Skip to content
TenderMatch
← Tenders / Cleveragh Active Travel Scheme
Open Construction & Civil Engineering Works SME Suitable Open

Cleveragh Active Travel Scheme

Deadline

21 Sep

Construction of active travel infrastructure including cycle tracks, footway improvements, and traffic calming on Cleveragh Drive, Sligo.

SME fit: High Bid effort: Medium 📍 Sligo

Sligo County Council seeks contractors for Cleveragh Active Travel Scheme

Bidder profile

A firm with proven experience in civil engineering, roadworks, and traffic management, capable of meeting stringent insurance and safety certification requirements.

Risks & flags

  • Value not disclosed
  • Limited detail on award criteria
  • Reliance on preliminary documents for PSCS development
  • Professional Indemnity Insurance excess calculation variable

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Sligo County Council
Title Unknown
CPV / category Not specified
Estimated value Not disclosed
Per-year Not specified
Procedure type Not specified
Lots Not specified
Location Sligo, Ireland
Contract length 8 Months (October 2026 – May 2027)
Submission deadline 2026-09-21T11:00:00+00:00
Go-live / start 2026-10-01

2. Scope of Work

This tender concerns the construction of the Cleveragh Active Travel Scheme in Sligo. The project involves significant civil engineering and traffic management works along Cleveragh Drive. The contract duration is specified as 8 months, with an intended commencement date of October 2026 and completion by May 2027.

The scope of works includes:

  • Construction of a two-way cycle track: A dedicated lane for cyclists will be built.
  • Footway widening and improvement works: Existing footpaths will be widened and upgraded.
  • New pedestrian and cycle crossing facilities: Safe crossings will be installed for pedestrians and cyclists.
  • Raised traffic calming features: Ramps or other measures will be implemented to reduce vehicle speeds.
  • New road markings and signage: Updated and new road markings and signage will be installed.
  • Public lighting installation and upgrades: Existing public lighting will be upgraded, and new installations made.
  • Junction tightening works: Junctions will be modified to improve safety and traffic flow.
  • Landscaping works: Environmental and aesthetic improvements will be undertaken.
  • Cycle parking facilities: Designated areas for bicycle parking will be created.
  • Associated pavement, drainage, kerbing and utility works: This encompasses all necessary groundwork, including pavement construction, drainage systems, kerbing, and coordination with utility providers.
  • Temporary traffic management throughout the construction period: Comprehensive traffic management plans will be required to ensure safety and maintain traffic flow during all phases of construction.

The works are divided into five estimated phases:

  • Phase 1 (Month 1–2): Site establishment, traffic management installation, site clearance, vegetation removal, and utility investigations.
  • Phase 2 (Month 2–4): Drainage works, kerbing, footway construction, and public lighting ducting/service installations.
  • Phase 3 (Month 4–6): Cycle track construction, junction improvement works, and crossing construction.
  • Phase 4 (Month 6–7): Traffic calming measures, signage and road marking installation, and public lighting installation.
  • Phase 5 (Month 7–8): Landscaping, final surfacing, testing, commissioning, and demobilisation.

The works are located on Cleveragh Drive, Sligo Town, Co. Sligo, along an approximate length of 1000 metres. The required working width varies between 2.5–4.0 metres by phase, with an unobstructed road width of approximately 3.5m to be maintained. A temporary speed limit of 30 km/h is recommended through active work zones.

3. Background & buyer context

Sligo County Council is procuring this active travel scheme to enhance sustainable transport infrastructure within the town. The project, identified by Job No. SO/23/0016, aligns with national and local objectives for promoting cycling and walking. The works are situated along Cleveragh Drive, a local urban road with an estimated 80 vehicles per hour and less than 5% HGVs. The project is being managed by Sligo County Council in their capacity as Project Supervisor Design Process (PSDP) and potentially Project Supervisor for Construction Stage (PSCS). The preliminary health and safety plan indicates that the works are adjacent to live accommodation, a busy road network, and recreational facilities, necessitating careful planning and execution.

4. Eligibility & selection criteria

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Public Liability Insurance: Minimum cover of €6,500,000 for any one accident. Maximum excess for public liability is €6,500.
  • Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event. Maximum excess for employer's liability is €6,500.
  • Professional Indemnity Insurance: Minimum level of cover is not explicitly stated, but the default level is €1.5m. The maximum permissible excess is the greater of 2% of the tenderer's annual turnover or €5,000.
  • Certifications:
  • Safety management system in accordance with ISO 45001:2018 or equivalent is required.
  • Tax clearance status must be verifiable online via Tax Clearance Access Number and Tax Reference Number.
  • Past experience: Bidders must provide a list of completed projects similar in nature and complexity to the works required. Certificates of Satisfactory Execution are required for these projects. The specific number, size, or period for past experience is not explicitly stated in the provided text.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Not specified for this tender.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided documentation. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which considers a combination of price and quality. The weighting between price and quality, along with specific sub-criteria and pass/fail thresholds, would be detailed in the full tender documents.

6. Submission requirements

  • Method statement / response document: Not specified for this tender.
  • CVs: Not specified for this tender.
  • Pricing schedule: Not specified for this tender.
  • Case studies: Bidders must provide a list of completed projects similar in nature and complexity to the works required, with corresponding Certificates of Satisfactory Execution.
  • Declarations:
  • Tax Clearance Access Number and Tax Reference Number for online verification.
  • A Letter of Undertaking from a Surety confirming authorisation to act as a surety and that bond facilities are in place.
  • A Banker's Letter confirming banking relationships and facility details.
  • Mandatory site visit: Not specified for this tender.
  • Submission portal: Tenders must be submitted via eTenders. Specific format rules for electronic copies are mentioned, requiring the number and type of electronic copies as stated in the Particulars.

7. Key dates & process

Event Date/Time
RFT issued Not specified
Clarification deadline As per eTenders (or 14 days before tender deadline)
Tender deadline 2026-09-21T11:00:00+00:00
Expected award Not specified
Contract start 2026-10-01
Go-live / mobilisation Not specified

8. Contract terms that matter

  • Contract length: 8 Months, with an intended start date of October 2026.
  • Payment terms: Not specified.
  • Key SLAs/KPIs: Not specified.
  • Liquidated damages: Not specified.
  • Termination clauses: Not specified.
  • IP ownership: Not specified.
  • Sub-contracting rules: Not specified.
  • Performance Bond: A performance bond may be required, with the surety confirming authorisation and bond facilities. The amount is to be not more than a specified percentage of the eventual contract sum.

9. Risks, red flags & unusuals

  • Value not disclosed: The absence of an estimated contract value makes it difficult for bidders to gauge the scale and complexity accurately for their own risk assessment and resource allocation.
  • Limited detail on award criteria: The lack of specific award criteria and scoring weights means bidders cannot tailor their proposals to meet defined quality expectations beyond the minimum requirements.
  • Reliance on preliminary documents: The tender relies heavily on preliminary documents (Preliminary Health & Safety Plan, Preliminary TTMP) which the appointed PSCS must develop further. This places a significant responsibility on the PSCS to interpret and build upon the initial plans.
  • Potential for incumbent advantage: While not explicitly stated, the nature of local authority infrastructure projects can sometimes favour established local contractors with existing relationships and knowledge of council procedures.
  • Insurance excess calculation: The Professional Indemnity Insurance excess is tied to the tenderer's annual turnover, which can be a variable factor for smaller businesses.

10. SME fit assessment

This tender is likely suitable for small to medium-sized enterprises (SMEs) with demonstrable experience in civil engineering, roadworks, and traffic management. The contract duration of 8 months and the scope of works suggest a project of moderate scale.

  • Viable bidder profile: A firm with a proven track record in delivering similar road infrastructure projects, possessing the necessary safety certifications (ISO 45001 or equivalent), and capable of meeting the specified insurance requirements. Experience in developing and implementing detailed traffic management plans is crucial.
  • Consortium/sub-contracting: The documents do not explicitly prohibit or encourage consortia or sub-contracting. Bidders should clarify this if it is a significant consideration.
  • Indicative bid-prep effort: Bid preparation will likely require significant effort, particularly in developing detailed proposals for traffic management, health and safety, and demonstrating past experience with supporting documentation. This could range from 10-20 days for a well-prepared SME.
  • Pwin signal: The tender is open, with no clear indication of an incumbent. The primary Pwin signals will be the bidder's ability to meet the insurance requirements, demonstrate relevant experience, and present a compelling approach to health and safety and traffic management.

11. Where to dig deeper

  • Source RFT filename(s): Not specified in provided text.
  • eTenders CFT ID: Not specified in provided text.
  • Contact email or clarification portal: Clarifications should be submitted via the eTenders portal as per standard procedure.
  • Most important attachments:
  • Appendix 3(b)(ii) Preliminary Traffic Management Plan
  • SMS Appendix 3(a) (Preliminary Health and Safety Plan).doc
  • Appendix B1 List of Previous Works Projects
  • Appendix C Bankers Letter
  • Appendix D1 QW1 Letter of Undertaking Bond
until submission deadline — 21 Sep 2026 at 12:00 Deadline passed

Can you bid?

Required certifications

  • ISO 45001:2018

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

ISO 45001:2018

Scoring

Most Economically Advantageous Tender

Documents (45)

PDF

AT-TS-007 - Volume A - Specification.pdf

2.0 MB · Specification

PDF

ITTW4_Invitation_to_Tender_Letter.pdf

113.1 KB · RFT / Invitation to Tender

DOCX

ITTW4_Open_Procedure_Short_Form_v2.0_18-11-2024.docx

62.9 KB · RFT / Invitation to Tender

XLSX

AT-TS-007-Cleveragh Active Travel Scheme_BoQ_Rev B.xlsx

68.0 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.0 KB · Contract / Agreement / Terms

DOCX

MF_1.22_Project_Supervisor_09-04-2020.docx

35.9 KB · Contract / Agreement / Terms

PDF

PW-CF6_Contract_v1.15_25-11-2025.pdf

431.0 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.6 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOC

Form No.3(c)(ii) Prequal PSCS exceeding 500K e.doc

183.0 KB · Form / Declaration / Certificate

DOC

Form No.4(a) Design Risk Assessment.doc

133.5 KB · Form / Declaration / Certificate

DOCX

Forms_of_undertaking.docx

91.3 KB · Form / Declaration / Certificate

DOCX

FTS-6_v1.7_06-11-2025 (2).docx

61.8 KB · Form / Declaration / Certificate

DOCX

MF_1.21_Performance_Bond_09-04-2020.docx

50.2 KB · Form / Declaration / Certificate

DOCX

MF_1.23_Rates_of_Pay_09-04-2020.docx

35.3 KB · Form / Declaration / Certificate

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

191.9 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.1_18-11-2024.docx

58.4 KB · Form / Declaration / Certificate

PDF

7307 Cleveragh, Sligo - Topo - 200 ITM15.pdf

3.9 MB · Drawing / Plan / Layout

PDF

A3 Dwg Cleveragh ATS, Sligo.pdf

1.6 MB · Drawing / Plan / Layout

PDF

AT-TS-007 - Volume A - Drawings Part 1.pdf

28.3 MB · Drawing / Plan / Layout

PDF

AT-TS-007 - Volume A - Drawings Part 2.pdf

13.9 MB · Drawing / Plan / Layout

PDF

AT-TS-007 - Volume A - Drawings.pdf

42.0 MB · Drawing / Plan / Layout

PDF

CLD-2025-RO.pdf

1.6 MB · Drawing / Plan / Layout

PDF

Sewer Network Map.pdf

3.4 MB · Drawing / Plan / Layout

PDF

Sewer Network Map1.pdf

4.6 MB · Drawing / Plan / Layout

PDF

Water Disribution Map.pdf

3.3 MB · Drawing / Plan / Layout

PDF

Water Distribution Map1.pdf

4.5 MB · Drawing / Plan / Layout

ZIP

AT TS 007 Cleveragh ATS P2 (4).zip

141.2 MB · Other

PDF

ITTW4_Note_To_Employer.pdf

194.8 KB · Other

XLSX

~$AT-TS-007-Cleveragh Active Travel Scheme_BoQ.xlsx

165 bytes · Other

PDF

12229 - Cleveragh Active Travel Scheme Sligo Co Co - EIA Screening.pdf

1.1 MB · Appendix / Annex

PDF

A4 Calc Cleveragh ATS, Sligo.pdf

3.0 MB · Appendix / Annex

PDF

AA Screening Report.pdf

22.3 MB · Appendix / Annex

PDF

AIA - Sligo.pdf

2.9 MB · Appendix / Annex

PDF

AIA Cleveragh Drive Sligo 260218.pdf

2.7 MB · Appendix / Annex

XLSX

Appendix 3(b)(ii) Preliminary TTMP.xlsx

1.1 MB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

29.9 KB · Appendix / Annex

DOCX

Appendix_D1_QW1_Letter_of_Undertaking_Bond.docx

33.2 KB · Appendix / Annex

DOCX

Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx

26.8 KB · Appendix / Annex

PDF

Response from BT.pdf

401.4 KB · Appendix / Annex

DOC

SMS Appendix 3(a) (Preliminary Health and Safety Plan).doc

257.5 KB · Appendix / Annex

PDF

tree-felling-requirements.pdf

172.7 KB · Appendix / Annex

Original notice text

Sligo County Council, through its Active Travel Section, intends to deliver the Cleveragh Active Travel Scheme to improve sustainable transport infrastructure, road safety, accessibility and connectivity along Cleveragh Drive, Sligo. The Scheme comprises the provision of active travel infrastructure along approximately 1.0km of Cleveragh Drive (L-9208), extending from the junction with Pearse Road (R287) to the vicinity of Cleveragh Park and the Regional Sports Complex. The primary objective of the Scheme is to provide a safe, attractive and accessible environment for pedestrians and cyclists of all ages and abilities, while improving connectivity between residential areas, recreational facilities, educational facilities, sporting amenities and the wider Active Travel network within Sligo Town.

AI analysis updated 13 hours, 31 minutes ago

Bid ↗
Details

Deadline

21 Sep

View on eTenders ↗

Location

Cleveragh Drive, Sligo Town, Co. Sligo, along an approximate length of 1000 metres.

Procedure

Open

eTenders ID

8888590

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender