Skip to content
TenderMatch
← Tenders / Construction of the Dromore River Blueway (Lisnalong to Ballybay), Co Monaghan
Open Construction & Civil Engineering Works Open

Construction of the Dromore River Blueway (Lisnalong to Ballybay), Co Monaghan

Deadline

25 Sep

Construction of a blueway pathway along the Dromore River from Lisnalong to Ballybay, including information boards and associated civil engineering works.

SME fit: Medium Bid effort: Medium 📍 Monaghan

Construction of Dromore River Blueway in County Monaghan

Bidder profile

Construction firms with experience in civil engineering, pathway development, and a strong emphasis on health and safety compliance, capable of meeting €1M turnover and significant insurance requirements.

Risks & flags

  • Strong emphasis on Health and Safety
  • Detailed engineering specifications
  • Lack of value disclosure
  • Specific European/British Standards

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Monaghan County Council
Title Construction of the Dromore River Blueway (Lisnalong to Ballybay), Co Monaghan
CPV / category Not specified
Estimated value Not disclosed
Per-year Not specified
Procedure type Not specified
Lots Not specified
Location County Monaghan
Contract length Not specified
Submission deadline 2026-09-25T15:00:00+00:00
Go-live / start Not specified

2. Scope of Work

This tender seeks a contractor for the construction of the Dromore River Blueway, a project spanning from Lisnalong to Ballybay in County Monaghan. The scope encompasses the development of infrastructure to facilitate recreational activities along the river.

The constituent activities and deliverables include:

  • Blueway Construction: This involves the physical creation of the blueway pathway. Specifics regarding the length, width, and materials for the pathway are not detailed in the provided metadata.
  • Information Boards: The project includes the design and installation of information boards. Engineering calculations for foundation design for these boards have been prepared, specifying dimensions for sign faces, total height, foundation depth and width, and area of sign. These calculations reference standards such as BS EN 1991-1-4 for wind action.
  • Structural and Civil Engineering: The scope requires adherence to various engineering standards and regulations, including BS EN 1991 for wind action, EN 1992-4 for anchor design, and BS EN 1340 for concrete road kerbs. Calculations for post section properties, wind action, loading, baseplate and anchor design, and foundation design are referenced.
  • Health and Safety Management: A significant component of the work involves compliance with the Safety, Health and Welfare at Work Act 2005 and associated regulations. This includes the development and implementation of Safety and Health Plans, risk assessments, and a comprehensive Safety Statement.

The project's scale and specific technical requirements, such as detailed material specifications, construction methodologies, and precise site preparation details, are not fully elaborated in the provided tender metadata.

3. Background & buyer context

Monaghan County Council is procuring the construction of the Dromore River Blueway. This initiative aligns with broader regional development strategies aimed at enhancing recreational infrastructure and promoting tourism within County Monaghan. Blueway projects typically aim to provide access to waterways for activities such as kayaking, canoeing, and walking, thereby increasing local amenity value and economic opportunities. The specific drivers for this procurement are not explicitly stated beyond the general objective of developing recreational facilities. No information regarding an incumbent contractor or specific policy frameworks like "Higher Education 4.0" or "DSP scheme" is present in the provided tender information.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement:
  • Yearly Turnover arising from the area of work specified: €1M.
  • Insurance:
  • Public Liability Insurance: Minimum indemnity limit of €6,500,000 for any one event. Maximum excess for property damage only is €10,000.
  • Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event.
  • Professional Indemnity Insurance: Minimum indemnity limit of €2,000,000 annual aggregate limit. Maximum permissible excess is the greater of 2% of the Tenderer’s annual turnover or €5,000.
  • Certifications:
  • Not specified for this tender.
  • Past experience:
  • Bidders must provide a list of completed projects similar in nature and complexity to the Works. The period for submitting evidence of works contracts is the past 5 years, with a potential to consider the previous 7-year period. Certificates of Satisfactory Execution are required for these projects.
  • Evidence of Health and Safety aspects of works previously undertaken is required.
  • Personnel:
  • Evidence of management staff with appropriate educational/professional qualifications and experience, including Health and Safety qualifications, training, and experience relevant to the Works.
  • Evidence of personnel with appropriate educational and professional qualifications and experience, including Health and Safety qualifications, training, and experience relevant to the Works.
  • Submission of average annual numbers of persons employed and those in managerial positions over the last 3 years, specifically related to Health and Safety in relation to Works.
  • Geographic / facility constraints:
  • Not specified for this tender.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided tender metadata. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which balances price and quality. The specific weighting between price and quality, and the sub-criteria for evaluating quality (e.g., technical merit, experience, methodology, health and safety approach), would be detailed in the full tender documents. Any minimum scoring thresholds per criterion or overall would also be specified there.

6. Submission requirements

The specific submission requirements are not fully detailed in the provided metadata. However, based on the referenced appendices and sections, bidders will likely need to provide:

  • Method statement / response document: This will include responses to technical and qualification criteria, particularly concerning Health and Safety competence. Specific documents mentioned include:
  • Appendix B1: List of Previous Works Projects.
  • Appendix B2: Certificate of Satisfactory Execution.
  • Health and Safety Supplement 3.4.1, including sections on Educational and Professional Qualifications (Management and Personnel), List of Works Carried Out, Measures for Ensuring Quality, and Statement of Average Annual Numbers of Persons Employed.
  • A Safety Statement in the format outlined by the Health and Safety Authority.
  • CVs: Curricula vitae of management staff and other relevant personnel, detailing qualifications, training, experience, and roles on past projects.
  • Pricing schedule: Format and template to be specified in the full tender documents.
  • Declarations:
  • European Single Procurement Document (ESPD) or equivalent.
  • Bona Fides declarations.
  • Tax clearance certificates.
  • Conflict of Interest declarations.
  • Mandatory site visit: Not specified in the provided metadata.
  • Submission portal: Submissions will be made via the eTenders platform. Specific formatting rules for uploaded documents may apply.

7. Key dates & process

Event Date/Time
RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-09-25T15:00:00+00:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

The provided metadata does not detail specific contract terms. Standard public sector contract terms would apply, including provisions for:

  • Contract length and extensions: Details on the initial term and any options for extension are not specified.
  • Payment terms: Minimum amount for interim payments is €0, except for the release of retention.
  • SLAs/KPIs: Specific Service Level Agreements or Key Performance Indicators are not detailed.
  • Liquidated damages: Not specified.
  • Termination clauses: Not specified.
  • IP ownership: Not specified.
  • Sub-contracting: Rules regarding sub-contracting are not detailed.
  • Guarantees/Bonds: Requirements for parent-company guarantees or performance bonds are not specified.

9. Risks, red flags & unusuals

  • Health and Safety Focus: The tender places a very strong emphasis on Health and Safety competence, with multiple detailed criteria (3.4.1a-e) dedicated to this aspect. This suggests a high-risk profile for the project or a particular focus by the contracting authority on safety compliance.
  • Detailed Engineering Documentation: The inclusion of detailed engineering calculation documents for information board foundations indicates a level of technical specification that may require specialist input from bidders, even if the primary scope is construction.
  • Turnover Requirement: The €1M turnover requirement, while not exceptionally high, combined with the specific insurance levels, sets a clear threshold for bidder size and financial stability.
  • Lack of Value Disclosure: The absence of an estimated contract value is common but means bidders must assess the project's scale and potential profitability based on the scope and requirements alone.
  • Specific Standards: The explicit referencing of numerous European (EN) and British Standards (BS EN) for structural and civil engineering implies a need for bidders to demonstrate familiarity and compliance with these detailed technical specifications.

10. SME fit assessment

This tender is structured to attract established construction firms with a proven track record in civil engineering and a strong commitment to health and safety.

  • Who can credibly bid: A viable bidder would likely be a small to medium-sized enterprise (SME) or larger construction company with demonstrated experience in civil works, infrastructure development, and a robust health and safety management system. The €1M turnover requirement and significant insurance cover suggest that very small, newly established businesses may find it challenging to meet these financial and risk-management prerequisites. Firms with prior experience in developing recreational pathways or similar public realm projects would have an advantage.
  • Consortium/Sub-contracting: The tender documents do not explicitly state whether consortia or sub-contracting are permitted. However, the emphasis on the Applicant's (or Lead Member's) qualifications suggests that the primary entity bidding must meet the core criteria. Sub-contracting may be permissible for specific elements, but this would need to be confirmed in the full tender documents.
  • Indicative bid-prep effort: Given the detailed health and safety requirements, past project evidence, and potential need for technical input on engineering aspects, bid preparation could require 10-20 working days for a competent firm. This includes gathering documentation, preparing responses to the detailed H&S criteria, and compiling project references.
  • Pwin signal: The tender does not explicitly indicate an incumbent or a framework. However, the detailed technical specifications and the emphasis on health and safety suggest that Monaghan County Council is seeking a contractor with a high degree of technical competence and a well-established safety culture. The absence of a stated value means it's difficult to gauge the scale relative to typical market offerings.

11. Where to dig deeper

  • Source RFT filename(s): Not specified in metadata.
  • eTenders CFT ID: Not specified in metadata.
  • Contact email or clarification portal: Not specified in metadata.
  • Most important attachments:
  • Appendix B1: List of Previous Works Projects.
  • Appendix B2: Certificate of Satisfactory Execution.
  • 3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx (Health and Safety Supplement).
  • 26010-DID-ZZ-ZZ-CA-C-5002.pdf (Information Board Foundation Design calculations).
until submission deadline — 25 Sep 2026 at 16:00 Deadline passed

Can you bid?

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€2,000,000

Named standards / methodologies

BS EN 1991-1-4EN 1992-4BS EN 1340

Scoring

Most Economically Advantageous Tender

Documents (58)

PDF

Volume A Works Requirements-SP-C-0001.pdf

1.8 MB · Specification

DOCX

Dromore Blueway ITTW2-v3.1-25-11-2025 (3).docx

76.6 KB · RFT / Invitation to Tender

PDF

Volume C Pricing Document-BQ-C-2001.pdf

881.4 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.6 KB · Contract / Agreement / Terms

PDF

PW-CF5_v2.10_16-06-2026.pdf

887.3 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.3 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57 (3).docx

41.1 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

27.6 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services (3).docx

25.6 KB · Form / Declaration / Certificate

DOCX

Dromore Blueway FTS5_v2.10-16-06-2026.docx

93.8 KB · Form / Declaration / Certificate

DOCX

Forms_of_undertaking (2).docx

91.4 KB · Form / Declaration / Certificate

DOCX

QW2_Part_1_v2.2_25-11-2025 (1).docx

191.8 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.1_18-11-2024 (1).docx

58.4 KB · Form / Declaration / Certificate

PDF

26010-DID-ZZ-01-DR-C-5000.pdf

437.5 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-01-DR-C-5001.pdf

323.1 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-01-DR-C-5002.pdf

726.8 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-01-DR-C-5101.pdf

567.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-01-DR-C-5102.pdf

549.0 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-02-DR-C-5000.pdf

520.6 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-02-DR-C-5001.pdf

721.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-02-DR-C-5101.pdf

880.5 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-02-DR-C-5102.pdf

949.5 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-03-DR-C-5000.pdf

171.3 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-03-DR-C-5001.pdf

623.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-03-DR-C-5101.pdf

651.3 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-04-DR-C-5000.pdf

484.8 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-04-DR-C-5001.pdf

606.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-04-DR-C-5101.pdf

542.3 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-04-DR-C-5102.pdf

725.9 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5000.pdf

365.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5001.pdf

613.6 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5002.pdf

605.6 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5003.pdf

540.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5101.pdf

790.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-05-DR-C-5102.pdf

554.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-06-DR-C-5000.pdf

189.4 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-06-DR-C-5001.pdf

1.8 MB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-06-DR-C-5051.pdf

383.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-06-DR-C-5101.pdf

832.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5000.pdf

328.0 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5001.pdf

1.2 MB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5011.pdf

475.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5021.pdf

500.3 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5031.pdf

614.1 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-07-DR-C-5101.pdf

626.5 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-CA-C-5001.pdf

665.1 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-CA-C-5002.pdf

1.2 MB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-CA-C-5003.pdf

622.7 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-DR-C-5000.pdf

2.7 MB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-DR-C-5201.pdf

2.4 MB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-DR-C-6001.pdf

337.2 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-DR-C-6002.pdf

194.7 KB · Drawing / Plan / Layout

PDF

26010-DID-ZZ-ZZ-DR-C-6003.pdf

555.1 KB · Drawing / Plan / Layout

ZIP

Dromore River Blueway Tender Pack.zip

61.7 MB · Other

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

32.9 KB · Appendix / Annex

PDF

Designers Risk Assessment 8002.pdf

705.6 KB · Appendix / Annex

PDF

Preliminary CEMP-0001.pdf

5.3 MB · Appendix / Annex

PDF

Preliminary Health & Safety Plan 8001.pdf

23.3 MB · Appendix / Annex

Original notice text

In July 2025, An Comisiun Pleanala approved the proposed development of the first Blueway in Co Monaghan, along a stretch of the Dromore River. The appointed design team has now developed detailed designs and the project is ready to go to tender for a contractor to undertake the necessary works.

AI analysis updated 13 hours, 26 minutes ago

Bid ↗
Details

Deadline

25 Sep

View on eTenders ↗

Location

County Monaghan

Procedure

Open

eTenders ID

8965862

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender