Cleveragh Active Travel Scheme
Deadline
21 Sep
21 Sep 2026
Deadline
21 Sep
Construction of active travel infrastructure including cycle tracks, footway improvements, and traffic calming on Cleveragh Drive, Sligo.
Sligo County Council seeks contractors for Cleveragh Active Travel Scheme
Bidder profile
A firm with proven experience in civil engineering, roadworks, and traffic management, capable of meeting stringent insurance and safety certification requirements.
Risks & flags
- Value not disclosed
- Limited detail on award criteria
- Reliance on preliminary documents for PSCS development
- Professional Indemnity Insurance excess calculation variable
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Sligo County Council |
|---|---|
| Title | Unknown |
| CPV / category | Not specified |
| Estimated value | Not disclosed |
| Per-year | Not specified |
| Procedure type | Not specified |
| Lots | Not specified |
| Location | Sligo, Ireland |
| Contract length | 8 Months (October 2026 – May 2027) |
| Submission deadline | 2026-09-21T11:00:00+00:00 |
| Go-live / start | 2026-10-01 |
2. Scope of Work
This tender concerns the construction of the Cleveragh Active Travel Scheme in Sligo. The project involves significant civil engineering and traffic management works along Cleveragh Drive. The contract duration is specified as 8 months, with an intended commencement date of October 2026 and completion by May 2027.
The scope of works includes:
- Construction of a two-way cycle track: A dedicated lane for cyclists will be built.
- Footway widening and improvement works: Existing footpaths will be widened and upgraded.
- New pedestrian and cycle crossing facilities: Safe crossings will be installed for pedestrians and cyclists.
- Raised traffic calming features: Ramps or other measures will be implemented to reduce vehicle speeds.
- New road markings and signage: Updated and new road markings and signage will be installed.
- Public lighting installation and upgrades: Existing public lighting will be upgraded, and new installations made.
- Junction tightening works: Junctions will be modified to improve safety and traffic flow.
- Landscaping works: Environmental and aesthetic improvements will be undertaken.
- Cycle parking facilities: Designated areas for bicycle parking will be created.
- Associated pavement, drainage, kerbing and utility works: This encompasses all necessary groundwork, including pavement construction, drainage systems, kerbing, and coordination with utility providers.
- Temporary traffic management throughout the construction period: Comprehensive traffic management plans will be required to ensure safety and maintain traffic flow during all phases of construction.
The works are divided into five estimated phases:
- Phase 1 (Month 1–2): Site establishment, traffic management installation, site clearance, vegetation removal, and utility investigations.
- Phase 2 (Month 2–4): Drainage works, kerbing, footway construction, and public lighting ducting/service installations.
- Phase 3 (Month 4–6): Cycle track construction, junction improvement works, and crossing construction.
- Phase 4 (Month 6–7): Traffic calming measures, signage and road marking installation, and public lighting installation.
- Phase 5 (Month 7–8): Landscaping, final surfacing, testing, commissioning, and demobilisation.
The works are located on Cleveragh Drive, Sligo Town, Co. Sligo, along an approximate length of 1000 metres. The required working width varies between 2.5–4.0 metres by phase, with an unobstructed road width of approximately 3.5m to be maintained. A temporary speed limit of 30 km/h is recommended through active work zones.
3. Background & buyer context
Sligo County Council is procuring this active travel scheme to enhance sustainable transport infrastructure within the town. The project, identified by Job No. SO/23/0016, aligns with national and local objectives for promoting cycling and walking. The works are situated along Cleveragh Drive, a local urban road with an estimated 80 vehicles per hour and less than 5% HGVs. The project is being managed by Sligo County Council in their capacity as Project Supervisor Design Process (PSDP) and potentially Project Supervisor for Construction Stage (PSCS). The preliminary health and safety plan indicates that the works are adjacent to live accommodation, a busy road network, and recreational facilities, necessitating careful planning and execution.
4. Eligibility & selection criteria
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability Insurance: Minimum cover of €6,500,000 for any one accident. Maximum excess for public liability is €6,500.
- Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event. Maximum excess for employer's liability is €6,500.
- Professional Indemnity Insurance: Minimum level of cover is not explicitly stated, but the default level is €1.5m. The maximum permissible excess is the greater of 2% of the tenderer's annual turnover or €5,000.
- Certifications:
- Safety management system in accordance with ISO 45001:2018 or equivalent is required.
- Tax clearance status must be verifiable online via Tax Clearance Access Number and Tax Reference Number.
- Past experience: Bidders must provide a list of completed projects similar in nature and complexity to the works required. Certificates of Satisfactory Execution are required for these projects. The specific number, size, or period for past experience is not explicitly stated in the provided text.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria and scoring mechanism are not detailed in the provided documentation. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which considers a combination of price and quality. The weighting between price and quality, along with specific sub-criteria and pass/fail thresholds, would be detailed in the full tender documents.
6. Submission requirements
- Method statement / response document: Not specified for this tender.
- CVs: Not specified for this tender.
- Pricing schedule: Not specified for this tender.
- Case studies: Bidders must provide a list of completed projects similar in nature and complexity to the works required, with corresponding Certificates of Satisfactory Execution.
- Declarations:
- Tax Clearance Access Number and Tax Reference Number for online verification.
- A Letter of Undertaking from a Surety confirming authorisation to act as a surety and that bond facilities are in place.
- A Banker's Letter confirming banking relationships and facility details.
- Mandatory site visit: Not specified for this tender.
- Submission portal: Tenders must be submitted via eTenders. Specific format rules for electronic copies are mentioned, requiring the number and type of electronic copies as stated in the Particulars.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | Not specified |
| Clarification deadline | As per eTenders (or 14 days before tender deadline) |
| Tender deadline | 2026-09-21T11:00:00+00:00 |
| Expected award | Not specified |
| Contract start | 2026-10-01 |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
- Contract length: 8 Months, with an intended start date of October 2026.
- Payment terms: Not specified.
- Key SLAs/KPIs: Not specified.
- Liquidated damages: Not specified.
- Termination clauses: Not specified.
- IP ownership: Not specified.
- Sub-contracting rules: Not specified.
- Performance Bond: A performance bond may be required, with the surety confirming authorisation and bond facilities. The amount is to be not more than a specified percentage of the eventual contract sum.
9. Risks, red flags & unusuals
- Value not disclosed: The absence of an estimated contract value makes it difficult for bidders to gauge the scale and complexity accurately for their own risk assessment and resource allocation.
- Limited detail on award criteria: The lack of specific award criteria and scoring weights means bidders cannot tailor their proposals to meet defined quality expectations beyond the minimum requirements.
- Reliance on preliminary documents: The tender relies heavily on preliminary documents (Preliminary Health & Safety Plan, Preliminary TTMP) which the appointed PSCS must develop further. This places a significant responsibility on the PSCS to interpret and build upon the initial plans.
- Potential for incumbent advantage: While not explicitly stated, the nature of local authority infrastructure projects can sometimes favour established local contractors with existing relationships and knowledge of council procedures.
- Insurance excess calculation: The Professional Indemnity Insurance excess is tied to the tenderer's annual turnover, which can be a variable factor for smaller businesses.
10. SME fit assessment
This tender is likely suitable for small to medium-sized enterprises (SMEs) with demonstrable experience in civil engineering, roadworks, and traffic management. The contract duration of 8 months and the scope of works suggest a project of moderate scale.
- Viable bidder profile: A firm with a proven track record in delivering similar road infrastructure projects, possessing the necessary safety certifications (ISO 45001 or equivalent), and capable of meeting the specified insurance requirements. Experience in developing and implementing detailed traffic management plans is crucial.
- Consortium/sub-contracting: The documents do not explicitly prohibit or encourage consortia or sub-contracting. Bidders should clarify this if it is a significant consideration.
- Indicative bid-prep effort: Bid preparation will likely require significant effort, particularly in developing detailed proposals for traffic management, health and safety, and demonstrating past experience with supporting documentation. This could range from 10-20 days for a well-prepared SME.
- Pwin signal: The tender is open, with no clear indication of an incumbent. The primary Pwin signals will be the bidder's ability to meet the insurance requirements, demonstrate relevant experience, and present a compelling approach to health and safety and traffic management.
11. Where to dig deeper
- Source RFT filename(s): Not specified in provided text.
- eTenders CFT ID: Not specified in provided text.
- Contact email or clarification portal: Clarifications should be submitted via the eTenders portal as per standard procedure.
- Most important attachments:
- Appendix 3(b)(ii) Preliminary Traffic Management Plan
- SMS Appendix 3(a) (Preliminary Health and Safety Plan).doc
- Appendix B1 List of Previous Works Projects
- Appendix C Bankers Letter
- Appendix D1 QW1 Letter of Undertaking Bond
Can you bid?
Required certifications
- ISO 45001:2018
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (45)
AT-TS-007 - Volume A - Specification.pdf
2.0 MB · Specification
ITTW4_Invitation_to_Tender_Letter.pdf
113.1 KB · RFT / Invitation to Tender
ITTW4_Open_Procedure_Short_Form_v2.0_18-11-2024.docx
62.9 KB · RFT / Invitation to Tender
AT-TS-007-Cleveragh Active Travel Scheme_BoQ_Rev B.xlsx
68.0 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.0 KB · Contract / Agreement / Terms
MF_1.22_Project_Supervisor_09-04-2020.docx
35.9 KB · Contract / Agreement / Terms
PW-CF6_Contract_v1.15_25-11-2025.pdf
431.0 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.6 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
40.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
Form No.3(c)(ii) Prequal PSCS exceeding 500K e.doc
183.0 KB · Form / Declaration / Certificate
Form No.4(a) Design Risk Assessment.doc
133.5 KB · Form / Declaration / Certificate
Forms_of_undertaking.docx
91.3 KB · Form / Declaration / Certificate
FTS-6_v1.7_06-11-2025 (2).docx
61.8 KB · Form / Declaration / Certificate
MF_1.21_Performance_Bond_09-04-2020.docx
50.2 KB · Form / Declaration / Certificate
MF_1.23_Rates_of_Pay_09-04-2020.docx
35.3 KB · Form / Declaration / Certificate
QW2_Part_1_v2.2_25-11-2025.docx
191.9 KB · Form / Declaration / Certificate
QW_Part_2_v1.1_18-11-2024.docx
58.4 KB · Form / Declaration / Certificate
7307 Cleveragh, Sligo - Topo - 200 ITM15.pdf
3.9 MB · Drawing / Plan / Layout
A3 Dwg Cleveragh ATS, Sligo.pdf
1.6 MB · Drawing / Plan / Layout
AT-TS-007 - Volume A - Drawings Part 1.pdf
28.3 MB · Drawing / Plan / Layout
AT-TS-007 - Volume A - Drawings Part 2.pdf
13.9 MB · Drawing / Plan / Layout
AT-TS-007 - Volume A - Drawings.pdf
42.0 MB · Drawing / Plan / Layout
CLD-2025-RO.pdf
1.6 MB · Drawing / Plan / Layout
Sewer Network Map.pdf
3.4 MB · Drawing / Plan / Layout
Sewer Network Map1.pdf
4.6 MB · Drawing / Plan / Layout
Water Disribution Map.pdf
3.3 MB · Drawing / Plan / Layout
Water Distribution Map1.pdf
4.5 MB · Drawing / Plan / Layout
AT TS 007 Cleveragh ATS P2 (4).zip
141.2 MB · Other
ITTW4_Note_To_Employer.pdf
194.8 KB · Other
~$AT-TS-007-Cleveragh Active Travel Scheme_BoQ.xlsx
165 bytes · Other
12229 - Cleveragh Active Travel Scheme Sligo Co Co - EIA Screening.pdf
1.1 MB · Appendix / Annex
A4 Calc Cleveragh ATS, Sligo.pdf
3.0 MB · Appendix / Annex
AA Screening Report.pdf
22.3 MB · Appendix / Annex
AIA - Sligo.pdf
2.9 MB · Appendix / Annex
AIA Cleveragh Drive Sligo 260218.pdf
2.7 MB · Appendix / Annex
Appendix 3(b)(ii) Preliminary TTMP.xlsx
1.1 MB · Appendix / Annex
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
31.3 KB · Appendix / Annex
Appendix_C_Bankers_Letter.docx
29.9 KB · Appendix / Annex
Appendix_D1_QW1_Letter_of_Undertaking_Bond.docx
33.2 KB · Appendix / Annex
Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx
26.8 KB · Appendix / Annex
Response from BT.pdf
401.4 KB · Appendix / Annex
SMS Appendix 3(a) (Preliminary Health and Safety Plan).doc
257.5 KB · Appendix / Annex
tree-felling-requirements.pdf
172.7 KB · Appendix / Annex
Original notice text
Sligo County Council, through its Active Travel Section, intends to deliver the Cleveragh Active Travel Scheme to improve sustainable transport infrastructure, road safety, accessibility and connectivity along Cleveragh Drive, Sligo. The Scheme comprises the provision of active travel infrastructure along approximately 1.0km of Cleveragh Drive (L-9208), extending from the junction with Pearse Road (R287) to the vicinity of Cleveragh Park and the Regional Sports Complex. The primary objective of the Scheme is to provide a safe, attractive and accessible environment for pedestrians and cyclists of all ages and abilities, while improving connectivity between residential areas, recreational facilities, educational facilities, sporting amenities and the wider Active Travel network within Sligo Town.
AI analysis updated 13 hours, 31 minutes ago
Deadline
21 Sep
Buyer
Sligo County CouncilLocation
Cleveragh Drive, Sligo Town, Co. Sligo, along an approximate length of 1000 metres.
Procedure
Open
eTenders ID
8888590
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender