Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Supply, Delivery and Commissioning of Fuel Storage Tanks for Hydrotreated Vegetable Oil (HVO)
Closed Construction & Civil Engineering Works SME Suitable Open

Supply, Delivery and Commissioning of Fuel Storage Tanks for Hydrotreated Vegetable Oil (HVO)

Deadline

26 Jun

Tender for supply and commissioning of fuel storage tanks for HVO.

SME fit: Medium Bid effort: Medium

Tender for supply and commissioning of fuel storage tanks for HVO.

Bidder profile

Firms with experience in fuel storage solutions and environmental compliance are encouraged to bid.

Risks & flags

  • Turnover threshold
  • Funding uncertainties
  • Tight delivery timelines

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Waterways Ireland
Title Supply, Delivery and Commissioning of Fuel Storage Tanks for Hydrotreated Vegetable Oil (HVO)
CPV / category not stated
Estimated value not disclosed
Per-year not stated
Procedure type Open Procedure
Lots not stated
Location Rooskey Depot, Thomastown Depot, Killaloe Depot
Contract length not stated
Submission deadline 2026-06-26 11:00 GMT
Go-live / start July 2026

2. Scope of Work

Waterways Ireland seeks tenders for the supply, delivery, and commissioning of fuel storage tanks for Hydrotreated Vegetable Oil (HVO). The initial requirement includes two 5,000L tanks for the Rooskey Depot, with potential future requirements for additional tanks at other depots.

The contractor's day-to-day activities will encompass:

  • Supply and Delivery:

  • Two (2) 5,000L tanks to Rooskey Depot.

  • One (1) 10,000L tank for Thomastown Depot (optional).

  • One (1) 5,000L tank for Killaloe Depot (optional).

  • Commissioning:

  • Installation and commissioning of the tanks, ensuring compliance with all relevant standards and legislation for fuel storage in Ireland.

  • Tank Specifications:

  • Tanks must be designed to be fully compliant with PPG26 & PPG 2 regulations and the Dangerous Substances (Flammable Liquids & Fuels Distribution and Commercial Supply Stores) Regulations 2019.

  • Tanks must be integrally bunded with a primary container capable of holding a minimum of 110% of the design volume of fuel.

  • Pumphouse Installation:

  • Integrated secure pumphouses with fuel dispensing units must be supplied and installed with each tank.

  • Dispensing units must include features such as overfill prevention systems, leak detection systems, and provisions for future fuel management systems.

  • Delivery Locations:

  • Rooskey Depot (initial requirement).

  • Thomastown Depot and Killaloe Depot (optional future requirements).

  • Environmental Considerations:

  • Proposals must address environmental and sustainability considerations, aligning with Waterways Ireland's Climate Action Plan.

The anticipated timeline for delivery and commissioning is by December 2026, with tenderers required to indicate their proposed timelines for ordering and lead times.

3. Background & buyer context

This procurement aligns with Waterways Ireland's Climate Action Plan initiated in June 2022, which aims to reduce greenhouse gas emissions from its fleet, representing 70% of total emissions. The transition to Hydrotreated Vegetable Oil (HVO) is a strategic move to enhance sustainability and comply with national climate targets. Waterways Ireland, established under the British-Irish Agreement Act of 1999, manages 1,200 km of navigable waterways and is committed to preserving environmental heritage while promoting recreational activities.

4. Eligibility & selection criteria

Bidders must meet the following eligibility and selection criteria:

  • Turnover requirement: Minimum average annual turnover of €150,000 during one of the last three years.
  • Insurance:
  • Employers Liability: €13 million
  • Public Liability: €6.5 million
  • Product Liability: €6.5 million
  • Professional Indemnity: €2.6 million
  • Certifications: Compliance with relevant safety and environmental standards, including ISO 14001.
  • Past experience: Evidence of at least three comparable projects involving the supply and commissioning of fuel storage tanks within the last 36 months.
  • Personnel: Relevant qualifications and experience of key personnel involved in the project.
  • Geographic constraints: Not specified for this tender.

5. Award criteria & scoring

Bids will be evaluated based on the following criteria:

Criterion Weight (%) Sub-criteria Pass/Fail Threshold
Cost 60% Fixed price for initial requirement and schedule of rates for options n/a
Suitability of Proposed Products 30% Compliance with specifications, lead times, warranty details Minimum 50%
Environmental Characteristics 10% Commitment to sustainability and environmental management Minimum 50%

The price/quality split follows the Most Economically Advantageous Tender (MEAT) principle.

6. Submission requirements

Bidders must submit the following documents:

  • Method statement: Completed Tender Response Document (TRD) with specified page limits.
  • CVs: For key personnel, adhering to page count limits.
  • Pricing schedule: Using the provided template.
  • Case studies: Three relevant projects, detailing value and compliance.
  • Declarations: Including ESPD, Bona Fides, Tax clearance, and Conflict of Interest.
  • Site visit: Not applicable.
  • Submission portal: All submissions must be made via eTenders.

7. Key dates & process

Event Date & Time
RFT issued 2026-05-26
Clarification deadline 2026-06-16 12:00 GMT
Tender submission deadline 2026-06-26 12:00 GMT
Expected award decision July 2026
Contract commencement July 2026

8. Contract terms that matter

Key contract terms include:

  • Term and extensions: Initial contract duration not specified; potential for extensions based on performance.
  • Payment terms: Not specified.
  • SLAs/KPIs: Compliance with delivery timelines and quality standards.
  • Liquidated damages: Not specified.
  • Termination clauses: The authority reserves the right to terminate the contract for reasons outside its control.
  • IP ownership: Not specified.
  • Sub-contracting rules: Allowed, with requirements for transparency and accountability.

9. Risks, red flags & unusuals

Potential risks include:

  • Turnover threshold: The minimum turnover requirement may limit participation to established firms.
  • Geographic constraints: Not specified, but the requirement for local compliance may restrict bidders.
  • Funding uncertainties: Future requirements for additional tanks depend on budget availability.
  • Tight delivery timelines: Delivery and commissioning must occur by December 2026, which may pose logistical challenges.

10. SME fit assessment

Small and medium enterprises (SMEs) with relevant experience in fuel storage solutions can credibly bid. The tender is open to:

  • Firms with experience in supplying and commissioning fuel tanks.
  • Consortiums or joint ventures are permitted, allowing SMEs to collaborate.
  • Bid preparation may require several days, depending on the complexity of the proposal.
  • The presence of established firms may indicate a competitive landscape, but the tender is structured to allow for diverse participation.

11. Where to dig deeper

  • Source RFT filename: WI - Supply of HVO Fuel Tanks 2026 - RFT FINAL.pdf
  • eTenders CFT ID: 8245920
  • Contact email: Queries should be submitted via the messaging facility on eTenders.
  • Important attachments: Tender Response Document (TRD), Appendix A (Contract Terms and Conditions).

Can you bid?

Required certifications

  • ISO 14001

Minimum turnover

€150,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€2,600,000

Named standards / methodologies

PPG26PPG 2

Scoring

Most Economically Advantageous Tender

Documents (4)

PDF

WI - Supply of HVO Fuel Tanks 2026 - RFT FINAL.pdf

647.4 KB · RFT / Invitation to Tender

PDF

2026 Appendix H GDPR.pdf

226.2 KB · Form / Declaration / Certificate

DOCX

WI - Supply of HVO Fuel Tanks 2026 TRD FINAL.docx

125.3 KB

PDF

WWI Standard TCs - (Ireland) 01042024.pdf

638.6 KB

Original notice text

Waterways Ireland is inviting tenders for the supply, delivery, and commissioning of two (2) 5,000L Fuel Tanks for North Shannon to enable the transition of its fleet to Hydrotreated Vegetable Oil (HVO). The tanks must comply with all relevant standards and legislation applicable for storage of fuels oils in Ireland. There may be a future requirement for 2 further tanks within the tender validity period. Any future requirement will be subject to budget becoming available and is not guaranteed. One (1) 10,000L tank for Thomastown Depot One (1) 5,000L tank for Killaloe Depot

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Deadline

26 Jun

View on eTenders ↗

Location

Rooskey Depot, Thomastown Depot, Killaloe Depot

Procedure

Open

Clarification

16 Jun 2026

eTenders ID

8245920

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender