Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Restoration of Ulster Canal Phases 3.1 and 3.2 - Construction phase
Closed Construction & Civil Engineering Works Open

Restoration of Ulster Canal Phases 3.1 and 3.2 - Construction phase

Deadline

10 Aug

Restoration of Ulster Canal Phases 3.1 and 3.2 focusing on construction activities.

SME fit: Low Bid effort: High 📍 Monaghan

Restoration of Ulster Canal Phases 3.1 and 3.2 focusing on construction activities.

Bidder profile

Suitable for medium to large construction firms with experience in waterway restoration and capacity to meet insurance requirements.

Risks & flags

  • Geographic constraint
  • High insurance requirement
  • Uncertain award criteria

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Waterways Ireland_225
Title Restoration of Ulster Canal Phases 3.1 and 3.2 - Construction phase
CPV / category Not stated
Estimated value Not disclosed
Per-year Not stated
Procedure type Not stated
Lots Not stated
Location Monaghan side of the border, within 300m of the Canal
Contract length Not stated
Submission deadline 2026-06-19T14:00:00+00:00
Go-live / start Not stated

2. Scope of Work

The tender involves the restoration of the Ulster Canal, specifically Phases 3.1 and 3.2, focusing on construction activities. The project aims to enhance the canal's infrastructure and ecological value. The contractor will engage in various activities to achieve these objectives:

  • Construction Activities: Involves realignment and works to alter water levels, ensuring compliance with environmental standards.
  • Geotechnical Work: Adherence to BS EN 1997-2:2007 and related standards for geotechnical investigation and testing.
  • Environmental Management: Implementation of an Invasive Species Management Plan (ISMP) if works are conducted within 7m of Japanese Knotweed or Rhododendron.
  • Site Management: Ensuring all construction activities are located a minimum of 10m from the river bank.
  • Insurance Requirements: Main Contractor must hold Professional Indemnity insurance with a minimum cover of €5M.
  • Volume and Scale: Estimated dredging at 15 locations along the Finn River.
  • Temporary Structures: Erection of temporary barriers with a minimum height of 2m around construction sites.
  • Ecological Considerations: Compliance with ecological impact assessments and mitigation measures as outlined in the Environmental Impact Statement (EIS).

3. Background & buyer context

The restoration of the Ulster Canal is a strategic initiative by Waterways Ireland, aiming to revitalize a historically significant waterway. This project aligns with broader governmental efforts to enhance regional connectivity and promote sustainable tourism. The canal restoration is part of a larger cross-border collaboration between the Northern Ireland Executive and the Irish Government, reflecting commitments to regional development and environmental stewardship. The project is timely, given the increasing focus on ecological conservation and heritage preservation in the area.

4. Eligibility & selection criteria

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Professional Indemnity: €5M for the Main Contractor.
  • Certifications: Not specified for this tender.
  • Past experience: Not specified for this tender.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Work must be conducted on the Monaghan side of the border, within 300m of the Canal.

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/fail thresholds
Technical Quality Not specified Not specified Not specified
Price Not specified Not specified Not specified

The tender uses the Most Economically Advantageous Tender (MEAT) approach, but specific weights and thresholds are not disclosed.

6. Submission requirements

  • Method statement / response document: Not specified.
  • CVs: Not specified.
  • Pricing schedule: Not specified.
  • Case studies: Not specified.
  • Declarations: ESPD, Bona Fides, Tax clearance, Conflict of Interest.
  • Mandatory site visit: Not specified.
  • Submission portal: eTenders; specific format rules not stated.

7. Key dates & process

Event Date
RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-06-19 14:00:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

  • Term + extension structure: Not specified.
  • Payment terms: Not specified.
  • Key SLAs/KPIs: Not specified.
  • Liquidated damages: €1,100 per day for delay in completion.
  • Termination clauses: Not specified.
  • IP ownership: Not specified.
  • Sub-contracting rules: Not specified.
  • Parent-company guarantee or bond requirements: Not specified.

9. Risks, red flags & unusuals

The tender specifies a geographic constraint, limiting the work to the Monaghan side of the border, within 300m of the Canal, which may restrict the bidder pool. The requirement for a €5M Professional Indemnity insurance could be a barrier for smaller firms. The lack of detailed award criteria and scoring weights introduces uncertainty in bid preparation. The project’s dependency on cross-border collaboration may pose risks related to political and funding stability.

10. SME fit assessment

This tender is suitable for medium to large construction firms with experience in waterway restoration and the capacity to meet the €5M Professional Indemnity insurance requirement. Smaller firms may find it challenging to meet the insurance and geographic constraints. Consortiums or sub-contracting arrangements are not explicitly mentioned, but could be a viable approach for SMEs. Bid preparation is likely to require significant effort, given the complexity and scale of the project. The presence of an incumbent or sole-supplier framework is not indicated, suggesting an open competition.

11. Where to dig deeper

  • Source RFT filename(s): Not specified.
  • eTenders CFT ID: Not specified.
  • Contact email or clarification portal: Not specified.
  • Important attachments:
  • "Ulster Canal EIS Vol 2 Appendix C.pdf"
  • "10 of 10 App D - Existing Ground Investigations.zip"
  • "10 of 10 App H - Ecological.zip"

Can you bid?

Professional indemnity insurance

€5,000,000

Named standards / methodologies

BS EN 1997-2:2007

Scoring

Most Economically Advantageous Tender

Documents (78)

PDF

Proposed Hydrological Design-Operation.pdf

868.4 KB · Specification

PDF

LSBUD-251001-38894714.pdf

124.1 KB · RFT / Invitation to Tender

PDF

DW210628 2D-Gortnacarrow SE.pdf

1.3 MB · Pricing / BOQ / Schedule of Rates

PDF

DW210628 2D-Gortnacarrow SW.pdf

2.0 MB · Pricing / BOQ / Schedule of Rates

PDF

DW210628 2D-Wattle Bridge.pdf

747.5 KB · Pricing / BOQ / Schedule of Rates

PDF

DW251110-West 1-1000.pdf

695.1 KB · Pricing / BOQ / Schedule of Rates

PDF

1 of 10 Contract Data Part One C01.pdf

775.8 KB · Contract / Agreement / Terms

PDF

2011 Glover 10-500-15.pdf

3.3 MB · Form / Declaration / Certificate

PDF

LSBUD-251001-38894743.pdf

123.8 KB · Form / Declaration / Certificate

ZIP

10 of 10 App C - Services Drawings and Records.zip

21.3 MB · Drawing / Plan / Layout

PDF

295291 - NIW Service Markup.pdf

1.2 MB · Drawing / Plan / Layout

PDF

DW210628 2D-Gortnacarrow NE.pdf

982.6 KB · Drawing / Plan / Layout

PDF

DW210628 2D-Gortnacarrow NW.pdf

1.3 MB · Drawing / Plan / Layout

PDF

DW210702-Layout1.pdf

654.5 KB · Drawing / Plan / Layout

PDF

DW210702-Layout2.pdf

782.6 KB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout1.pdf

7.0 MB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout2.pdf

32.5 MB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout3.pdf

10.0 MB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout4.pdf

10.2 MB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout5.pdf

32.0 MB · Drawing / Plan / Layout

PDF

DW251027 Rev1-Layout6.pdf

36.6 MB · Drawing / Plan / Layout

PDF

DW251110-East 1-1000.pdf

818.1 KB · Drawing / Plan / Layout

PDF

DW251110-Overview 1-2000.pdf

906.6 KB · Drawing / Plan / Layout

PDF

IN1-25-15500 Map.pdf

524.0 KB · Drawing / Plan / Layout

PDF

IW-AGG-2018-000-Sewer Network.pdf

2.6 MB · Drawing / Plan / Layout

PDF

IW-AGG-2018-000-Water Network.pdf

2.6 MB · Drawing / Plan / Layout

OTHER

plot.log

2.4 KB · Drawing / Plan / Layout

PDF

1. Ulster Canal EIS Vol 1 Part I.pdf

3.8 MB · Other

ZIP

10 of 10 App A - Topographical Survey.zip

133.9 MB · Other

ZIP

10 of 10 App B - Bathymetric Survey.zip

3.7 MB · Other

ZIP

10 of 10 App F - Archaeological and Historic Investigations.zip

15.6 MB · Other

ZIP

10 of 10 App G - EIS.zip

140.8 MB · Other

ZIP

10 of 10 App H - Ecological.zip

19.3 MB · Other

ZIP

10 of 10 App I -Drainage and Hydrological Studies.zip

46.8 MB · Other

PDF

2. Ulster Canal EIS Vol 1 Part II.pdf

2.2 MB · Other

PDF

2011 Glover 10-500-02.pdf

1.7 MB · Other

PDF

2011 Glover 10-500-03.pdf

4.8 MB · Other

PDF

2011 Glover 10-500-04.pdf

4.5 MB · Other

PDF

2011 Glover 10-500-16.pdf

2.0 MB · Other

PDF

2021 Hanmar 21-091.pdf

11.3 MB · Other

PDF

2025 Causeway Geotech 25-1502.pdf

96.7 MB · Other

PDF

2026 APW.pdf

3.9 MB · Other

PDF

3. Ulster Canal EIS Vol 1 Part III.pdf

10.4 MB · Other

PDF

4. Ulster Canal EIS Vol 1 Part IV.pdf

562.6 KB · Other

PDF

Binded.pdf

74.8 MB · Other

PDF

EIS Vol 1 Part III.pdf

10.4 MB · Other

PDF

EMP.pdf

3.1 MB · Other

PDF

firmus response email.pdf

1.0 MB · Other

PDF

FRA 5104719-61-DG-004.pdf

49.1 MB · Other

PDF

Operational Management Plan.pdf

220.5 KB · Other

PDF

Smooth Newt Mitigation Plan.pdf

5.4 MB · Other

DOCX

Summary of 2026 Ecological Assessment.docx

21.0 KB · Other

PDF

Summary of 2026 Ecological Assessment.pdf

11.5 MB · Other

PDF

Ulster Canal EIS NTS.pdf

2.5 MB · Other

ZIP

10 of 10 App D - Existing Ground Investigations.zip

121.6 MB · Appendix / Annex

PDF

10. Ulster Canal EIS Vol 2 Appendix C.pdf

8.3 MB · Appendix / Annex

PDF

11. Ulster Canal EIS Vol 2 Appendix D.pdf

6.6 MB · Appendix / Annex

PDF

12. Ulster Canal EIS Vol 2 Appendix D Figures.pdf

11.8 MB · Appendix / Annex

PDF

13. Ulster Canal EIS Vol 2 Appendix E.pdf

4.6 MB · Appendix / Annex

PDF

14. Ulster Canal EIS Vol 2 Appendix F.pdf

4.1 MB · Appendix / Annex

PDF

15. Ulster Canal EIS Vol 2 Appendix G.pdf

2.8 MB · Appendix / Annex

PDF

2011 Glover 10-500-App H.pdf

236.0 KB · Appendix / Annex

PDF

5. Ulster Canal EIS Vol 1 References.pdf

125.4 KB · Appendix / Annex

PDF

6. Ulster Canal EIS Vol 2 Appendix_Cover.pdf

2.4 MB · Appendix / Annex

PDF

7. Ulster Canal EIS Vol 2 Appendix A.pdf

3.3 MB · Appendix / Annex

PDF

8. Ulster Canal EIS Vol 2 Appendix B1.pdf

5.0 MB · Appendix / Annex

PDF

9. Ulster Canal EIS Vol 2 Appendix B2.pdf

11.7 MB · Appendix / Annex

PDF

Cavan County Council Response.pdf

928.8 KB · Clarification / Addendum

PDF

EIS Vol 2 Appendix F.pdf

4.1 MB · Appendix / Annex

PDF

GNI(UK)253900PC.pdf

98.7 KB · Clarification / Addendum

PDF

IN1-25-15500 Letter.pdf

173.2 KB · Clarification / Addendum

PDF

LSBUD-251001-38894779.pdf

124.6 KB · Tender Response Template

PDF

LSBUD-251001-38894848.pdf

124.2 KB · Tender Response Template

PDF

Mutual Energy Response Email.pdf

989.1 KB · Clarification / Addendum

PDF

NIE Map.pdf

9.7 MB

PDF

Phoenix gas response.pdf

968.6 KB · Clarification / Addendum

PDF

Services Response Register.pdf

550.1 KB · Tender Response Template

PDF

SGN Response email.pdf

1.2 MB · Clarification / Addendum

Original notice text

Ulster Canal Restoration Phase 3 is a cross jurisdictional project with works in both Northern Ireland and Ireland. When complete, Ulster Canal Restoration Phase 3 will connect the navigations of the previously constructed phases of the Ulster Canal Restoration and provide a navigable link from the Erne Navigation via the restored Ulster Canal to Clones. This competition is for the procurement of a Construction Team in respect of Phases 3.1 and 3.2 only, which extends from Castle Saunderson to Gortnacarrow. The works consist largely of the following: • Construction of a new navigation arch at Wattlebridge • Construction of a new bridge at A3 Gortnacarrow • Local realignment of roads • Construction of a marina and lock chamber • Construction of accommodation bridge • construction of 300m of new canal • Dredging of the River Finn • Associated Mechanical and Electrical engineering Works • Landscaping and parking provision

AI analysis updated 1 month, 1 week ago

Bid ↗
Details

Deadline

10 Aug

View on eTenders ↗

Location

Monaghan side of the border, within 300m of the Canal

Procedure

Open

eTenders ID

8030809

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender