N4 Carrick On Shannon Bypass and Traffic Management Project - Ground Investigation - Standpipe Removal Contract
Deadline
21 Sep
21 Sep 2026
Deadline
21 Sep
Contract for safe removal of standpipes for the N4 Carrick On Shannon Bypass and Traffic Management Project.
Leitrim County Council seeks contractor for standpipe removal as part of N4 bypass project.
Bidder profile
SMEs with proven experience in civil engineering, ground investigation, and temporary traffic management on national roads, capable of meeting substantial insurance requirements.
Risks & flags
- Ambiguous Professional Indemnity Insurance requirement
- Vague scope for standpipe removal (quantity/location)
- Short contract period placeholder
- Specific traffic management experience required for a discrete task
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Leitrim County Council |
|---|---|
| Title | N4 Carrick On Shannon Bypass and Traffic Management Project - Ground Investigation - Standpipe Removal Contract |
| CPV / category | not stated |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Ireland |
| Contract length | not stated |
| Submission deadline | 2026-09-21T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This tender seeks a contractor to undertake ground investigation works specifically for the removal of standpipes as part of the N4 Carrick On Shannon Bypass and Traffic Management Project. The contract will involve the safe and efficient removal of existing standpipes from the ground.
The scope of work includes, but is not limited to:
- Standpipe Identification and Location: Identifying the precise locations of all standpipes requiring removal within the project area.
- Site Preparation: Preparing the immediate work area around each standpipe to ensure safe access and operation. This may involve minor excavation or clearing of debris.
- Standpipe Disconnection and Removal: Safely disconnecting and removing the standpipes from the ground. This will require appropriate tools, equipment, and techniques to prevent damage to surrounding infrastructure or the environment.
- Waste Management and Disposal: Proper handling, containment, and disposal of all materials removed, including any associated soil or debris, in accordance with environmental regulations.
- Site Restoration: Restoring the work area to a safe and tidy condition following the removal of each standpipe. This may involve backfilling any excavated areas and making good the surface.
- Health and Safety Compliance: Adhering to all relevant health and safety legislation and site-specific safety procedures throughout the execution of the works. This includes managing risks associated with working in or near existing infrastructure.
- Reporting: Providing reports on completed works, including details of standpipes removed, locations, and any encountered issues.
The works are associated with the N4 Carrick On Shannon Bypass and Traffic Management Project, indicating that the standpipes are likely related to existing or planned infrastructure for this major road development. The specific nature and quantity of standpipes to be removed are not detailed in the provided metadata, but the contract will focus solely on this specific task.
3. Background & buyer context
This procurement is initiated by Leitrim County Council. The project forms part of the broader N4 Carrick On Shannon Bypass and Traffic Management Project. The tender specifically addresses a component of this larger infrastructure development, focusing on ground investigation and the removal of standpipes. This suggests a need to clear existing ground features before or during the main construction phases of the bypass. The contract is being issued under the Short Public Works Contract framework, indicating a project of a certain scale and complexity managed by the Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability Insurance: Minimum cover of €6,500,000 in respect of any one accident. Maximum permissible excess for property only is €10,000.
- Employer's Liability Insurance: Minimum cover of €13,000,000 in respect of any one accident.
- Professional Indemnity Insurance: Minimum cover level is not explicitly stated but the CA Note suggests a default level of €1.5m or €2.5m proportionate to project size. The maximum permissible excess is the greater of 2% of annual turnover or €5,000.
- Certifications:
- Safety management system in accordance with ISO 45001:2018 or equivalent.
- Past experience:
- A minimum of 5 years' experience in Civil Engineering, directly in the area of Ground Investigation (GI) Contracts.
- Demonstrate a minimum of 5 years' experience in the installation and management of temporary traffic management, holding a relevant Construction Skills certificate (e.g., Signing and Guarding at Roadworks).
- Experience on a minimum of one national road scheme requiring traffic management for over 6000 AADT (Average Annual Daily Traffic).
- Must provide a list of completed projects (Appendix B1) similar in nature and complexity, with Certificates of Satisfactory Execution.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria and scoring mechanism are not detailed in the provided metadata. However, the tender is issued under the Short Public Works Contract, which typically follows a Most Economically Advantageous Tender (MEAT) approach. This usually involves a combination of quality and price, with specific weightings assigned to each. The evaluation will likely assess the technical merit, experience, and proposed methodology of the bidders, alongside their pricing.
6. Submission requirements
Bidders are required to submit the following:
- Completed form of tender and acceptance: This forms the basis of the accepted tender.
- Appendix B1 - List of Previous Works Projects: Detailing completed projects similar in nature and complexity, organised in order of precedence and accompanied by Certificates of Satisfactory Execution.
- Appendix B2 - Certificate of Satisfactory Execution: A completed form for each relevant project.
- Pricing Schedule: To be completed by the bidder.
- Declarations:
- Tax clearance information for online verification.
- Bona Fides declarations.
- Conflict of Interest declarations.
- Insurance details: Confirmation of required insurance cover.
- Certifications: Evidence of ISO 45001:2018 or equivalent certification.
- Method Statement / Response Document: Not explicitly detailed but implied through the need to demonstrate experience and methodology.
- CVs: Not explicitly detailed but implied for key personnel demonstrating experience.
- Submission Portal: Tenders must be submitted via the eTenders platform. Specific format rules for electronic submissions are not detailed but typically involve PDF attachments.
- Mandatory Site Visit: Not specified for this tender.
7. Key dates & process
| Stage | Date/Time |
|---|---|
| RFT issued | Not stated |
| Clarification deadline | Not stated |
| Tender deadline | 2026-09-21T11:00:00+00:00 |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
The contract will be governed by the Short Public Works Contract PW-CF6 v1.15 (25th November 2025). Key terms include:
- Contract Length: The "Contract Period (months)" is stated as "60 days from commencement date", which appears to be a placeholder or specific to a particular schedule item not fully detailed here. The "Time for Completion" is a critical period for substantial completion.
- Payment Terms: Interim payments are made on account as scheduled. A significant portion is paid after substantial completion, with the balance paid after the Defects Certificate is issued. Payment claim notices require a response within 14 days, and the Employer shall pay invoices within the period stated in the Schedule. Interest applies to late payments as per EU Regulations.
- Key SLAs/KPIs: Not explicitly detailed as SLAs/KPIs, but the "Time for Completion" and prompt rectification of defects are critical performance indicators.
- Liquidated Damages: Applicable if the Contractor fails to substantially complete the Works within the Time for Completion, at the rate specified in the Schedule.
- Termination Clauses: The contract allows for termination under specific circumstances, including suspension of works for over 3 months.
- IP Ownership: Not specified for this tender.
- Sub-contracting Rules: The Contractor may engage sub-processors for data processing with prior written notice and employer objection rights. Assignment of the contract requires employer consent.
- Performance Bond: Required if stated in the Schedule, to be provided within 7 days of tender acceptance.
9. Risks, red flags & unusuals
- Ambiguous Insurance Requirements: While Public Liability and Employer's Liability insurance figures are clear (€6.5m and €13m respectively), the specific minimum cover for Professional Indemnity Insurance is not definitively stated, with "CA Note: State the minimum cover proportionate to the size of the project (default level is €1.5m)" and "default level is €2.5m" appearing. Bidders must clarify this requirement.
- Vague Scope for Standpipe Removal: The exact number, type, and location of standpipes to be removed are not specified. This could lead to significant variations in workload and cost if not clarified during the tender process or through site investigation.
- Short Contract Period Placeholder: The "Contract Period (months): 60 days from commencement date" appears unusually short for a public works contract and may be a placeholder or specific to a schedule item not fully detailed.
- Experience Requirements: The requirement for experience in "Signing and Guarding at Roadworks Construction Skills certificate and demonstrate a minimum of 5 years experience in the installation and management of temporary traffic management" alongside experience on national road schemes with high AADT suggests a need for contractors familiar with live road environments, even for a seemingly discrete task.
10. SME fit assessment
This tender is likely suitable for small to medium-sized enterprises (SMEs) with specific expertise in ground investigation and civil engineering works, particularly those with experience in road infrastructure projects.
- Viable Bidder Profile: An SME with a proven track record in civil engineering, specifically ground investigation (GI) contracts, and at least 5 years of experience in this field. They must also possess experience in temporary traffic management, including relevant certifications and experience on national roads with high traffic volumes. The required insurance levels are substantial, so SMEs must ensure they can meet these.
- Consortium/Sub-contracting: The tender documents do not explicitly prohibit consortium bids or sub-contracting. However, the "Applicant or Lead Member completes this Section 2" phrasing suggests a lead entity is expected. SMEs may consider forming consortia to meet all experience and insurance requirements.
- Indicative Bid-Prep Effort: Given the need to compile detailed project lists (Appendix B1), provide certificates, demonstrate specific experience (traffic management, national roads), and ensure insurance compliance, bid preparation could require 5-10 working days for an experienced team.
- Pwin Signal: The tender is for a specific, discrete task (standpipe removal) within a larger project. The experience requirements, particularly regarding traffic management on national roads, suggest that the incumbent or a contractor already involved in the broader N4 project might have an advantage. However, the specific nature of standpipe removal could be open to specialist ground investigation firms.
11. Where to dig deeper
- Source RFT Filename(s): Not explicitly stated in the provided text.
- eTenders CFT ID: Not surfaced in the provided text.
- Contact Email / Clarification Portal: Not specified in the provided text.
- Most Important Attachments:
- [Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx]
- [PW-CF6_Contract_v1.15_25-11-2025.pdf] (Short Public Works Contract Conditions)
Can you bid?
Required certifications
- ISO 45001:2018
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (24)
Vol A - Specification.pdf
1.2 MB · Specification
ITT.pdf
1.0 MB · RFT / Invitation to Tender
Vol C. Pricing Document.pdf
786.8 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.1 KB · Contract / Agreement / Terms
GEN-SMS-F52-Competency-Questionnaire-Contractors-PSCS-1.pdf
291.9 KB · Contract / Agreement / Terms
MF-1.21-18-11-2024.docx
67.3 KB · Contract / Agreement / Terms
MF_1.22_Project_Supervisor_09-04-2020.docx
35.9 KB · Contract / Agreement / Terms
PW-CF6_Contract_v1.15_25-11-2025.pdf
431.0 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.6 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
40.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
Forms_of_undertaking.docx
91.3 KB · Form / Declaration / Certificate
GEN-SMS-F66-Safety-Statement-Validity-Form.pdf
355.1 KB · Form / Declaration / Certificate
Information-Note-GDPR-05-06-2019.pdf
265.7 KB · Form / Declaration / Certificate
MF_1.23_Rates_of_Pay_09-04-2020.docx
35.3 KB · Form / Declaration / Certificate
QW2_Part_1_v2.2_25-11-2025 N4 Standpipes.docx
191.6 KB · Form / Declaration / Certificate
QW2_Suitability_Assessment_Open_Form N4 Standpipes.docx
95.1 KB · Form / Declaration / Certificate
QW_Part_2_v1.1_18-11-2024 N4 Standpipes.docx
58.3 KB · Form / Declaration / Certificate
Vol B - Form of Tender & Schedule.pdf
432.6 KB · Form / Declaration / Certificate
Vol A - Book 2 - Drawings.pdf
1.7 MB · Drawing / Plan / Layout
07. Tender Docs - ETenders.zip
7.9 MB · Other
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
31.3 KB · Appendix / Annex
PHSP - N4 Standpipe Removal.pdf
1.4 MB · Appendix / Annex
Original notice text
The removal of 53 no. groundwater monitoring installations for the N4 Carrick-on-Shannon Bypass Traffic Management Project