Provision of structural and civil engineering services for the repair and refurbishment of the Lower Lighthouse at Sceilg Mhichíl, Co. Kerry.
Structural and civil engineering services for repair and refurbishment of Lower Lighthouse, Sceilg Mhichíl
Bidder profile
Firms with significant experience in heritage building conservation, structural and civil engineering design, and project supervision, particularly for sensitive UNESCO sites.
Risks & flags
- UNESCO World Heritage site constraints
- Seasonal access limitations (May-Sep)
- Heritage structure conservation requirements
- PSDP responsibilities
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Office of Public Works (OPW) |
|---|---|
| Title | Structural/Civil Engineering Services for Lower Lighthouse, Sceilg Mhichíl |
| CPV / category | 71320000-8 (Engineering design services for construction) |
| Estimated value | Not disclosed |
| Per-year | Not stated |
| Procedure type | Open Procedure |
| Lots | 1 |
| Location | Co. Kerry, Ireland |
| Contract length | Not stated |
| Submission deadline | 2026-10-06T11:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
This tender seeks structural and civil engineering services for proposed repair and refurbishment works at the Lower Lighthouse on Sceilg Mhichíl, Co. Kerry. The services encompass the full lifecycle of design and project supervision for conservation and repair works to a heritage structure.
The scope of work includes:
- Preliminary Stage:
- Undertaking a detailed structural and civil engineering assessment of the existing Lower Lighthouse structure.
- Identifying and documenting structural defects, material deterioration, and any associated risks.
- Developing preliminary repair and refurbishment options, considering the heritage status of the site.
- Preparing preliminary designs and cost estimates.
- This stage has a scheduled duration of 13 weeks.
- Design Stage:
- Developing detailed design proposals for the repair and refurbishment works, adhering to conservation principles and relevant building regulations.
- Producing all necessary drawings, specifications, and schedules of works.
- Ensuring designs comply with IS EN 1991-1-1 (Eurocodes) for structural design.
- Acting as Project Supervisor Design Process (PSDP) in accordance with the Safety, Health and Welfare at Work Act 2005 and associated regulations.
- This stage has a scheduled duration of 52 weeks.
- Tender Stage:
- Assisting the Office of Public Works (OPW) in the tender process for the construction works.
- Responding to queries from prospective contractors.
- Construction Stage:
- Providing site supervision and contract administration services during the construction phase.
- Monitoring progress, quality, and safety on site.
- Certifying payments to the contractor.
- Managing any necessary design changes or variations.
- Specific Site Constraints:
- Works can only be carried out on site between May and September each year due to visitor access and site conditions.
- The site is a UNESCO World Heritage site, requiring strict adherence to conservation guidelines.
- The existing structure comprises a concrete ground floor slab, solid masonry walls, timber first floor, and a flat concrete roof. Window openings are a mix of cut granite, brickwork, timber, and reinforced concrete. The first floor consists of timber joists supporting timber floor boards.
3. Background & buyer context
This procurement is initiated by the Office of Public Works (OPW), the primary government body responsible for the management and maintenance of state buildings and heritage sites in Ireland. Sceilg Mhichíl, a UNESCO World Heritage site, is a location of significant historical and cultural importance. The Lower Lighthouse, a component of this site, requires essential repair and refurbishment to ensure its preservation. The procurement aligns with the OPW's mandate to conserve and protect national heritage assets. The specialist report informing this tender was issued to the OPW on 20th August 2021, following a survey conducted on 19th August 2021. The OPW also received 51 archive drawings of the lighthouse on 14th October 2024.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability: €6,500,000 per claim, with a maximum excess of €10,000 for property damage.
- Employer's Liability: €13,000,000 per claim.
- Professional Indemnity: €2,100,000 per claim, with an annual aggregate of €2,500,000.
- Certifications:
- Membership or eligibility for membership of a recognised professional body for the required role (e.g., ACEI, EI, RIAI, SCSI).
- Awareness of Safety, Health and Welfare at Work Act 2005 and associated regulations.
- Past experience:
- A minimum of 10 years of post-qualification (primary degree) experience for key personnel.
- Submission of Certificates of Satisfactory Execution for up to 21 previous projects of a similar nature.
- Personnel:
- Key team members must possess a minimum of 10 years of post-qualification (primary degree) experience.
- The person responsible for health and safety management within the practice must be identified.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The contract will be awarded based on the Most Economically Advantageous Tender (MEAT) principle, with a balance between quality and price.
Criterion Weight (%) Sub-criteria
Can you bid?
Required certifications
- ACEI membership
- EI membership
- RIAI membership
- SCSI membership
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,100,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Lots (1)
Documents (19)
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
39.8 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.4 KB · Form / Declaration / Certificate
1_Definitive Project Brief.pdf
525.1 KB
2_Scope of Engineering Services.pdf
579.3 KB
3_Site Information_compressed.pdf
6.3 MB
5_Prelim Structural report.pdf
7.6 MB
6_Glenwood Timber Report.pdf
352.5 KB
6_Glenwood Timber Report_Photos.pdf
7.1 MB
Appendix_B1_QC1_and_QC2_09-02-2022(1).docx
17.0 KB · Appendix / Annex
COE1_v2.j_Consultancy_Technical_30-09-2024 (4).pdf
914.0 KB
FTS9_Consultancy_v1.10_16-09-2024.docx
268.3 KB
ITT_S2b_v2.0-04-11-2024.pdf
921.4 KB
MF-2.6-v1.1_21-11-2025.doc
76.0 KB
MF_2.1_Professional_Indemnity_09-02-2022(2).docx
40.4 KB · Insurance / Indemnity
MF_2.4_v1.1-25-11-2025 (8).docx
33.1 KB
MF_2.5_v1.1-25-11-2025.docx
31.1 KB
QC2-Part-1_v3.2-25-11-2025.pdf
989.7 KB
QC_Part_2_v1.1_04-11-2024.docx
63.8 KB
Tender Docs Final.zip
24.9 MB
Original notice text
It is proposed to repair and refurbish the Lower Lighthouse to include the following: Repair and conservation works to the existing historic fabric of the building includes the repair works to window lintels and brickwork internally. It also includes repair and conservation works to the original building features. The OPW is seeking to appoint a consultant Structural / Civil Engineer for the project from preliminary design through to handover.
AI analysis updated 13 hours, 25 minutes ago
Deadline
06 Oct
Location
Lower Lighthouse, Sceilg Mhichíl, Co. Kerry
Procedure
Open
eTenders ID
8965794
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender