Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Construction of Additional Accommodation Extension at Scoil Phobail Bheara, Castletownbere, Co Cork
Closed Construction & Civil Engineering Works SME Suitable Open

Construction of Additional Accommodation Extension at Scoil Phobail Bheara, Castletownbere, Co Cork

Value

€3.0m

Deadline

02 Sep

Construction of a new school extension including classrooms, special needs rooms, and associated facilities, with mechanical, electrical, and site works.

SME fit: Medium Bid effort: High 📍 Cork

Construction of new school accommodation extension at Scoil Phobail Bheara

Bidder profile

Established construction firms with proven experience in educational or public sector building projects, capable of meeting significant turnover and insurance requirements, and demonstrating strong H&S competence.

Risks & flags

  • High emphasis on Health and Safety competence
  • Detailed personnel H&S training requirements
  • Turnover requirement higher than contract value
  • Lack of specific award criteria weightings

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Scoil Phobail Bheara
Title Construction of Additional Accommodation Extension at Scoil Phobail Bheara, Castletownbere, Co Cork
CPV / category Not specified
Estimated value €3,000,000.00
Per-year Not stated
Procedure type Not stated
Lots Not stated
Location Castletownbere, Co Cork
Contract length Not stated
Submission deadline 2026-08-12T11:00:00+00:00
Go-live / start Not stated

2. Scope of Work

This tender seeks a contractor for the construction of additional accommodation at Scoil Phobail Bheara, located in Castletownbere, Co Cork. The project involves new building works to extend the existing school facilities.

The scope of work encompasses:

  • New Construction: Building an extension to the existing school premises. Specific areas detailed in drawings include:
  • Daily Living Skills Room (Area 70.8 sqm)
  • Para-Education Room (Area 12.8 sqm)
  • Practical Activity Room (Area 12.8 sqm)
  • Mainstream Classroom (Area 50 sqm)
  • Cleaner Store (Area 5.8 sqm)
  • Sluice (Area 1.6 sqm)
  • Multi-Sensory Room (Area 20 sqm)
  • Small Safe Space 1 (Area 15 sqm)
  • Safe Base 2 (Area 7.2 sqm)
  • Small Safe Space 2 (Area 18.5 sqm)
  • En-suite Lobby (Area 2.9 sqm)
  • Ambulant Disabled WC (Area 5.8 sqm)
  • Office (Area 2.4 sqm)
  • Store (Area 1 sqm)
  • Lobby (Area 1.6 sqm)
  • Safe Base 1 (Area 7.2 sqm)
  • Central Activity Space (Area 8 sqm)
  • Accessible WC (Area 5.8 sqm)
  • Ambulant Disabled WC (Area 5.8 sqm)
  • Male WC, Female WC.
  • Mechanical and Electrical Services: Installation of new mechanical and electrical systems, including proposed PV panel layout, general and emergency lighting, and associated ducting and ventilation systems as specified in drawings EL203, EL204, M200, and M204. This includes modifications to existing electrical services as required.
  • Structural Works: Foundation layout, deadwork layout, ground floor layout, lintel layout, ring beam layout, roof structural joist layout, and roof steelwork layout.
  • Finishes and Fit-out: Installation of internal finishes, fixtures, and fittings as per architectural and engineering specifications.
  • Compliance: Adherence to all relevant building regulations, standards (e.g., BS EN standards for aggregates, insulation, timber treatment), and health and safety legislation, including the Safety, Health and Welfare at Work (Construction) Regulations 2013.
  • Documentation: Provision of record drawings, design risk assessments, and specifications.
  • Site Works: Includes demolition layout, watermain layout, drainage layout, grading plan, and new road layout as indicated in the transmittal sheet.

The contract will require the contractor to manage all aspects of the construction process, from initial site preparation through to final completion and handover.

3. Background & buyer context

Scoil Phobail Bheara is procuring this construction project to provide additional accommodation. The project aligns with the ongoing development and improvement of educational facilities within the region. While specific policy drivers are not detailed, the expansion of school infrastructure is a common objective for educational bodies to meet growing student needs and enhance learning environments. The project is being tendered to ensure a competitive process for selecting a contractor capable of delivering the required construction works to the specified standards and timeline. No incumbent contractor is mentioned in the provided documentation.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement:
  • Yearly Turnover arising from General Construction/Civil Engineering category: €4,000,000.00.
  • Insurance:
  • Public Liability Insurance: €6,500,000.00 for any one event.
  • Employer's Liability Insurance: €13,000,000.00 for any one event.
  • Professional Indemnity Insurance: €1,500,000.00 annual aggregate limit.
  • Certifications:
  • Not specified for this tender, beyond general compliance with Irish Health and Safety regulations.
  • Past experience:
  • Minimum of three construction contracts, similar in nature and complexity to this project, which the Tenderer has directly carried out in the last five years.
  • For HS criteria, at least two members of the contractor's managerial staff must have experience in relation to projects of similar nature, size and complexity.
  • Personnel:
  • Management staff must have appropriate educational/professional qualifications and experience, with relevant Health and Safety qualifications, training, and experience.
  • At least one member of managerial staff must have at least 8 hours annual construction health and safety training for each of the past 3 years.
  • At least one member of personnel must have attended a structured externally-validated health and safety training course providing at least 8 hours annual training, or have attained a formal health and safety post-graduate qualification. This person cannot be the same as the one noted for managerial staff.
  • CVs for management staff should indicate relevant qualifications, training, experience on similar projects, and their role.
  • Geographic / facility constraints:
  • Not specified for this tender.

5. Award criteria & scoring

The award criteria are not explicitly detailed with percentage weightings in the provided extract. However, the tender process will assess bids based on a combination of quality and price. Technical capability, including health and safety competence, past experience, and personnel qualifications, will be evaluated. The final award will be made to the most economically advantageous tender, considering both quality and cost elements. All health and safety selection criteria are pass/fail.

6. Submission requirements

Bidders are required to submit the following:

  • Curriculum Vitae (CVs): For management and project personnel, detailing qualifications, experience, and roles on past projects. CVs should not exceed a specified page limit (implied by the template structure). A maximum of four projects can be considered per CV.
  • List of Previous Works Projects: To be provided using Appendix B1 (List of Previous Works Projects). Certificates of Satisfactory Execution (Appendix B2) must accompany this list.
  • Health and Safety Supplement: Completion of relevant sections of the Health and Safety Supplement 3.4.1, including organisational structure and CVs of management staff and personnel.
  • Safety Statement: A Safety Statement in the format outlined by the Health and Safety Authority, addressing specific requirements and minimum standards for the role of Contractor.
  • Declarations:
  • European Single Procurement Document (ESPD) is implied by standard procurement procedures.
  • Bona Fides declarations.
  • Tax clearance.
  • Conflict of Interest declarations.
  • Pricing Schedule: A detailed pricing schedule will be required, formatted according to tender specifications.
  • Submission Portal: Submissions must be made via the eTenders platform. Specific format rules for electronic submission are not detailed here but are standard for the platform.
  • Mandatory Site Visit: Not specified for this tender.

7. Key dates & process

Event Date/Time
RFT issued Not stated
Clarification deadline Not stated
Mandatory site visit Not stated
Tender deadline 2026-08-12T11:00:00+00:00
Expected award Not stated
Contract start Not stated
Go-live / mobilisation Not stated

8. Contract terms that matter

  • Contract Length: Not specified.
  • Payment Terms: Minimum amount for interim payments, except release of retention, is €5,000. Employer shall pay invoices within 21 days of receipt.
  • Liquidated Damages: Not specified.
  • Termination Clauses: Not specified.
  • IP Ownership: Not specified.
  • Sub-contracting Rules: Not specified.
  • Parent Company Guarantee/Bond: Not specified.

9. Risks, red flags & unusuals

  • Health and Safety Focus: The tender places significant emphasis on Health and Safety competence, with detailed requirements for both management and personnel. Bidders must demonstrate robust H&S policies, training, and experience.
  • Detailed Personnel Requirements: Specific requirements for H&S training hours and qualifications for both managerial staff and other personnel indicate a need for well-qualified and trained individuals.
  • Turnover vs. Contract Value: The turnover requirement of €4,000,000.00 is higher than the stated contract value of €3,000,000.00. This is a common practice to ensure financial stability but requires careful consideration by bidders.
  • Lack of Specific Award Criteria: The absence of detailed award criteria and scoring weightings means bidders must infer that a balanced approach to quality and price will be used, with a strong emphasis on meeting all technical and H&S requirements.

10. SME fit assessment

This tender is structured to attract established construction firms with demonstrated experience in educational or similar public sector building projects.

  • Who can credibly bid: Small to medium-sized enterprises (SMEs) with a strong track record in general construction, particularly those with existing experience in school or public building works, could be suitable. They must meet the €4 million average annual turnover requirement and possess the necessary insurance levels. A key differentiator will be the demonstrable health and safety competence, requiring specific training and qualifications for key personnel.
  • Consortium/Sub-contracting: The documents do not explicitly prohibit consortia or sub-contracting. However, the emphasis on direct experience and the specific personnel requirements suggest a preference for bidders who can deliver the core services themselves. Sub-contracting would need careful management to ensure compliance with all H&S and quality criteria.
  • Indicative bid-prep effort: Bid preparation will be substantial due to the detailed H&S requirements, the need to compile extensive CVs and project references, and the development of a comprehensive pricing schedule. An estimate of 10-20 days of focused effort from a bid team is reasonable.
  • Pwin signal: The turnover requirement and the detailed H&S criteria suggest that larger, more established firms with dedicated H&S departments may have an advantage. The lack of specific award criteria means meeting all mandatory requirements is paramount.

11. Where to dig deeper

  • Source RFT Filename(s): Not explicitly stated, but likely includes documents referenced like "3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx", "Appendix-E-QC1 - Curriculum Vitae_ds_v.01.docx", "Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx", and various drawing files (e.g., "0220_EL203.pdf").
  • eTenders CFT ID: Not specified in the provided metadata.
  • Contact Email / Clarification Portal: Not specified.
  • Most Important Attachments:
  • "3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx" (Health and Safety Competence)
  • "Appendix-E-QC1 - Curriculum Vitae_ds_v.01.docx" (CV Template)
  • "Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx" (Previous Works List Template)
  • Relevant drawings (e.g., EL203, EL204, M204) detailing the scope of accommodation.

Can you bid?

Minimum turnover

€4,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

BS EN standards for aggregatesBS EN standards for insulationBS EN standards for timber treatmentSafety, Health and Welfare at Work (Construction) Regulations 2013

Scoring

Most Economically Advantageous Tender

Documents (142)

PDF

0220 - Electrical Specification - TI.pdf

3.1 MB · Specification

PDF

0220 - Mechanical Specification - TI.pdf

1002.3 KB · Specification

PDF

T-24-109-SP-01-A_Architects Specification.pdf

1.0 MB · Specification

PDF

0220 - Electrical Pricing - TI.pdf

222.2 KB · Pricing / BOQ / Schedule of Rates

PDF

0220 - Mechanical Pricing - TI.pdf

202.3 KB · Pricing / BOQ / Schedule of Rates

PDF

Volume C Pricing Document June 2026.pdf

5.7 MB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

54.0 KB · Contract / Agreement / Terms

PDF

4250P - Fire Safety Certificate Report-RevA.pdf

176.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

26.9 KB · Form / Declaration / Certificate

PDF

Volume B - Form of Tender.pdf

550.6 KB · Form / Declaration / Certificate

PDF

0220 GEC Beara Drawing Register.pdf

369.1 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03100 Proposed Watermain.pdf

2.7 MB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03200 Drainage Layout.pdf

2.6 MB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03400 Proposed Swept Path Analysis.pdf

1.2 MB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03600 Proposed Grading Plan.pdf

919.7 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03700 New Road Layout.pdf

3.0 MB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-CE-03901 Typical Gulley & Floorpath Details.pdf

203.1 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-02000 Demolition Layout.pdf

479.4 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05000_01 Foundation Layout.pdf

409.6 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05001_01 Deadwork Layout.pdf

401.8 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05003_01 Ground Floor Layout.pdf

690.4 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05004_01 Lintel Layout.pdf

469.2 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05005_02 Ring Beam Layout.pdf

504.0 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05007_02 Roof Structural Joist Layout.pdf

609.8 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05012_01 Roof Steelwork Layout.pdf

668.3 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05020_01 Elevations.pdf

761.3 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05030_01 Cross Sections 1 & 2.pdf

635.9 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05031_01 Cross Sections 3 & 4.pdf

570.4 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05032_00 Cross Sections 5, 6, 7 & 8.pdf

428.8 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-05800_00 Pre-fab Installation Layout.pdf

832.2 KB · Drawing / Plan / Layout

PDF

20017-CRO-X-XXX-DR-SE-09900_00 General Notes.pdf

113.2 KB · Drawing / Plan / Layout

PDF

4250 DA02A Ground Floor Plan-Entire School.pdf

862.0 KB · Drawing / Plan / Layout

PDF

4250 DA03A Ground Floor Plan-SEN Base.pdf

1.0 MB · Drawing / Plan / Layout

PDF

T-24-109-02_Existing Site Plan_A2_1-500.pdf

1.9 MB · Drawing / Plan / Layout

PDF

T-24-109-03-A_Proposed Site Plan_A2_1-500.pdf

2.6 MB · Drawing / Plan / Layout

PDF

T-24-109-04_Proposed Construction Phase 1 Site Layout Plan_A2_1-500.pdf

2.2 MB · Drawing / Plan / Layout

PDF

T-24-109-05_Proposed Construction Phase 2 Site Layout Plan_A2_1-500.pdf

1.9 MB · Drawing / Plan / Layout

PDF

T-24-109-06_Proposed Whole School Floor Plan_A2_1-200.pdf

2.2 MB · Drawing / Plan / Layout

PDF

T-24-109-07-A_Proposed Whole School Elevations_A1_1_200.pdf

1.4 MB · Drawing / Plan / Layout

PDF

T-24-109-08-A_Proposed SEN Base Floor Plan_A2_1-100.pdf

1.1 MB · Drawing / Plan / Layout

PDF

T-24-109-10-A_Proposed NE & SE Elevations_A1_1-50.pdf

859.1 KB · Drawing / Plan / Layout

PDF

T-24-109-11-A_Proposed NW & SW Elevations_A1_1-50.pdf

861.0 KB · Drawing / Plan / Layout

PDF

T-24-109-15_Proposed Finishes Floor Plan_A2_1-100.pdf

1.1 MB · Drawing / Plan / Layout

PDF

T-24-109-16_Proposed Indicative Furniture Layout_A2_1-100.pdf

994.9 KB · Drawing / Plan / Layout

PDF

T-24-109-19_Proposed Sanitary Layouts_A1_1-20.pdf

703.1 KB · Drawing / Plan / Layout

PDF

T-24-109-25_Proposed Sanitary Layouts-Toilets & Cleaner Store_A1.pdf

1016.0 KB · Drawing / Plan / Layout

PDF

0220 - GEC DRA.pdf

409.3 KB

PDF

0220-SDG 01 TF01-S2B Issue.pdf

543.7 KB

PDF

0220_BW1.pdf

1.3 MB

PDF

0220_BW101.pdf

1.8 MB

PDF

0220_BW102.pdf

1.2 MB

PDF

0220_BW2.pdf

1.8 MB

PDF

0220_EL1.pdf

786.6 KB

PDF

0220_EL101.pdf

914.7 KB

PDF

0220_EL102.pdf

863.8 KB

PDF

0220_EL103.pdf

861.5 KB

PDF

0220_EL104.pdf

894.1 KB

PDF

0220_EL105.pdf

850.8 KB

PDF

0220_EL106.pdf

826.0 KB

PDF

0220_EL107.pdf

745.1 KB

PDF

0220_EL108.pdf

731.5 KB

PDF

0220_EL109.pdf

834.2 KB

PDF

0220_EL110.pdf

886.9 KB

PDF

0220_EL2.pdf

716.3 KB

PDF

0220_EL201.pdf

1.4 MB

PDF

0220_EL202.pdf

882.1 KB

PDF

0220_EL203.pdf

254.6 KB

PDF

0220_EL204.pdf

1.0 MB

PDF

0220_EL205.pdf

853.8 KB

PDF

0220_EL206.pdf

1.1 MB

PDF

0220_EL207.pdf

853.1 KB

PDF

0220_EL208.pdf

485.1 KB

PDF

0220_EL209.pdf

278.6 KB

PDF

0220_EL210.pdf

498.5 KB

PDF

0220_M1.pdf

514.8 KB

PDF

0220_M101.pdf

588.2 KB

PDF

0220_M200.pdf

2.3 MB

PDF

0220_M201.pdf

1.1 MB

PDF

0220_M202.pdf

716.9 KB

PDF

0220_M203.pdf

1.0 MB

PDF

0220_M204.pdf

892.4 KB

PDF

0220_M205.pdf

693.8 KB

PDF

0220_M206.pdf

1.2 MB

PDF

0220_M207.pdf

608.4 KB

PDF

0220_M208.pdf

282.6 KB

PDF

0220_M209.pdf

537.9 KB

PDF

0220_M210.pdf

299.8 KB

PDF

20017-CRO-RP-SE-00400_DRA 260218.pdf

321.7 KB

PDF

20017-CRO-SH-SE-00100_Transmittal Sheet-260423.pdf

443.5 KB

PDF

20017-CRO-SP-SE-00100_CS Spec.pdf

834.3 KB

PDF

20362-400-01.pdf

1.2 MB

PDF

24-109 _DFG Architects DRA_ Stage 2B_REV A.pdf

229.4 KB

PDF

24-109_Stage 2B_Issue Sheet_22042026.pdf

254.0 KB

PDF

24-113 Preliminary S&H Plan Rev B.pdf

14.1 MB

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

45.7 KB

PDF

4250 DAC Prefab Grant with Conditions.pdf

114.9 KB

PDF

4250 DAC Report Prefab - RevA.pdf

170.6 KB

PDF

4250 FSC Prefab Grant with Conditions.pdf

115.0 KB

PDF

4250 Prefab - Grant of Permission.pdf

1.7 MB

PDF

4250 SEN Base - Grant of Permission.pdf

2.1 MB

PDF

4250 SEN DAC Grant with Conditions.pdf

250.3 KB

PDF

4250 SEN FSC Grant with conditions.pdf

248.2 KB

PDF

4250-DAC-01.pdf

2.0 MB

PDF

4250-DAC-02A.pdf

1.0 MB

PDF

4250-DAC-03A.pdf

721.3 KB

PDF

4250P-FSC-02A-Revised Information.pdf

350.5 KB

PDF

4250P-FSC-03.pdf

151.6 KB

DOCX

Appendix-E-QC1 - Curriculum Vitae_ds_v.01.docx

51.9 KB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

31.3 KB · Appendix / Annex

DOCX

DoEY_DTP-2025_-_Letter_of_Invitation_to_tender_Works (1).docx

69.6 KB

DOCX

ESPD.docx

75.4 KB · ESPD (European Single Procurement Document)

PDF

Instruction to Tenderers - June 2026.pdf

567.5 KB

DOCX

MF1.13_Model_Form_09-04-2020.docx

46.0 KB

DOCX

MF1.6_Model_Form_09-04-2020.docx

55.6 KB

DOCX

MF_1.10_v1.3_25-11-2025.docx

53.7 KB

PDF

P20059_ Rp_Int_D01.pdf

6.9 MB

PDF

PROJECT PARTICULARS.pdf

1.2 MB

OTHER

Proposed Architects sections A.odt

5.9 KB

PDF

PW-CF5_v2.10_16-06-2026.pdf

887.3 KB

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

193.4 KB

DOCX

QW_Part_2_v1.1_18-11-2024.docx

58.4 KB

PDF

Rev 1 page.pdf

191.3 KB

PDF

T-24-109-01_Site Location Plan_A3_1-2500.pdf

1.0 MB

PDF

T-24-109-09_Proposed SEN Base Roof Plan_A2_1-100.pdf

1.3 MB

PDF

T-24-109-12-B_Proposed Sections A-A & C-C_A1_1-50.pdf

2.0 MB

PDF

T-24-109-13-B_Proposed Sections B-B & D-D_A1_1-50.pdf

2.0 MB

PDF

T-24-109-14_Proposed Extension Reflective Ceiling Plan_A2_1-100.pdf

1.4 MB

PDF

T-24-109-17-A_Proposed External Window & Door Schedule_A1_1-25.pdf

803.0 KB

PDF

T-24-109-18_Proposed Internal Door Schedule_A1_1-25.pdf

823.9 KB

PDF

T-24-109-20_Proposed Fitted Furniture-Safe Base 1_A1.pdf

1016.2 KB

PDF

T-24-109-21_Proposed Fitted Furniture-Safe Base 2_A1.pdf

897.7 KB

PDF

T-24-109-22_Proposed Fitted Furniture-Storage & Cloakroom_A1_1-10 & 25.pdf

725.4 KB

PDF

T-24-109-23_Proposed Fitted Furniture-Assisted & Ambulent WCs_A1_1-25.pdf

1019.9 KB

PDF

T-24-109-24_Proposed Room Data Sheet-D.L Skills & M.Stream Classroom_A1.pdf

1.0 MB

PDF

T-24-109-26-B_Proposed Wall Sections & Construction Details-Sheet 1_A1.pdf

1.2 MB

PDF

T-24-109-27-B_Proposed Wall Sections & Construction Details-Sheet 2_A1.pdf

1005.5 KB

PDF

T-24-109-28-B_Proposed Wall Sections & Construction Details-Sheet 3_A1.pdf

994.9 KB

PDF

T-24-109-29-A_Proposed Wall Sections & Construction Details-Sheet 4_A1.pdf

957.6 KB

PDF

T-24-109-BC-01_BCAR Requirements.pdf

1.5 MB

PDF

T-24-109-IIS-01_Internal Ironmongery Schedule.pdf

397.7 KB

ZIP

wetransfer_stage-3-beara-cs-tender-docs_june-2026_2026-07-02_1227 (1).zip

178.7 MB

Original notice text

The project consists of the construction of an extension to Scoil Phobail Bheara consisting of a 2 class SEN and an addiotional classroom as outlined in the Tender sdocuments

AI analysis updated 2 weeks, 2 days ago

Bid ↗
Details

Value

€3.0m

Deadline

02 Sep

View on eTenders ↗

Location

Castletownbere, Co Cork

Procedure

Open

eTenders ID

8564223

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender