FCC/112/26 Est of Multi-Party Framework Design and Build Works (Range €20m-€60m)
Value
€200.0m
Deadline
12 Aug
12 Aug 2026
Value
€200.0m
Deadline
12 Aug
Fingal County Council multi-party framework for design and build works valued at €200m.
Fingal County Council multi-party framework for design and build works valued at €200m.
Bidder profile
Ideal bidders are firms experienced in public procurement with strong quality controls and the capacity to meet insurance and turnover requirements.
Risks & flags
- Information asymmetry
- Compliance risks
- Timeline compression
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Fingal County Council_371 |
| Title | FCC/112/26 Est of Multi-Party Framework Design and Build Wks (Range €20m-€60m ) with an Initial Contract for a. Blakestown Cross, b. Woodside Swords and c. Park Rd Rush for Fingal County Council |
| CPV / category | VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims) / Construction & Civil Engineering |
| Estimated value | €200000000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-07-14T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This procurement covered the supply scope described in the tender pack for FCC/112/26 Est of Multi-Party Framework Design and Build Wks (Range €20m-€60m ) with an Initial Contract for a. Blakestown Cross, b. Woodside Swords and c. Park Rd Rush for Fingal County Council. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.
- Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Fingal County Council_371.
- Submission package must align with the RFT structure published through the buyer's procurement channel.
- Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
- Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
- Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
- Numerical obligations surfaced in the verified extract: Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event; Maximum excess for Public liability: €10,000[10] in respect of prope
The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.
3. Background & buyer context
The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.
4. Eligibility & selection criteria
- Turnover requirement — Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[15] € 20,000,000
- Insurance
- Public Liability — €6,500,000
- Professional Indemnity — €6,500,000
- Certifications — not specified for this tender
- Past experience — not specified for this tender
- Personnel — not specified for this tender
- Geographic / facility constraints — not specified for this tender
Binding numerical extract used for this section: Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu; Minimum indemnity limit for Employers’ liability insurance: €13,000,000[8] for any one event; Maximum excess for Public liability: €10,000[10] in respect of prope
5. Award criteria & scoring
The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.
| Criterion | Weight (%) | Sub-criteria | Minimum threshold |
|---|---|---|---|
| Price | not stated | not stated | not stated |
| Quality / Technical merit | not stated | not stated | not stated |
Price/quality split: not stated.
6. Submission requirements
- Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
- CVs — provide role-based CVs where requested; page count not stated.
- Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
- Case studies — number and value bands not stated in the extract.
- Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
- Mandatory site visit — not stated in the extract.
- Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.
7. Key dates & process
| Milestone | Date / timing |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline (date + time) | 2026-07-14T11:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.
9. Risks, red flags & unusuals
The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.
10. SME fit assessment
This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.
11. Where to dig deeper
- Source RFT file(s): 91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf, ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx
- eTenders CFT ID: not stated
- Clarification contact / portal: [email protected]
- Priority attachments: 91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf, ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx, QA 5.2 Design Team Skills v3.0.xlsx
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€20,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Documents (276)
12205 Blakestown Road _Preliminary Inspection Plan_Tender Input.pdf
175.2 KB · Specification
23013-XX-X-ZZZ-SP-ROD-SE-0001.pdf
713.4 KB · Specification
23013-XX-ZZZZZZ-ZZZ-SH-FCC-AR-9100_P08_0_HPI_Tracker.pdf
169.6 KB · Specification
23013-XX-ZZZZZZ-ZZZ-SP-FCC-AR-8000-Architectural Specification.pdf
1.4 MB · Specification
23013-XX-ZZZZZZ-ZZZ-SP-FCC-AR-8100-Architectural Preliminaries.pdf
172.6 KB · Specification
23013-ZZ-ZZ-ZZZ-SP-MOMA-ME-0002_Mechanical & Electrical Product Specific.pdf
1.3 MB · Specification
23029-XX-X-ZZZ-SP-ROD-SE-0001 - P03.pdf
723.3 KB · Specification
23196-XX-X-ZZZ-SP-ROD-SE-0001 - P02.pdf
709.3 KB · Specification
23FGF10 Woodside Swords_NBS Specification.pdf
197.4 KB · Specification
25-053_LD-01-TS.pdf
1.4 MB · Specification
25-053_LD-02-TS.pdf
8.7 MB · Specification
25-053_LD-04-TS.pdf
820.1 KB · Specification
25-056_2026-03-18_Landscape Specification.pdf
692.3 KB · Specification
25-056_2026-03-18_Tree Surgery - Tree Felling Specification.pdf
625.1 KB · Specification
25-056_BD-01-TS.zip
9.0 MB · Specification
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
48.0 KB · Specification
3.4.3-HS-Works-Specialist-with-Design_v3.1-25-11-2025.docx
53.5 KB · Specification
A.1.2_D&B_Blakestown Employers Requirements Part 2 (Technical).pdf
508.2 KB · Specification
A.1.2E ER Appendix E - Product Specification Matrix (Completed by Contractor) (1).pdf
78.3 KB · Specification
A.1.2E ER Appendix E - Product Specification Matrix (Completed by Contractor) (2).pdf
78.3 KB · Specification
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0002-EIRTemplate.docx
517.7 KB · Specification
EC-4.0-Univerisal-Design-Evidence-advice.pdf
171.3 KB · Specification
EN 8.2 Principles of Tran to Circ Econ v3.1.docx
59.8 KB · Specification
EN-5.0-Ecology-Evidence-advice.pdf
182.4 KB · Specification
HPI-Technical-Manual-v3.1.pdf
2.1 MB · Specification
IGBC-HPI-Thermal-bridging-Evidence-Guidanc.pdf
267.6 KB · Specification
Part L Report for Apartment 26, Blakestown Road, Dublin.pdf
141.8 KB · Specification
Part L Report for Apartment 28, Blakestown Road, Dublin.pdf
142.4 KB · Specification
Part L Report for Apartment 29, Blakestown Road, Dublin.pdf
142.2 KB · Specification
Part L Report for Apartment 6, Blakestown Road, Dublin.pdf
141.8 KB · Specification
QA 5.1 Reporting Framework v3.0 RevA.docx
67.8 KB · Specification
Softworks Specification_Tender.pdf
1.6 MB · Specification
Tree Works Specification_Tender.pdf
749.6 KB · Specification
12205 Blakestown _ Mulhuddart Cross - BC(A)R Tender Document Guidance.pdf
2.1 MB · RFT / Invitation to Tender
23013-ZZ-ZZ-ZZZ-SP-MOMA-EE-0001_Electrical Services Works Requirement.pdf
926.3 KB · RFT / Invitation to Tender
23013-ZZ-ZZ-ZZZ-SP-MOMA-ME-0001_Mechanical Services Works Requirement.pdf
638.7 KB · RFT / Invitation to Tender
91581 Blakestown FTS2_v2.8-08-04-2026- Tender.docx
113.2 KB · RFT / Invitation to Tender
91581 Blakestown FTS2_v2.8-08-04-2026- Tender.pdf
515.4 KB · RFT / Invitation to Tender
Framework Information Document.docx
114.8 KB · RFT / Invitation to Tender
ITTW2_Open_Procedure_v.03_28-05-26 Blakestown-Woodside-ParkRoad.docx
80.3 KB · RFT / Invitation to Tender
ITTW2_Open_Procedure_v.03_28-05-26 Blakestown-Woodside-ParkRoad.pdf
480.8 KB · RFT / Invitation to Tender
ITTW2_Open_Procedure_v.03_30-03-26 Blakestown-Woodside-ParkRoad.docx
88.2 KB · RFT / Invitation to Tender
23FG10 Woodside Swords_Planting Schedule.xlsx
33.7 KB · Pricing / BOQ / Schedule of Rates
91582 - Blakestown Cross Pricing Document.pdf
802.1 KB · Pricing / BOQ / Schedule of Rates
91582 - Blakestown Cross Pricing Document.xlsx
92.2 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
56.1 KB · Contract / Agreement / Terms
A.1.1_D&B_Blakestown Employers Requirements Part 1 (Contractual).pdf
253.1 KB · Contract / Agreement / Terms
A.1.2C ER Appendix C - Contractor's Design Documentation.pdf
287.5 KB · Contract / Agreement / Terms
A.1.2C ER Appendix C - Contractor's Design Documentation_revA.pdf
190.2 KB · Contract / Agreement / Terms
A.1.2C ER Appendix C - Contractor_s Design Documentation.pdf
188.3 KB · Contract / Agreement / Terms
PW-CF9_Contract_v1.0_30.03.26_FCC Framework Agreement.docx
63.1 KB · Contract / Agreement / Terms
25026 DAC Form SIGNED.pdf
485.4 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
44.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
30.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
29.6 KB · Form / Declaration / Certificate
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0004-InformationProtocolTemplate.docx
896.2 KB · Form / Declaration / Certificate
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0014-BIMRiskRegisterTemplate.docx
98.8 KB · Form / Declaration / Certificate
EN 5.0 Ecology Option B v3.0.xlsx
231.3 KB · Form / Declaration / Certificate
Form_of_Application_for_a_Fire_Safety_Certificate.pdf
281.8 KB · Form / Declaration / Certificate
Forms_of_undertaking.docx
96.0 KB · Form / Declaration / Certificate
HPI Declaration EC 2.0 Life Cycle Costings v3.0.docx
176.8 KB · Form / Declaration / Certificate
HPI Declaration EC 3.1 Universal Design v3.0.docx
173.9 KB · Form / Declaration / Certificate
HPI Declaration EN 10.0 Resp Pro Timber v3.0.docx
173.9 KB · Form / Declaration / Certificate
HPI Declaration EN 11.0 EPD v3.0.docx
173.9 KB · Form / Declaration / Certificate
HPI Declaration EN 4.0 Internal Water Use v3.0.docx
173.9 KB · Form / Declaration / Certificate
HPI Declaration EN 7.0 Whole Life Carbon v3.0.docx
173.8 KB · Form / Declaration / Certificate
HPI Declaration HW 2.0 Natural Lighting v3.0.docx
173.9 KB · Form / Declaration / Certificate
HPI Declaration HW 6.0 Low VOC level 1 v3.0.docx
174.0 KB · Form / Declaration / Certificate
HPI Declaration HW 6.0 Low VOC level 2 v3.0.docx
174.0 KB · Form / Declaration / Certificate
HPI Declaration HW 7.0 Radon Testing v3.0.docx
173.8 KB · Form / Declaration / Certificate
HPI Declaration QA 2.0 Quality Therm Bridg v3.0.docx
173.8 KB · Form / Declaration / Certificate
HW 5.0 Summer Comfort Checklist v3.0.docx
25.1 KB · Form / Declaration / Certificate
23013-60-AB-L04-DR-MOMA-EE-1001.pdf
833.6 KB · Drawing / Plan / Layout
23013-60-AB-ZZZ-SC-MOMA-EE-1001.pdf
175.6 KB · Drawing / Plan / Layout
23013-RG-MOMA-EE-0001.pdf
84.0 KB · Drawing / Plan / Layout
23013-RG-MOMA-ME-0001.pdf
83.1 KB · Drawing / Plan / Layout
23013-XX-00XXXX-L00-DR-FCC-AR-5001-P08-0.pdf
148.5 KB · Drawing / Plan / Layout
23013-XX-00XXXX-L00-DR-FCC-AR-5002-P08-0.pdf
154.5 KB · Drawing / Plan / Layout
23013-XX-00XXXX-L00-DR-FCC-AR-5003-P08-0.pdf
167.3 KB · Drawing / Plan / Layout
23013-XX-00XXXX-L00-DR-FCC-AR-5004-P08-0.pdf
506.0 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0100-P08-0.pdf
183.6 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0105-P08-0.pdf
641.1 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0110-P08-0.pdf
339.4 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0111-P08-0.pdf
315.9 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0200-P08-0.pdf
290.4 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-0300-P08-0.pdf
1.7 MB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-2210-P08-0.pdf
493.1 KB · Drawing / Plan / Layout
23013-XX-00XXXX-ZZZ-DR-FCC-AR-2211-P08-0.pdf
403.3 KB · Drawing / Plan / Layout
23013-XX-52-AB01XX-B01-DR-MOMA-PE-1001_ABOVE GROUND DRAINAGE SERVICES BASEMENT FLOOR STACK LAYOUT.pdf
1.4 MB · Drawing / Plan / Layout
23013-XX-52-AB01XX-ZZZ-DR-MOMA-PE-1001_ABOVE GROUND DRAINAGE SERVICES TYPICAL FLOOR STACK LAYOUT.pdf
1.4 MB · Drawing / Plan / Layout
23013-XX-53-AB01XX-B01-DR-MOMA-PE-1001_WATER DISTRIBUTION BASEMENT FLOOR LAYOUT.pdf
889.5 KB · Drawing / Plan / Layout
23013-XX-53-AB01XX-ZZZ-DR-MOMA-PE-1001_WATER DISTRIBUTION TYPICAL FLOOR LAYOUT.pdf
1.1 MB · Drawing / Plan / Layout
23013-XX-56-AB01XX-ZZZ-DR-MOMA-ME-1001_LANDLORD SPACE HEATING TYPICAL FLOOR LAYOUT.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-59-AB01XX-ZZZ-DR-MOMA-PE-1001_FIRE PROTECTION TYPICAL FLOOR LAYOUT.pdf
991.4 KB · Drawing / Plan / Layout
23013-XX-60-00XXXX-L00-DR-MOMA-EE-1001.pdf
1.1 MB · Drawing / Plan / Layout
23013-XX-60-00XXXX-L00-DR-MOMA-EE-1002.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-60-00XXXX-L00-DR-MOMA-EE-1003.pdf
994.4 KB · Drawing / Plan / Layout
23013-XX-60-00XXXX-L00-DR-MOMA-EE-1004.pdf
940.9 KB · Drawing / Plan / Layout
23013-XX-60-00XXXX-L00-DR-MOMA-EE-1005.pdf
1.1 MB · Drawing / Plan / Layout
23013-XX-61-AB01XX-B01-DR-MOMA-EE-1001_POWER DISTRIBUTION BASEMENT FLOOR LAYOUT.pdf
991.8 KB · Drawing / Plan / Layout
23013-XX-61-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL POWER DISTRIBUTION FLOOR LAYOUT.pdf
1.6 MB · Drawing / Plan / Layout
23013-XX-62-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL LANDLORD AREA POWER & DATA SERVICES LAYOUT.pdf
1.5 MB · Drawing / Plan / Layout
23013-XX-63-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL FLOOR LANDLORD AREA LIGHTING SERVICES.pdf
1.0 MB · Drawing / Plan / Layout
23013-XX-65-AB01XX-ZZZ-DR-MOMA-EE-1001_GROUND FLOOR LANDLORD AREA SECURITY SERVICES.pdf
1.1 MB · Drawing / Plan / Layout
23013-XX-65-AB01XX-ZZZ-DR-MOMA-EE-2001_TYPICAL FLOOR LANDLORD AREA FIRE ALARM SERVICES.pdf
1.4 MB · Drawing / Plan / Layout
23013-XX-AB01XX-B01-DR-FCC-AR-1200-P08-0.pdf
186.7 KB · Drawing / Plan / Layout
23013-XX-AB01XX-B01-DR-FCC-AR-4004-P08-0.pdf
178.7 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L00-DR-FCC-AR-1201-P08-0.pdf
2.4 MB · Drawing / Plan / Layout
23013-XX-AB01XX-L00-DR-FCC-AR-4003-P08-0.pdf
325.1 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L00-DR-FCC-AR-4202-P08-0.pdf
150.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L01-DR-FCC-AR-1202-P08-0.pdf
427.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L01-DR-FCC-AR-4100-P08-0.pdf
205.9 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L02-DR-FCC-AR-1203-P08-0.pdf
505.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L03-DR-FCC-AR-1204-P08-0.pdf
350.7 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L03-DR-FCC-AR-4402-P08-0.pdf
316.9 KB · Drawing / Plan / Layout
23013-XX-AB01XX-L04-DR-FCC-AR-1205-P08-0.pdf
124.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-2200-P08-0.pdf
233.7 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-2201-P08-0.pdf
189.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-2202-P08-0.pdf
414.2 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-3200-P08-0.pdf
574.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-3201-P08-0.pdf
210.3 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-3202-P08-0.pdf
232.1 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-3203-P08-0.pdf
221.9 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4005-P08-0.pdf
547.1 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4101-P08-0.pdf
169.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4200-P08-0.pdf
502.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4201-P08-0.pdf
238.2 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4400-P08-0.pdf
327.3 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4401-P08-0.pdf
287.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4403-P08-0.pdf
376.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4404-P08-0.pdf
340.4 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4405-P08-0.pdf
279.6 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4406-P08-0.pdf
205.7 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4500-P08-0.pdf
158.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4501-P08-0.pdf
191.1 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4502-P08-0.pdf
170.8 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4503-P08-0.pdf
211.1 KB · Drawing / Plan / Layout
23013-XX-AB01XX-ZZZ-DR-FCC-AR-4504-P08-0.pdf
203.5 KB · Drawing / Plan / Layout
23013-XX-S01XXX-L00-DR-FCC-AR-4000-P08-0.pdf
873.5 KB · Drawing / Plan / Layout
23013-XX-S01XXX-L00-DR-FCC-AR-4001-P08-0.pdf
1.5 MB · Drawing / Plan / Layout
23013-XX-S01XXX-L00-DR-FCC-AR-4002-P08-0.pdf
366.5 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0001.pdf
596.6 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0005.pdf
1.4 MB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0006.pdf
768.8 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0020.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0021.pdf
674.7 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0030.pdf
753.8 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0031.pdf
1.6 MB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0032.pdf
894.4 KB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0041.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-X-XXX-DR-ROD-CE-0090.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-X-XXX-RG-ROD-CE-0001.pdf
131.4 KB · Drawing / Plan / Layout
23013-XX-XXXXXX-XXX-RG-FCC-AR-6810.pdf
102.6 KB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-B01-DR-MOMA-EE-1001_BASEMENT ELECTRICAL SERVICES.pdf
1.0 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-B01-DR-MOMA-ZZ-3001_3D Views Basement Plant Room.pdf
1.5 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-L00-DR-MOMA-ZZ-3001_3D Views Entrance Lobby.pdf
1.5 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-EE-1001_TYPICAL 2 BED APARTMENT ELECTRICAL SERVICES.pdf
1.2 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-EE-1002_TYPICAL 1 BED APARTMENT ELECTRICAL SERVICES.pdf
904.5 KB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ME-1001_TYPICAL 2 BED APARTMENT MECHANICAL SERVICES.pdf
1.8 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ME-1002_TYPICAL 1 BED APARTMENT MECHANICAL SERVICES.pdf
1.7 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-PE-1001_TYPICAL 2 BED APARTMENT PUBLIC HEALTH SERVICES.pdf
1.7 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-PE-1002_TYPICAL 1 BED APARTMENT PUBLIC HEALTH SERVICES.pdf
1.6 MB · Drawing / Plan / Layout
23013-XX-ZZ-AB01XX-ZZZ-DR-MOMA-ZZ-3001_3D Views Typical Apartment.pdf
2.5 MB · Drawing / Plan / Layout
23029-RG-MOMA-ME-0001_Mechanical Drawing Register.pdf
84.0 KB · Drawing / Plan / Layout
23029-XX-X-XXX-RG-ROD-CE-0001.pdf
130.7 KB · Drawing / Plan / Layout
23196-XX-00XXXX-L00-DR-FCC-AR-1200_P08_1.pdf
1.2 MB · Drawing / Plan / Layout
23196-XX-X-XXX-RG-ROD-CE-0001.pdf
135.1 KB · Drawing / Plan / Layout
23196-XX-XXXXXX-XXX-RG-FCC-AR-6810.pdf
96.3 KB · Drawing / Plan / Layout
23196-ZZ-BB-L00-DR-MOMA-EE-1002_Typical Apartment Block Lighting & Fire Alarm Services Ground Floor.pdf
434.5 KB · Drawing / Plan / Layout
23196-ZZ-BB-L01-DR-MOMA-EE-1002_Typical Apartment Block Lighting & Fire Alarm Services First Floor.pdf
321.5 KB · Drawing / Plan / Layout
23196-ZZ-BB-L01-DR-MOMA-ME-1001_Typical Apartment Block Mechanical Services First Floor.pdf
780.7 KB · Drawing / Plan / Layout
23196-ZZ-BB-L01-DR-MOMA-PE-1001_Typical Apartment Block Public Health Services First Floor.pdf
703.1 KB · Drawing / Plan / Layout
23196-ZZ-BB-L02-DR-MOMA-PE-1001_Typical Apartment Block Public Health Services Second Floor.pdf
529.9 KB · Drawing / Plan / Layout
23196-ZZ-TH-ZZZ-DR-MOMA-EE-1002_Terraced House Typical Lighting & Fire Alarm Services.pdf
284.2 KB · Drawing / Plan / Layout
23196-ZZ-TH-ZZZ-DR-MOMA-ME-1001_Terraced House Typical Mechanical Services.pdf
615.1 KB · Drawing / Plan / Layout
23FG10 Woodside Swords_Drawing Register.pdf
128.5 KB · Drawing / Plan / Layout
25-053_LD-03-TS.pdf
8.7 MB · Drawing / Plan / Layout
25-053_LD-05-TS.pdf
2.6 MB · Drawing / Plan / Layout
25-053_LP-01-TS.pdf
4.6 MB · Drawing / Plan / Layout
25-053_LP-02-TS.pdf
4.9 MB · Drawing / Plan / Layout
25-053_PG-01-TS.pdf
2.0 MB · Drawing / Plan / Layout
25-053_PP-01-TS.pdf
4.4 MB · Drawing / Plan / Layout
25026-AFEC-00-01-DR-YF-2002 - First Floor.pdf
907.8 KB · Drawing / Plan / Layout
25026-AFEC-00-01-DR-YM-2002 - First Floor.pdf
973.4 KB · Drawing / Plan / Layout
25026-AFEC-00-02-DR-YF-2003 - Second Floor.pdf
911.5 KB · Drawing / Plan / Layout
25026-AFEC-00-02-DR-YM-2003 - Second Floor.pdf
963.0 KB · Drawing / Plan / Layout
25026-AFEC-00-03-DR-YF-2004 - Third Floor.pdf
886.2 KB · Drawing / Plan / Layout
25026-AFEC-00-03-DR-YM-2004 - Third Floor.pdf
941.2 KB · Drawing / Plan / Layout
25026-AFEC-00-04-DR-YF-2005 - Roof Plan.pdf
494.7 KB · Drawing / Plan / Layout
25026-AFEC-00-B1-DR-YF-2000 - Basement.pdf
585.8 KB · Drawing / Plan / Layout
25026-AFEC-00-B1-DR-YM-2000 - B01.pdf
565.0 KB · Drawing / Plan / Layout
25026-AFEC-00-GF-DR-YF-2001 - Ground Floor.pdf
951.0 KB · Drawing / Plan / Layout
25026-AFEC-00-GF-DR-YM-2001 - Ground Floor.pdf
995.8 KB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YF-1000 - Site Plan.pdf
1.6 MB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YF-1001 - Site Location Plan.pdf
468.5 KB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YF-4001 - Elevations 1.pdf
1.2 MB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YF-4002 - Elevations 2.pdf
1.4 MB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YF-5001 - Sections 1.pdf
942.9 KB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YM-1000 - Site Plan.pdf
2.0 MB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YM-1001 - Site Location Plan.pdf
466.1 KB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YM-4001 - Elevations 1.pdf
1.2 MB · Drawing / Plan / Layout
25026-AFEC-00-XX-DR-YM-5001 - Sections 1.pdf
928.2 KB · Drawing / Plan / Layout
Blakestown Cross - Document Register.pdf
243.0 KB · Drawing / Plan / Layout
Blakestown Cross Public Contour Drawing.pdf
721.5 KB · Drawing / Plan / Layout
Blakestown Cross Public Lighting Report.pdf
1.4 MB · Drawing / Plan / Layout
Map 2 ESB map.pdf
509.6 KB · Drawing / Plan / Layout
Map 5 GPR & TOPO sheet 1.pdf
536.0 KB · Drawing / Plan / Layout
Map 5 GPR & TOPO sheet 2.pdf
512.8 KB · Drawing / Plan / Layout
Tree Protection Plan Park Road.pdf
341.6 KB · Drawing / Plan / Layout
12205 Blakestown Road_ Assigned Certifier Guidance Documents.pdf
2.2 MB · Other
25026-AFEC-00-XX-RP-YF-001 Report P01.pdf
1.8 MB · Other
25026-AFEC-00-XX-RP-YM-0001 - Report.pdf
1.5 MB · Other
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0012-BEPTemplate.docx
420.6 KB · Other
Blakestown Vol A B and C.zip
141.4 MB · Other
DAC_BCMS submission confirmation.pdf
301.3 KB · Other
EN 4.0 DEAP Water Calculator v3.0.xlsx
77.7 KB · Other
FSC_BCMS Confirmation of submission email.pdf
300.5 KB · Other
HPI Certification Calculator v3.1.xlsx
644.8 KB · Other
ITT.zip
266.9 KB · Other
QA 5.2 Design Team Skills v3.0.xlsx
203.3 KB · Other
~$2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.docx
162 bytes · Other
25-056_BD-01-TS (1).zip
9.0 MB
25-056_LD-01-02-03-04-05-06-TS.zip
53.2 MB
25-056_LP-01-TS.zip
70.6 MB
25-056_PP-01-TS.zip
24.8 MB
25-056_TRR-01-TS.zip
20.3 MB
A.1.2A ER Appendix A - BCaR.pdf
228.9 KB · Appendix / Annex
A.1.2B ER Appendix B - Consents & Licenses.pdf
260.1 KB · Appendix / Annex
A.1.2D ER Appendix D - Technical Submittals & Samples.pdf
186.5 KB · Appendix / Annex
A.1.2F ER Appendix F - Room Data Sheets.pdf
147.7 KB · Appendix / Annex
A.1.2G ER Appendix G - Promotional Branding (Hoarding).pdf
331.4 KB · Appendix / Annex
A.1.2H ER Appendix H - Planning Compliance Tracker.pdf
197.8 KB · Appendix / Annex
A.1.2I ER Appendix I - Safety File Checklist.pdf
230.7 KB · Appendix / Annex
Addendum 06.zip
860.2 KB · Clarification / Addendum
Addendum 07.zip
889.0 KB · Clarification / Addendum
Addendum 08.zip
178.1 MB · Clarification / Addendum
Addendum 09.zip
183.8 MB · Clarification / Addendum
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
35.3 KB · Appendix / Annex
Appendix_C_Bankers_Letter.docx
33.9 KB · Appendix / Annex
Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx
30.8 KB · Appendix / Annex
Arboricultural Report Park Road.pdf
1.5 MB · Appendix / Annex
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0001-AIRTemplate.docx
292.1 KB · Tender Response Template
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0003-IMAMTemplate.xlsx
46.9 KB · Tender Response Template
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0006-HighLevelRMTemplate.xlsx
115.0 KB · Tender Response Template
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0013-BIMMobilizationPlanTemplate.docx
106.1 KB · Tender Response Template
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0015-ResponsibilityMatrixTemplate.xlsx
34.4 KB · Tender Response Template
BIM-FCC-Z-Z-ZZZ-TE-ADX-IM-0016-TIDPandMIDPTemplate.xlsx
42.3 KB · Tender Response Template
EN 10.0 EPD Schedule v3.0.xlsx
186.5 KB · Appendix / Annex
EN 8.1 Guidelines Waste Audits Tmplt v3.0.pdf
371.1 KB · Appendix / Annex
EN 8.3 Tmplts CDWstGudlns App C & D v3.0.pdf
111.9 KB · Appendix / Annex
EN 9.0 Timber schedule v3.0.xlsx
208.3 KB · Appendix / Annex
ESPD (4).docx
79.7 KB · ESPD (European Single Procurement Document)
FCC 112 26 Addendum 2.zip
747.4 KB · Clarification / Addendum
FCC 112 26 Addendum 01.zip
135.2 MB · Clarification / Addendum
FCC 112 26 Addendum 3.zip
6.1 MB · Clarification / Addendum
Home-User-Guide.pdf
4.7 MB · Tender Response Template
M&E Appendix 1 FSS_7-2024_Installation for ASHP.pdf
162.3 KB · Appendix / Annex
M&E Appendix 2 FSS_1-2024 Electrical Spec.pdf
367.6 KB · Appendix / Annex
M&E Appendix 3 SEAI Ventilation.pdf
801.2 KB · Appendix / Annex
M&E Appendix 4 Public_lighting TIC.pdf
839.7 KB · Appendix / Annex
M&E Appendix 5 Employers_Requirements.pdf
2.3 MB · Appendix / Annex
Map 1 Eir map.pdf
614.0 KB
Map 3 Gas map.pdf
5.8 MB
Notes for Tenderers.pdf
50.0 KB · Clarification / Addendum
Planner Report PartXI-006-24 24 apartments10 houses Woodside Swords_.pdf
279.1 KB
Planning Report - Part XI-007-24 -Kenure Rush Co. Dublin.pdf
435.1 KB
PM25048_Addendum 01-19.05.26.docx
269.7 KB · Clarification / Addendum
PM25048_Addendum 02-28.05.26.docx
269.3 KB · Clarification / Addendum
PM25048_Addendum 03-29.05.26.docx
269.6 KB · Clarification / Addendum
PM25048_Addendum 06 -23.06.26.docx
268.8 KB · Clarification / Addendum
PM25048_Addendum 07-01.07.26.docx
269.5 KB · Clarification / Addendum
PM25048_Addendum 08 - 09.07.26.docx
269.6 KB · Clarification / Addendum
PM25048_Addendum 09 - 17.07.26.docx
269.8 KB · Clarification / Addendum
QW2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.docx
206.9 KB · ESPD (European Single Procurement Document)
QW2_Part-1_v2.1_30-03-2026 - Blakestown - Woodside - Park Road.pdf
593.2 KB · ESPD (European Single Procurement Document)
QW_Part_2_v1.1_18-11-2024.docx
66.4 KB · ESPD (European Single Procurement Document)
Original notice text
Establishment of a Multi Supplier Design and Build Contractor Framework for Design and Build Works ranging from €20m-€60m with an initial contract for the Design and Construction of 30 No. Apartments and Associated Works at Blakestown Cross, Mulhuddart, Dublin 15, 34 No Dwellings and Associated Works at Woodside, Swords, Co Dublin and 32 No. Dwellings and Associated Works, Park Rd., Kenure, Rush Co Dublin for Fingal County Council.
AI analysis updated 1 month ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender