Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Development of facilities at Shreelane Lake, Gortnadihy, Skibbereen, Co. Cork
Closed Construction & Civil Engineering Works SME Suitable Open

Development of facilities at Shreelane Lake, Gortnadihy, Skibbereen, Co. Cork

Deadline

10 Aug

Construction and site development for new facilities at Shreelane Lake, Skibbereen, Co. Cork, by Inland Fisheries Ireland.

SME fit: High Bid effort: Medium 📍 Cork

Inland Fisheries Ireland seeks contractor for Shreelane Lake facility development in Skibbereen

Bidder profile

SMEs with a proven track record in civil engineering and construction, capable of managing site safety and adhering to numerous technical standards.

Risks & flags

  • Lack of specific scope details
  • Ambiguous award criteria
  • Unusually long submission deadline
  • Short Public Works Contract applicability unclear

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Inland Fisheries Ireland
Title Development of facilities at Shreelane Lake, Gortnadihy, Skibbereen, Co. Cork
CPV / category Not specified
Estimated value Not disclosed
Per-year (if multi-year) Not specified
Procedure type Not specified
Lots Not specified
Location Skibbereen, Co. Cork
Contract length Not specified
Submission deadline 2026-08-10T13:00:00+00:00
Go-live / start Not specified

2. Scope of Work

This tender seeks a contractor for the development of facilities at Shreelane Lake, Gortnadihy, Skibbereen, Co. Cork. The scope of work involves construction and associated activities to create new facilities at the specified location.

The constituent activities and requirements include:

  • Construction of Facilities: The contractor will be responsible for the physical construction of the new facilities. This will encompass all necessary building works, site preparation, and finishing.
  • Site Works: This includes any necessary groundworks, landscaping, and preparation of the site to accommodate the new facilities.
  • Compliance with Standards: All construction must adhere to relevant Irish and European standards, including but not limited to:
  • IS EN 13242 Annex E for foundation fill type and depth.
  • IS EN 13242 and SR 21 for specifications.
  • IS EN 10080, BS 4449, and BS 4482 for reinforcement.
  • BS EN 10244, BS EN ISO 1461 or equivalent for hot-dip galvanisation of reinforcement.
  • IS EN 206-1 for concrete mixtures.
  • IS EN 934 for admixtures.
  • ISO 9001 accredited manufacturers for concrete supply.
  • IS EN 1996 for masonry construction.
  • IS EN 771 for masonry units.
  • IS EN 13139, IS EN 998, and SR 18 for sand for mortar.
  • IS EN 1996-1-1 for strength class M12 mortar.
  • EN 1996 for mortar testing.
  • BS 1199, BS 1200:1976, and BS EN 13139 for mortar.
  • IS EN 10088 (SS 304) for materials.
  • Project Supervisor for the Construction Stage (PSCS): The contractor will act as the PSCS, responsible for the safety and stability of the works and all operations on site.
  • Quality Control: The contractor must ensure goods and materials are of good quality and suitable for their intended purpose. This includes providing necessary certification for Building Control Regulations compliance.
  • Site Management: The contractor is responsible for securing the site, keeping it in good order, and ensuring the safety of persons on site and protection of the public from hazards.
  • Access Routes and Services: The contractor is responsible for the suitability and maintenance of access routes to and through the site, and for obtaining required facilities, power, water, and other services.
  • Reporting and Notifications: The contractor must inform the Employer's Representative and Assigned Certifier before covering or packing work for inspection, and provide access for inspection and testing.
  • Defects Liability: The contractor must rectify any defects identified before the Defects Certificate is issued.
  • Weather Monitoring: Dust deposition monitoring is required at a minimum of two locations.

3. Background & buyer context

This procurement is for the development of facilities at Shreelane Lake, an initiative by Inland Fisheries Ireland. The project aligns with broader objectives related to the development and enhancement of public amenities and infrastructure connected to fisheries and aquatic environments. While specific policy drivers are not detailed in the provided text, such projects typically support recreational angling, conservation efforts, and public access to natural resources. The contract will be governed by the Short Public Works Contract PW-CF6 v1.15, a standard form issued by the Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement:
  • Minimum average annual turnover of €100,000 arising from Civil Engineering work.
  • Insurance:
  • Public Liability Insurance: Minimum level of €6,500,000 for any one accident. Maximum excess for property only: €10,000.
  • Employer's Liability Insurance: Minimum level of €13,000,000 for any one accident.
  • Professional Indemnity Insurance: Not specified for the Works Contractor, but the maximum permissible excess is the greater of 2% of annual turnover or €5,000.
  • Certifications:
  • Not specified for this tender.
  • Past experience:
  • Bidders must provide a list of up to 22 completed projects similar in nature and complexity to the Works required. Certificates of Satisfactory Execution are required for these projects.
  • Personnel:
  • CV of an engineer/site manager with a minimum of 5 years' experience is required.
  • Geographic / facility constraints:
  • Not specified for this tender.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided text. Typically, public works contracts in Ireland are awarded based on a combination of price and quality, often referred to as the Most Economically Advantageous Tender (MEAT). The specific weighting and sub-criteria for this tender would be outlined in the full tender documentation.

6. Submission requirements

Bidders are required to submit the following:

  • List of Previous Works Projects: A completed Appendix B1, listing up to 22 similar projects with corresponding Certificates of Satisfactory Execution.
  • Banker's Letter: Appendix C, on the applicant's headed paper, authorising the bank to provide financial information.
  • Letter of Undertaking/Bond: Appendix D2, on the surety's headed paper, confirming bond facilities.
  • Pricing Schedule: Not explicitly detailed, but implied by the contract type.
  • Declarations:
  • Suitability Assessment Questionnaire (SAQ) or equivalent prequalification documentation.
  • Bona Fides declarations.
  • Tax clearance.
  • Conflict of Interest declarations.
  • CVs: CVs for named personnel, including an engineer/site manager with a minimum of 5 years' experience.
  • Submission Portal: Bids must be submitted via the eTenders platform.

7. Key dates & process

Event Date/Time
RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-08-10T13:00:00+00:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

  • Contract Form: Short Public Works Contract PW-CF6 v1.15.
  • Contract Commencement: Upon written acceptance of the tender.
  • Payment Terms: Interim payments on account, with a final payment after the Defects Certificate is issued. Payment claims require a response within 14 days, and payment of invoices is due within the period stated in the Schedule.
  • Liquidated Damages: Apply if the Works are not substantially completed within the Time for Completion, at a rate specified in the Schedule.
  • Termination: The contract allows for termination under specific conditions, with provisions for completion by others and associated costs.
  • Performance Bond: May be required, to be provided within 7 days of tender acceptance.
  • Sub-contracting: The contractor may not assign the contract or any part of it without the Employer's consent.
  • Data Protection: Contractor must comply with Data Protection Law, including GDPR, and process Personal Data only in accordance with the contract.

9. Risks, red flags & unusuals

  • Lack of Specificity: The tender documents lack detail regarding the exact scope of works, estimated value, contract length, and award criteria. This ambiguity increases bid preparation risk.
  • Turnover Requirement: The €100,000 average annual turnover for Civil Engineering work, while a minimum, may not fully reflect the complexity or scale of the project if it is substantial.
  • Short Public Works Contract: This contract form is typically used for projects with an estimated value below €1 million (Works) or €500,000 (Services). The absence of an estimated value makes it difficult to gauge if this is the most appropriate contract form.
  • Submission Deadline: The submission deadline is over two years from the current date, which is unusually long for a public works tender. This could indicate a project with a long lead time or potential for significant changes.

10. SME fit assessment

This tender is likely suitable for small to medium-sized enterprises (SMEs) with a demonstrated track record in civil engineering and construction. The minimum turnover requirement of €100,000 suggests that smaller firms with a solid financial footing and relevant project experience can participate. Consortium bidding is not explicitly mentioned as prohibited, which could allow SMEs to collaborate to meet experience or capacity requirements. The bid preparation effort will depend on the clarity of the full scope of works, but typically involves compiling project references, financial information, and insurance details, potentially requiring several days of work. The absence of an incumbent name or strong indications of a sole-supplier framework suggests a competitive bidding environment.

11. Where to dig deeper

  • Source RFT Filename(s): Not explicitly provided in the extract.
  • eTenders CFT ID: Not specified in the extract.
  • Contact Email / Clarification Portal: Not specified in the extract.
  • Most Important Attachments:
  • Appendix B1: List of Previous Works Projects
  • Appendix C: Banker's Letter
  • Appendix D2: Letter of Undertaking/Bond
  • PW-CF6 v1.15: Short Public Works Contract Conditions

Can you bid?

Required certifications

  • ISO 9001

Minimum turnover

€100,000

Public liability insurance

€6,500,000

Named standards / methodologies

IS EN 13242IS EN 10080BS 4449BS 4482BS EN 10244BS EN ISO 1461IS EN 206-1IS EN 934ISO 9001IS EN 1996IS EN 771IS EN 13139IS EN 998SR 18EN 1996BS 1199BS 1200:1976IS EN 10088

Scoring

Most Economically Advantageous Tender

Documents (39)

PDF

24136-SP-1001-TN01 LCE GENERAL C&S SPECIFICATION.pdf

552.6 KB · Specification

PDF

24136-SP-1801-TN02 VOL A - Part 1 Works Requirements (1).pdf

492.9 KB · Specification

PDF

Materials_ KL2.pdf

79.5 KB · Specification

PDF

24136-FN-2402-TN01 ITTW4_Instruction to tenderers.pdf

541.1 KB · RFT / Invitation to Tender

PDF

24136-LT-2401-TN01 ITTW4_Invitation_to_Tender.pdf

95.2 KB · RFT / Invitation to Tender

PDF

24136-PS-2405-TN01 Pricing Document.pdf

150.8 KB · Pricing / BOQ / Schedule of Rates

PDF

24136-FM-2403-TN01 PW-CF6_Contract_v1.15_25-11-2025.pdf

431.0 KB · Contract / Agreement / Terms

DOCX

24136-FM-2404-TN01 FTS-6_v1.7_06-11-2025.docx

63.7 KB · Contract / Agreement / Terms

ZIP

Contract documents Shreelane.zip

75.8 MB · Contract / Agreement / Terms

DOCX

MF-1.31-Site-Closure-Costs-Supplement-29-07-2021.docx

44.5 KB · Contract / Agreement / Terms

DOCX

MF_1.21_Performance_Bond_09-04-2020.docx

52.6 KB · Contract / Agreement / Terms

DOCX

MF_1.22_Project_Supervisor_09-04-2020.docx

38.2 KB · Contract / Agreement / Terms

PDF

24136-FM-2408-TN01 QW2-Supplement_3.4.1.pdf

387.7 KB · Form / Declaration / Certificate

PDF

24136-FM-2409-TN01 QW2-Supplement_3.4.2.pdf

433.3 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

43.5 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

29.4 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

28.9 KB · Form / Declaration / Certificate

DOCX

Forms_of_undertaking.docx

95.5 KB · Form / Declaration / Certificate

DOCX

MF-1.30-Reliance-Warranty-18-07-2022.docx

57.5 KB · Form / Declaration / Certificate

DOCX

MF-1.32-Declaration-re-Regulation-57-28-07-2023.docx

34.8 KB · Form / Declaration / Certificate

DOCX

MF-1.33-Declaration-Oath-still-Valid-28-07-2023.docx

28.1 KB · Form / Declaration / Certificate

DOCX

MF1.1_Model_Form_09-12-2019.docx

49.9 KB · Form / Declaration / Certificate

DOCX

MF_1.23_Rates_of_Pay_09-04-2020.docx

37.6 KB · Form / Declaration / Certificate

PDF

24136-DG-COMBINED-TN01.pdf

2.4 MB · Drawing / Plan / Layout

PDF

Dimensions_ KL2 Accessible.pdf

140.7 KB · Drawing / Plan / Layout

PDF

Shreelane - ESB Network.pdf

399.1 KB · Drawing / Plan / Layout

PDF

Shreelane - Water Network.pdf

2.7 MB · Drawing / Plan / Layout

PDF

24136-FM-2406-TN01 QW2-Suitability_Assestment_Open_Form_Part-1.pdf

704.5 KB · ESPD (European Single Procurement Document)

DOCX

24136-FM-2407-TN01 QW2-Suitability_Assestment_Open_Form_Part-2.docx

65.5 KB · Tender Response Template

PDF

24136-HS-2001-TN01 Designer Risk Assessment.pdf

362.3 KB · Appendix / Annex

PDF

24136-HS-2001-TN01 Preliminary Health & Safety Plan.pdf

524.9 KB · Appendix / Annex

PDF

24136-MD-2001.pdf

180.9 KB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

34.6 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

33.2 KB · Appendix / Annex

DOCX

Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx

30.1 KB · Appendix / Annex

PDF

Assembly Guide KL2 PMR (May 24).pdf

4.5 MB · Appendix / Annex

PDF

Kazuba Toilet System Maintenance Guide.pdf

1.1 MB · Appendix / Annex

DOCX

MF-1.29-17-02-2022.docx

32.6 KB · Insurance / Indemnity

PDF

STK_Guide installation.pdf

3.0 MB · Appendix / Annex

Original notice text

The scheme of works consists of the installation of a wheelchair accessible toilet block and associated site works. The toilet provided should be a unisex single stall facility which can operate without connection to electricity or mains sewers with minimal maintenance requirements. IFI is seeking to appoint a suitably qualified and experienced Contractor to carry out the work requirements

AI analysis updated 1 month, 1 week ago

Bid ↗
Details

Deadline

10 Aug

View on eTenders ↗

Location

Shreelane Lake, Gortnadihy, Skibbereen, Co. Cork

Procedure

Open

eTenders ID

8618809

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender