Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / FCC/112/26 Est of Multi-Party Framework Design and Build Works (Range €20m-€60m)
Closed Construction & Civil Engineering Works SME Suitable Framework Open

FCC/112/26 Est of Multi-Party Framework Design and Build Works (Range €20m-€60m)

Value

€200.0m

Deadline

12 Aug

Fingal County Council multi-party framework for design and build works valued at €200m.

SME fit: High Bid effort: Medium 📍 Dublin

Fingal County Council multi-party framework for design and build works valued at €200m.

Bidder profile

Ideal bidders are firms experienced in public procurement with strong quality controls and the capacity to meet insurance and turnover requirements.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Fingal County Council_371
Title FCC/112/26 Est of Multi-Party Framework Design and Build Wks (Range €20m-€60m ) with an Initial Contract for a. Blakestown Cross, b. Woodside Swords and c. Park Rd Rush for Fingal County Council
CPV / category VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims) / Construction & Civil Engineering
Estimated value €200000000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-07-14T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for FCC/112/26 Est of Multi-Party Framework Design and Build Wks (Range €20m-€60m ) with an Initial Contract for a. Blakestown Cross, b. Woodside Swords and c. Park Rd Rush for Fingal County Council. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Fingal County Council_371.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event; Maximum excess for Public liability: €10,000[10] in respect of prope

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 20,000,000
  • Insurance
  • Public Liability — €6,500,000
  • Professional Indemnity — €6,500,000
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event; Maximum excess for Public liability: €10,000[10] in respect of prope

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2026-07-14T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): 91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf, ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx
  • eTenders CFT ID: not stated
  • Clarification contact / portal: [email protected]
  • Priority attachments: 91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf, ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx, QA 5.2 Design Team Skills v3.0.xlsx

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Minimum turnover

€20,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (276)

PDF

12205 Blakestown Road _Preliminary Inspection Plan_Tender Input.pdf

175.2 KB · Specification

PDF

23013-XX-X-ZZZ-SP-ROD-SE-0001.pdf

713.4 KB · Specification

PDF

23013-XX-ZZZZZZ-ZZZ-SH-FCC-AR-9100_P08_0_HPI_Tracker.pdf

169.6 KB · Specification

PDF

23013-XX-ZZZZZZ-ZZZ-SP-FCC-AR-8000-Architectural Specification.pdf

1.4 MB · Specification

PDF

23013-XX-ZZZZZZ-ZZZ-SP-FCC-AR-8100-Architectural Preliminaries.pdf

172.6 KB · Specification

PDF

23013-ZZ-ZZ-ZZZ-SP-MOMA-ME-0002_Mechanical & Electrical Product Specific.pdf

1.3 MB · Specification

PDF

23029-XX-X-ZZZ-SP-ROD-SE-0001 - P03.pdf

723.3 KB · Specification

PDF

23196-XX-X-ZZZ-SP-ROD-SE-0001 - P02.pdf

709.3 KB · Specification

PDF

23FGF10 Woodside Swords_NBS Specification.pdf

197.4 KB · Specification

PDF

25-053_LD-01-TS.pdf

1.4 MB · Specification

PDF

25-053_LD-02-TS.pdf

8.7 MB · Specification

PDF

25-053_LD-04-TS.pdf

820.1 KB · Specification

PDF

25-056_2026-03-18_Landscape Specification.pdf

692.3 KB · Specification

PDF

25-056_2026-03-18_Tree Surgery - Tree Felling Specification.pdf

625.1 KB · Specification

ZIP

25-056_BD-01-TS.zip

9.0 MB · Specification

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

48.0 KB · Specification

DOCX

3.4.3-HS-Works-Specialist-with-Design_v3.1-25-11-2025.docx

53.5 KB · Specification

PDF

A.1.2_D&B_Blakestown Employers Requirements Part 2 (Technical).pdf

508.2 KB · Specification

PDF

A.1.2E ER Appendix E - Product Specification Matrix (Completed by Contractor) (1).pdf

78.3 KB · Specification

PDF

A.1.2E ER Appendix E - Product Specification Matrix (Completed by Contractor) (2).pdf

78.3 KB · Specification

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0002-EIRTemplate.docx

517.7 KB · Specification

PDF

EC-4.0-Univerisal-Design-Evidence-advice.pdf

171.3 KB · Specification

DOCX

EN 8.2 Principles of Tran to Circ Econ v3.1.docx

59.8 KB · Specification

PDF

EN-5.0-Ecology-Evidence-advice.pdf

182.4 KB · Specification

PDF

HPI-Technical-Manual-v3.1.pdf

2.1 MB · Specification

PDF

IGBC-HPI-Thermal-bridging-Evidence-Guidanc.pdf

267.6 KB · Specification

PDF

Part L Report for Apartment 26, Blakestown Road, Dublin.pdf

141.8 KB · Specification

PDF

Part L Report for Apartment 28, Blakestown Road, Dublin.pdf

142.4 KB · Specification

PDF

Part L Report for Apartment 29, Blakestown Road, Dublin.pdf

142.2 KB · Specification

PDF

Part L Report for Apartment 6, Blakestown Road, Dublin.pdf

141.8 KB · Specification

DOCX

QA 5.1 Reporting Framework v3.0 RevA.docx

67.8 KB · Specification

PDF

Softworks Specification_Tender.pdf

1.6 MB · Specification

PDF

Tree Works Specification_Tender.pdf

749.6 KB · Specification

PDF

12205 Blakestown _ Mulhuddart Cross - BC(A)R Tender Document Guidance.pdf

2.1 MB · RFT / Invitation to Tender

PDF

23013-ZZ-ZZ-ZZZ-SP-MOMA-EE-0001_Electrical Services Works Requirement.pdf

926.3 KB · RFT / Invitation to Tender

PDF

23013-ZZ-ZZ-ZZZ-SP-MOMA-ME-0001_Mechanical Services Works Requirement.pdf

638.7 KB · RFT / Invitation to Tender

DOCX

91581 Blakestown FTS2_v2.8-08-04-2026- Tender.docx

113.2 KB · RFT / Invitation to Tender

PDF

91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf

515.4 KB · RFT / Invitation to Tender

DOCX

Framework Information Document.docx

114.8 KB · RFT / Invitation to Tender

DOCX

ITTW2_Open_Procedure_v.03_28-05-26 Blakestown-Woodside-ParkRoad.docx

80.3 KB · RFT / Invitation to Tender

PDF

ITTW2_Open_Procedure_v.03_28-05-26 Blakestown-Woodside-ParkRoad.pdf

480.8 KB · RFT / Invitation to Tender

DOCX

ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx

88.2 KB · RFT / Invitation to Tender

XLSX

23FG10 Woodside Swords_Planting Schedule.xlsx

33.7 KB · Pricing / BOQ / Schedule of Rates

PDF

91582 - Blakestown Cross Pricing Document.pdf

802.1 KB · Pricing / BOQ / Schedule of Rates

XLSX

91582 - Blakestown Cross Pricing Document.xlsx

92.2 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

56.1 KB · Contract / Agreement / Terms

PDF

A.1.1_D&B_Blakestown Employers Requirements Part 1 (Contractual).pdf

253.1 KB · Contract / Agreement / Terms

PDF

A.1.2C ER Appendix C - Contractor's Design Documentation.pdf

287.5 KB · Contract / Agreement / Terms

PDF

A.1.2C ER Appendix C - Contractor's Design Documentation_revA.pdf

190.2 KB · Contract / Agreement / Terms

PDF

A.1.2C ER Appendix C - Contractor_s Design Documentation.pdf

188.3 KB · Contract / Agreement / Terms

DOCX

PW-CF9_Contract_v1.0_30.03.26_FCC Framework Agreement.docx

63.1 KB · Contract / Agreement / Terms

PDF

25026 DAC Form SIGNED.pdf

485.4 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

44.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

30.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

29.6 KB · Form / Declaration / Certificate

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0004-InformationProtocolTemplate.docx

896.2 KB · Form / Declaration / Certificate

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0014-BIMRiskRegisterTemplate.docx

98.8 KB · Form / Declaration / Certificate

XLSX

EN 5.0 Ecology Option B v3.0.xlsx

231.3 KB · Form / Declaration / Certificate

PDF

Form_of_Application_for_a_Fire_Safety_Certificate.pdf

281.8 KB · Form / Declaration / Certificate

DOCX

Forms_of_undertaking.docx

96.0 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EC 2.0 Life Cycle Costings v3.0.docx

176.8 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EC 3.1 Universal Design v3.0.docx

173.9 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EN 10.0 Resp Pro Timber v3.0.docx

173.9 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EN 11.0 EPD v3.0.docx

173.9 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EN 4.0 Internal Water Use v3.0.docx

173.9 KB · Form / Declaration / Certificate

DOCX

HPI Declaration EN 7.0 Whole Life Carbon v3.0.docx

173.8 KB · Form / Declaration / Certificate

DOCX

HPI Declaration HW 2.0 Natural Lighting v3.0.docx

173.9 KB · Form / Declaration / Certificate

DOCX

HPI Declaration HW 6.0 Low VOC level 1 v3.0.docx

174.0 KB · Form / Declaration / Certificate

DOCX

HPI Declaration HW 6.0 Low VOC level 2 v3.0.docx

174.0 KB · Form / Declaration / Certificate

DOCX

HPI Declaration HW 7.0 Radon Testing v3.0.docx

173.8 KB · Form / Declaration / Certificate

DOCX

HPI Declaration QA 2.0 Quality Therm Bridg v3.0.docx

173.8 KB · Form / Declaration / Certificate

DOCX

HW 5.0 Summer Comfort Checklist v3.0.docx

25.1 KB · Form / Declaration / Certificate

PDF

23013-60-AB-L04-DR-MOMA-EE-1001.pdf

833.6 KB · Drawing / Plan / Layout

PDF

23013-60-AB-ZZZ-SC-MOMA-EE-1001.pdf

175.6 KB · Drawing / Plan / Layout

PDF

23013-RG-MOMA-EE-0001.pdf

84.0 KB · Drawing / Plan / Layout

PDF

23013-RG-MOMA-ME-0001.pdf

83.1 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-L00-DR-FCC-AR-5001-P08-0.pdf

148.5 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-L00-DR-FCC-AR-5002-P08-0.pdf

154.5 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-L00-DR-FCC-AR-5003-P08-0.pdf

167.3 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-L00-DR-FCC-AR-5004-P08-0.pdf

506.0 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0100-P08-0.pdf

183.6 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0105-P08-0.pdf

641.1 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0110-P08-0.pdf

339.4 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0111-P08-0.pdf

315.9 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0200-P08-0.pdf

290.4 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-0300-P08-0.pdf

1.7 MB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-2210-P08-0.pdf

493.1 KB · Drawing / Plan / Layout

PDF

23013-XX-00XXXX-ZZZ-DR-FCC-AR-2211-P08-0.pdf

403.3 KB · Drawing / Plan / Layout

PDF

23013-XX-52-AB01XX-B01-DR-MOMA-PE-1001_ABOVE GROUND DRAINAGE SERVICES BASEMENT FLOOR STACK LAYOUT.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23013-XX-52-AB01XX-ZZZ-DR-MOMA-PE-1001_ABOVE GROUND DRAINAGE SERVICES TYPICAL FLOOR STACK LAYOUT.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23013-XX-53-AB01XX-B01-DR-MOMA-PE-1001_WATER DISTRIBUTION BASEMENT FLOOR LAYOUT.pdf

889.5 KB · Drawing / Plan / Layout

PDF

23013-XX-53-AB01XX-ZZZ-DR-MOMA-PE-1001_WATER DISTRIBUTION TYPICAL FLOOR LAYOUT.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23013-XX-56-AB01XX-ZZZ-DR-MOMA-ME-1001_LANDLORD SPACE HEATING TYPICAL FLOOR LAYOUT.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-59-AB01XX-ZZZ-DR-MOMA-PE-1001_FIRE PROTECTION TYPICAL FLOOR LAYOUT.pdf

991.4 KB · Drawing / Plan / Layout

PDF

23013-XX-60-00XXXX-L00-DR-MOMA-EE-1001.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23013-XX-60-00XXXX-L00-DR-MOMA-EE-1002.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-60-00XXXX-L00-DR-MOMA-EE-1003.pdf

994.4 KB · Drawing / Plan / Layout

PDF

23013-XX-60-00XXXX-L00-DR-MOMA-EE-1004.pdf

940.9 KB · Drawing / Plan / Layout

PDF

23013-XX-60-00XXXX-L00-DR-MOMA-EE-1005.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23013-XX-61-AB01XX-B01-DR-MOMA-EE-1001_POWER DISTRIBUTION BASEMENT FLOOR LAYOUT.pdf

991.8 KB · Drawing / Plan / Layout

PDF

23013-XX-61-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL POWER DISTRIBUTION FLOOR LAYOUT.pdf

1.6 MB · Drawing / Plan / Layout

PDF

23013-XX-62-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL LANDLORD AREA POWER & DATA SERVICES LAYOUT.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23013-XX-63-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL FLOOR LANDLORD AREA LIGHTING SERVICES.pdf

1.0 MB · Drawing / Plan / Layout

PDF

23013-XX-65-AB01XX-ZZZ-DR-MOMA-EE-1001_GROUND FLOOR LANDLORD AREA SECURITY SERVICES.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23013-XX-65-AB01XX-ZZZ-DR-MOMA-EE-2001_TYPICAL FLOOR LANDLORD AREA FIRE ALARM SERVICES.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-B01-DR-FCC-AR-1200-P08-0.pdf

186.7 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-B01-DR-FCC-AR-4004-P08-0.pdf

178.7 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L00-DR-FCC-AR-1201-P08-0.pdf

2.4 MB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L00-DR-FCC-AR-4003-P08-0.pdf

325.1 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L00-DR-FCC-AR-4202-P08-0.pdf

150.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L01-DR-FCC-AR-1202-P08-0.pdf

427.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L01-DR-FCC-AR-4100-P08-0.pdf

205.9 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L02-DR-FCC-AR-1203-P08-0.pdf

505.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L03-DR-FCC-AR-1204-P08-0.pdf

350.7 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L03-DR-FCC-AR-4402-P08-0.pdf

316.9 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-L04-DR-FCC-AR-1205-P08-0.pdf

124.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-2200-P08-0.pdf

233.7 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-2201-P08-0.pdf

189.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-2202-P08-0.pdf

414.2 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-3200-P08-0.pdf

574.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-3201-P08-0.pdf

210.3 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-3202-P08-0.pdf

232.1 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-3203-P08-0.pdf

221.9 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4005-P08-0.pdf

547.1 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4101-P08-0.pdf

169.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4200-P08-0.pdf

502.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4201-P08-0.pdf

238.2 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4400-P08-0.pdf

327.3 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4401-P08-0.pdf

287.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4403-P08-0.pdf

376.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4404-P08-0.pdf

340.4 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4405-P08-0.pdf

279.6 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4406-P08-0.pdf

205.7 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4500-P08-0.pdf

158.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4501-P08-0.pdf

191.1 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4502-P08-0.pdf

170.8 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4503-P08-0.pdf

211.1 KB · Drawing / Plan / Layout

PDF

23013-XX-AB01XX-ZZZ-DR-FCC-AR-4504-P08-0.pdf

203.5 KB · Drawing / Plan / Layout

PDF

23013-XX-S01XXX-L00-DR-FCC-AR-4000-P08-0.pdf

873.5 KB · Drawing / Plan / Layout

PDF

23013-XX-S01XXX-L00-DR-FCC-AR-4001-P08-0.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23013-XX-S01XXX-L00-DR-FCC-AR-4002-P08-0.pdf

366.5 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0001.pdf

596.6 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0005.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0006.pdf

768.8 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0020.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0021.pdf

674.7 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0030.pdf

753.8 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0031.pdf

1.6 MB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0032.pdf

894.4 KB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0041.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-DR-ROD-CE-0090.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-X-XXX-RG-ROD-CE-0001.pdf

131.4 KB · Drawing / Plan / Layout

PDF

23013-XX-XXXXXX-XXX-RG-FCC-AR-6810.pdf

102.6 KB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-B01-DR-MOMA-EE-1001_BASEMENT ELECTRICAL SERVICES.pdf

1.0 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-B01-DR-MOMA-ZZ-3001_3D Views Basement Plant Room.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-L00-DR-MOMA-ZZ-3001_3D Views Entrance Lobby.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL 2 BED APARTMENT ELECTRICAL SERVICES.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-EE-1002_TYPICAL 1 BED APARTMENT ELECTRICAL SERVICES.pdf

904.5 KB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ME-1001_TYPICAL 2 BED APARTMENT MECHANICAL SERVICES.pdf

1.8 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ME-1002_TYPICAL 1 BED APARTMENT MECHANICAL SERVICES.pdf

1.7 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-PE-1001_TYPICAL 2 BED APARTMENT PUBLIC HEALTH SERVICES.pdf

1.7 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-PE-1002_TYPICAL 1 BED APARTMENT PUBLIC HEALTH SERVICES.pdf

1.6 MB · Drawing / Plan / Layout

PDF

23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ZZ-3001_3D Views Typical Apartment.pdf

2.5 MB · Drawing / Plan / Layout

PDF

23029-RG-MOMA-ME-0001_Mechanical Drawing Register.pdf

84.0 KB · Drawing / Plan / Layout

PDF

23029-XX-X-XXX-RG-ROD-CE-0001.pdf

130.7 KB · Drawing / Plan / Layout

PDF

23196-XX-00XXXX-L00-DR-FCC-AR-1200_P08_1.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23196-XX-X-XXX-RG-ROD-CE-0001.pdf

135.1 KB · Drawing / Plan / Layout

PDF

23196-XX-XXXXXX-XXX-RG-FCC-AR-6810.pdf

96.3 KB · Drawing / Plan / Layout

PDF

23196-ZZ-BB-L00-DR-MOMA-EE-1002_Typical Apartment Block Lighting & Fire Alarm Services Ground Floor.pdf

434.5 KB · Drawing / Plan / Layout

PDF

23196-ZZ-BB-L01-DR-MOMA-EE-1002_Typical Apartment Block Lighting & Fire Alarm Services First Floor.pdf

321.5 KB · Drawing / Plan / Layout

PDF

23196-ZZ-BB-L01-DR-MOMA-ME-1001_Typical Apartment Block Mechanical Services First Floor.pdf

780.7 KB · Drawing / Plan / Layout

PDF

23196-ZZ-BB-L01-DR-MOMA-PE-1001_Typical Apartment Block Public Health Services First Floor.pdf

703.1 KB · Drawing / Plan / Layout

PDF

23196-ZZ-BB-L02-DR-MOMA-PE-1001_Typical Apartment Block Public Health Services Second Floor.pdf

529.9 KB · Drawing / Plan / Layout

PDF

23196-ZZ-TH-ZZZ-DR-MOMA-EE-1002_Terraced House Typical Lighting & Fire Alarm Services.pdf

284.2 KB · Drawing / Plan / Layout

PDF

23196-ZZ-TH-ZZZ-DR-MOMA-ME-1001_Terraced House Typical Mechanical Services.pdf

615.1 KB · Drawing / Plan / Layout

PDF

23FG10 Woodside Swords_Drawing Register.pdf

128.5 KB · Drawing / Plan / Layout

PDF

25-053_LD-03-TS.pdf

8.7 MB · Drawing / Plan / Layout

PDF

25-053_LD-05-TS.pdf

2.6 MB · Drawing / Plan / Layout

PDF

25-053_LP-01-TS.pdf

4.6 MB · Drawing / Plan / Layout

PDF

25-053_LP-02-TS.pdf

4.9 MB · Drawing / Plan / Layout

PDF

25-053_PG-01-TS.pdf

2.0 MB · Drawing / Plan / Layout

PDF

25-053_PP-01-TS.pdf

4.4 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-01-DR-YF-2002 - First Floor.pdf

907.8 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-01-DR-YM-2002 - First Floor.pdf

973.4 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-02-DR-YF-2003 - Second Floor.pdf

911.5 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-02-DR-YM-2003 - Second Floor.pdf

963.0 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-03-DR-YF-2004 - Third Floor.pdf

886.2 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-03-DR-YM-2004 - Third Floor.pdf

941.2 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-04-DR-YF-2005 - Roof Plan.pdf

494.7 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-B1-DR-YF-2000 - Basement.pdf

585.8 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-B1-DR-YM-2000 - B01.pdf

565.0 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-GF-DR-YF-2001 - Ground Floor.pdf

951.0 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-GF-DR-YM-2001 - Ground Floor.pdf

995.8 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YF-1000 - Site Plan.pdf

1.6 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YF-1001 - Site Location Plan.pdf

468.5 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YF-4001 - Elevations 1.pdf

1.2 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YF-4002 - Elevations 2.pdf

1.4 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YF-5001 - Sections 1.pdf

942.9 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YM-1000 - Site Plan.pdf

2.0 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YM-1001 - Site Location Plan.pdf

466.1 KB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YM-4001 - Elevations 1.pdf

1.2 MB · Drawing / Plan / Layout

PDF

25026-AFEC-00-XX-DR-YM-5001 - Sections 1.pdf

928.2 KB · Drawing / Plan / Layout

PDF

Blakestown Cross - Document Register.pdf

243.0 KB · Drawing / Plan / Layout

PDF

Blakestown Cross Public Contour Drawing.pdf

721.5 KB · Drawing / Plan / Layout

PDF

Blakestown Cross Public Lighting Report.pdf

1.4 MB · Drawing / Plan / Layout

PDF

Map 2 ESB map.pdf

509.6 KB · Drawing / Plan / Layout

PDF

Map 5 GPR & TOPO sheet 1.pdf

536.0 KB · Drawing / Plan / Layout

PDF

Map 5 GPR & TOPO sheet 2.pdf

512.8 KB · Drawing / Plan / Layout

PDF

Tree Protection Plan Park Road.pdf

341.6 KB · Drawing / Plan / Layout

PDF

12205 Blakestown Road_ Assigned Certifier Guidance Documents.pdf

2.2 MB · Other

PDF

25026-AFEC-00-XX-RP-YF-001 Report P01.pdf

1.8 MB · Other

PDF

25026-AFEC-00-XX-RP-YM-0001 - Report.pdf

1.5 MB · Other

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0012-BEPTemplate.docx

420.6 KB · Other

ZIP

Blakestown Vol A B and C.zip

141.4 MB · Other

PDF

DAC_BCMS submission confirmation.pdf

301.3 KB · Other

XLSX

EN 4.0 DEAP Water Calculator v3.0.xlsx

77.7 KB · Other

PDF

FSC_BCMS Confirmation of submission email.pdf

300.5 KB · Other

XLSX

HPI Certification Calculator v3.1.xlsx

644.8 KB · Other

ZIP

ITT.zip

266.9 KB · Other

XLSX

QA 5.2 Design Team Skills v3.0.xlsx

203.3 KB · Other

DOCX

~$2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.docx

162 bytes · Other

ZIP

25-056_BD-01-TS (1).zip

9.0 MB

ZIP

25-056_LD-01-02-03-04-05-06-TS.zip

53.2 MB

ZIP

25-056_LP-01-TS.zip

70.6 MB

ZIP

25-056_PP-01-TS.zip

24.8 MB

ZIP

25-056_TRR-01-TS.zip

20.3 MB

PDF

A.1.2A ER Appendix A - BCaR.pdf

228.9 KB · Appendix / Annex

PDF

A.1.2B ER Appendix B - Consents & Licenses.pdf

260.1 KB · Appendix / Annex

PDF

A.1.2D ER Appendix D - Technical Submittals & Samples.pdf

186.5 KB · Appendix / Annex

PDF

A.1.2F ER Appendix F - Room Data Sheets.pdf

147.7 KB · Appendix / Annex

PDF

A.1.2G ER Appendix G - Promotional Branding (Hoarding).pdf

331.4 KB · Appendix / Annex

PDF

A.1.2H ER Appendix H - Planning Compliance Tracker.pdf

197.8 KB · Appendix / Annex

PDF

A.1.2I ER Appendix I - Safety File Checklist.pdf

230.7 KB · Appendix / Annex

ZIP

Addendum 06.zip

860.2 KB · Clarification / Addendum

ZIP

Addendum 07.zip

889.0 KB · Clarification / Addendum

ZIP

Addendum 08.zip

178.1 MB · Clarification / Addendum

ZIP

Addendum 09.zip

183.8 MB · Clarification / Addendum

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

35.3 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

33.9 KB · Appendix / Annex

DOCX

Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx

30.8 KB · Appendix / Annex

PDF

Arboricultural Report Park Road.pdf

1.5 MB · Appendix / Annex

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0001-AIRTemplate.docx

292.1 KB · Tender Response Template

XLSX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0003-IMAMTemplate.xlsx

46.9 KB · Tender Response Template

XLSX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0006-HighLevelRMTemplate.xlsx

115.0 KB · Tender Response Template

DOCX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0013-BIMMobilizationPlanTemplate.docx

106.1 KB · Tender Response Template

XLSX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0015-ResponsibilityMatrixTemplate.xlsx

34.4 KB · Tender Response Template

XLSX

BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0016-TIDPandMIDPTemplate.xlsx

42.3 KB · Tender Response Template

XLSX

EN 10.0 EPD Schedule v3.0.xlsx

186.5 KB · Appendix / Annex

PDF

EN 8.1 Guidelines Waste Audits Tmplt v3.0.pdf

371.1 KB · Appendix / Annex

PDF

EN 8.3 Tmplts CDWstGudlns App C & D v3.0.pdf

111.9 KB · Appendix / Annex

XLSX

EN 9.0 Timber schedule v3.0.xlsx

208.3 KB · Appendix / Annex

DOCX

ESPD (4).docx

79.7 KB · ESPD (European Single Procurement Document)

ZIP

FCC 112 26 Addendum 2.zip

747.4 KB · Clarification / Addendum

ZIP

FCC 112 26 Addendum 01.zip

135.2 MB · Clarification / Addendum

ZIP

FCC 112 26 Addendum 3.zip

6.1 MB · Clarification / Addendum

PDF

Home-User-Guide.pdf

4.7 MB · Tender Response Template

PDF

M&E Appendix 1 FSS_7-2024_Installation for ASHP.pdf

162.3 KB · Appendix / Annex

PDF

M&E Appendix 2 FSS_1-2024 Electrical Spec.pdf

367.6 KB · Appendix / Annex

PDF

M&E Appendix 3 SEAI Ventilation.pdf

801.2 KB · Appendix / Annex

PDF

M&E Appendix 4 Public_lighting TIC.pdf

839.7 KB · Appendix / Annex

PDF

M&E Appendix 5 Employers_Requirements.pdf

2.3 MB · Appendix / Annex

PDF

Map 1 Eir map.pdf

614.0 KB

PDF

Map 3 Gas map.pdf

5.8 MB

PDF

Notes for Tenderers.pdf

50.0 KB · Clarification / Addendum

PDF

Planner Report PartXI-006-24 24 apartments10 houses Woodside Swords_.pdf

279.1 KB

PDF

Planning Report - Part XI-007-24 -Kenure Rush Co. Dublin.pdf

435.1 KB

DOCX

PM25048_Addendum 01-19.05.26.docx

269.7 KB · Clarification / Addendum

DOCX

PM25048_Addendum 02-28.05.26.docx

269.3 KB · Clarification / Addendum

DOCX

PM25048_Addendum 03-29.05.26.docx

269.6 KB · Clarification / Addendum

DOCX

PM25048_Addendum 06 -23.06.26.docx

268.8 KB · Clarification / Addendum

DOCX

PM25048_Addendum 07-01.07.26.docx

269.5 KB · Clarification / Addendum

DOCX

PM25048_Addendum 08 - 09.07.26.docx

269.6 KB · Clarification / Addendum

DOCX

PM25048_Addendum 09 - 17.07.26.docx

269.8 KB · Clarification / Addendum

DOCX

QW2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.docx

206.9 KB · ESPD (European Single Procurement Document)

PDF

QW2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.pdf

593.2 KB · ESPD (European Single Procurement Document)

DOCX

QW_Part_2_v1.1_18-11-2024.docx

66.4 KB · ESPD (European Single Procurement Document)

Original notice text

Establishment of a Multi Supplier Design and Build Contractor Framework for Design and Build Works ranging from €20m-€60m with an initial contract for the Design and Construction of 30 No. Apartments and Associated Works at Blakestown Cross, Mulhuddart, Dublin 15, 34 No Dwellings and Associated Works at Woodside, Swords, Co Dublin and 32 No. Dwellings and Associated Works, Park Rd., Kenure, Rush Co Dublin for Fingal County Council.

AI analysis updated 1 month ago

Bid ↗
Details

Value

€200.0m

Deadline

12 Aug

View on eTenders ↗

Location

Blakestown, Fingal County

Procedure

Open

eTenders ID

7926270

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender