facility constraints:
- Not specified for this tender.
5. Award criteria & scoring
The award criteria are not explicitly detailed in the provided extract. However, the process is described as a Restricted Procedure, indicating that a suitability assessment will be conducted based on the Qualification Criteria outlined in Section 3 of the Suitability Assessment Questionnaire (SAQ). All health and safety selection criteria are pass/fail. Bidders must meet the relevant minimum standards for each qualification criterion. The final award will likely be based on a combination of quality and price, following standard public procurement practices for design and build contracts, typically evaluated under a Most Economically Advantageous Tender (MEAT) framework.
6. Submission requirements
Bidders are required to submit a Suitability Assessment Questionnaire (SAQ) response. The specific components of the submission include:
- Suitability Assessment Questionnaire (SAQ): Completed in accordance with the instructions and requirements outlined in the document.
- Health and Safety Supplements: Applicants must complete Health and Safety Supplement 3.4.1 (Contractor/Reserved Specialist).
- Curricula Vitae (CVs): For management staff and personnel, detailing relevant qualifications, training, experience on similar projects, and roles held. CVs should indicate educational and professional qualifications, Health and Safety training, and CPD.
- List of Previous Projects: Completed via Appendix B1 (List of Previous Projects) with corresponding Certificates of Satisfactory Execution (Appendix B2).
- Safety and Health Plans: For two (2) of the projects included in Appendix B1.
- Safety Management System Evidence: Details of the safety management system, or third-party certification (e.g., ISO 45001:2018 or equivalent, Safe-T-Cert).
- Organisational Structure: A document setting out the Applicant’s organisational structure.
- Declarations: Including declarations related to health and safety competence, quality assurance, and any conflicts of interest.
- Tax Clearance: Tax Clearance Access Number and Tax Reference Number will be required for online verification by the Contracting Authority prior to award.
- BIM Capabilities: Evidence of BIM Level 2 Maturity (PAS 1192-2 / BS EN ISO 19650) compatibility.
The submission must be made via the eTenders portal. Specific format rules for attachments or document limits are not detailed in the provided extract.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | Not specified |
| Clarification deadline | 2 weeks before tender deadline |
| Mandatory site visit | Not specified |
| Tender deadline | 2026-08-28T11:00:00+00:00 |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
The contract will be based on the Public Works Contracts framework, likely PW-CF2 (Building Works designed by the Contractor) given the design and build nature. Key terms to note include:
- Contract Length: Not specified in the provided documents.
- Payment Terms: Standard public sector payment terms apply, likely adhering to prompt payment legislation.
- SLAs/KPIs: Specific Service Level Agreements or Key Performance Indicators are not detailed in the extract but will be defined in the full contract documents.
- Liquidated Damages: Not specified in the extract.
- Termination Clauses: Standard termination clauses for breach of contract or convenience are expected.
- IP Ownership: Not specified in the extract.
- Sub-contracting: Rules regarding sub-contracting will be detailed in the full contract.
- Guarantees/Bonds: Not specified in the extract, but may be required for performance or advance payment.
9. Risks, red flags & unusuals
The primary risk for bidders lies in the significant turnover requirement (€60 million average annual turnover) for a project with an estimated value of €8 million. This suggests a potential mismatch in scale, possibly indicating a preference for larger, established firms or a need for consortia. The requirement for BIM Level 2 Maturity is a standard but critical technical prerequisite. The health and safety requirements are extensive and presented as pass/fail, demanding meticulous attention to detail in submissions. The absence of a specified contract length and go-live date introduces uncertainty for planning.
10. SME fit assessment
This tender is likely geared towards larger construction firms or consortia due to the high average annual turnover requirement of €60 million. Small and Medium Enterprises (SMEs) may find it challenging to meet this threshold individually.
- Credible Bidders: Established main contractors with a strong track record in general construction, significant financial capacity, and experience in delivering projects of similar scale and complexity. Firms with existing ISO 45001 and ISO 14001 certifications and proven BIM Level 2 capabilities are well-positioned.
- Consortium/Sub-contracting: The structure of the tender does not explicitly prohibit consortia or sub-contracting. SMEs could potentially participate by forming consortia with other firms to meet the turnover and experience requirements, or by acting as specialist sub-contractors to a lead contractor.
- Bid-Prep Effort: Given the detailed SAQ, health and safety documentation, and experience evidence required, bid preparation effort is estimated to be substantial, likely requiring several weeks of dedicated work by a team.
- Pwin Signal: The high turnover requirement and the nature of a design and build project for a public transport authority suggest a competitive but potentially incumbent-friendly environment if a specific firm has prior experience with the NTA or similar large-scale infrastructure projects. The pass/fail health and safety criteria also represent a significant hurdle.
11. Where to dig deeper
- Source RFT Filename(s): BCD_QW1_SAQ_for_Contractors (Issued R1).docx, BCD 3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
- eTenders CFT ID: Not specified
- Contact / Clarification Portal: Via the eTenders portal.
- Most Important Attachments:
- Suitability Assessment Questionnaire (SAQ)
- Health and Safety Supplement 3.4.1 (Contractor/Reserved Specialist)
- Appendix B1 – List of Previous Projects
- Appendix B2 – Certificate of Satisfactory Execution
Can you bid?
Required certifications
- ISO 45001:2018
- Safe-T-Cert
- ISO 14001
Minimum turnover
€60,000,000
Public liability insurance
€13,000,000
Professional indemnity insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (31)
BCD 3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
62.8 KB · Contract / Agreement / Terms
BCD_QW1_SAQ_for_Contractors (Issued R1).docx
264.4 KB · Contract / Agreement / Terms
QW1 App C - Bankers Letter.docx
34.7 KB · Form / Declaration / Certificate
3.4.3-HS-Works-Specialist-with-Design_v3.1-25-11-2025 (1).docx
59.7 KB
6. QW1 IPI Annex.docx
41.7 KB
Ballycoolin SAQ Document Pack v2.zip
3.5 MB
Ballycoolin SAQ Document Pack.zip
2.4 MB
Ballycoolin- ESPD - Architect.docx
70.1 KB · ESPD (European Single Procurement Document)
Ballycoolin- ESPD - C&S.docx
70.1 KB · ESPD (European Single Procurement Document)
Ballycoolin- ESPD - Contractors.docx
70.1 KB · ESPD (European Single Procurement Document)
Ballycoolin- ESPD - FC.docx
70.1 KB · ESPD (European Single Procurement Document)
Ballycoolin- ESPD - M&E.docx
70.1 KB · ESPD (European Single Procurement Document)
BCD 3.4.2-HS-PSCS_v3.1-25-11-2025.docx
56.2 KB
BCD PIM (Issued R1).docx
1.1 MB
BCD PIM (Issued R1).pdf
498.7 KB
BCD QC_Part_2_v1.1_04-11-2024.docx
66.1 KB
BCD QW_Part_2_v1.1_18-11-2024.docx
65.3 KB
BCD_QC1(SAQ_Architect) (Issued).docx
221.7 KB
BCD_QC1(SAQ_C&S) (Issued).docx
247.0 KB
BCD_QC1(SAQ_FC) (Issued).docx
218.1 KB
BCD_QC1(SAQ_M&E) (Issued).docx
220.2 KB
MF_2.1_Professional_Indemnity_09-02-2022.docx
49.8 KB · Insurance / Indemnity
QC1 App B1 - List of Previous Projects.docx
25.8 KB
QC1 App B3 - Satisfactory Del. of Services.docx
25.6 KB
QC1 App D - CV - Prof. Quals. and Exp..docx
24.6 KB
QW1 App B1 - List of Previous Works Projects with CSE.docx
36.0 KB
QW1 App B2 - Satisfactory Project Execution - Works.docx
31.0 KB
QW1 App D1 - Letter of Undertaking re. Bond.docx
38.3 KB
QW1 App L - CV - Prof. Quals. and Exp..docx
24.5 KB
Tender Circular No 1- Ballycoolin Bus Depot - 110826.pdf
303.6 KB
Tender Circular No 2 - Ballycoolin Bus Depot - 140826.pdf
331.5 KB
Original notice text
To assist the NTA in the delivery of its Bus depot programme, it has been agreed that the Ballycoolin Bus Depot Project Design and Build Contract (the Project) will be procured by the National Transport Authority with AECOM acting as Employer's Representative and technical advisor to the NTA. BusConnects Dublin is a central component of the NTA Transport Strategy for the Greater Dublin Area which will reshape the city's public transportation landscape. Aligned with the Government's agenda to decarbonise the economy, the focus on electrifying the transport network is central to this strategy. This vision includes a substantial increase in the number of electrified buses within the fleet to facilitate expanded routes and heightened service frequencies. However, the current depot network in Dublin West is constrained and unable to accommodate these additional buses. As demand increases, expectations for continued growth and service reconfigurations place further pressure on the existing bus depot network, particularly as suburban population growth accelerates. The Ballycoolin depot will support this expansion by providing dedicated facilities for EV maintenance and charging while also providing onsite accommodation for operational and administrative staff. This integrated approach not only strengthens Dublin's public transport infrastructure but also supports sustainability objectives and the electrification of the transport system. Project Summary The Ballycoolin Bus Depot is a facility for electric buses and includes a comprehensive range of features designed to optimise public transport service delivery. The depot will accommodate: -Capacity for approximately 180 buses, with the current design accommodating 176 buses. -Administrative offices including an atrium entrance with a total floor area of approximately 2,520 square metres. -vehicle washing and cleaning building of approximately 1,120 square metres. -Major and minor repairs and maintenance bays, workshops and stores with a combined floor area of approximately 2,680 square metres. -Gate, entrance and security facilities.20 21Vehicle inspection bays and associated facilities with a floor area of approximately 510 square metres. -An electrical substation compound of approximately 2,700 square metres. -Seven transformer buildings of approximately 60 square metres each. -Car parking facilities including approximately 57 standard parking spaces, three accessible spaces, six motorcycle spaces and six electric vehicle spaces, with a total area of approximately 1,700 square metres. -Cycle parking facilities of approximately 24 square metres. -All associated ancillary works required for the delivery and operation of the facility.
AI analysis updated 1 week ago
Value
€80.0m
Deadline
11 Sep
Location
Ballycoolin
Procedure
Negotiated
Clarification
14 Aug 2026
eTenders ID
8720883
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender