Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Public realm improvement works at Market Square, Ballinakill Co. Laois
Closed Construction & Civil Engineering Works Open

Public realm improvement works at Market Square, Ballinakill Co. Laois

Deadline

18 May

Public realm improvement works at Market Square in Ballinakill, Laois.

SME fit: Medium Bid effort: Medium 📍 Laois

Public realm improvement works at Market Square in Ballinakill, Laois.

Bidder profile

Firms with experience in public realm projects and compliance with public procurement standards.

Risks & flags

  • Information asymmetry
  • Compliance risks
  • Timeline compression

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Laois County Council
Title Public realm improvement works at Market Square, Ballinakill Co. Laois
CPV / category VERIFIED PHRASES (deterministic regex extract from the documents — treat as authoritative for numerical claims) / Construction & Civil Engineering
Estimated value €not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-18T14:00:00+00:00
Go-live / start not stated

2. Scope of Work

This procurement covered the supply scope described in the tender pack for Public realm improvement works at Market Square, Ballinakill Co. Laois. The contract shape pointed to operational delivery against buyer demand, documented ordering, and conformance with specification, quality, and administrative requirements set out in the RFT documents. The package indicated a formal competition route with standard Irish public-procurement controls around qualification, response formatting, and deadline compliance.

  • Contract title and category indicate supply activity for Construction & Civil Engineering under buyer workflows in Laois County Council.
  • Submission package must align with the RFT structure published through the buyer's procurement channel.
  • Day-to-day obligations include order fulfilment, documentation, and compliance evidence for the awarded framework or contract lot.
  • Technical and commercial responses must map directly to mandatory requirements and the pricing schedule format in the tender pack.
  • Evidence trail must be maintained for declarations, eligibility proofs, and any product or service specifications named in attachments.
  • Numerical obligations surfaced in the verified extract: ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10; 4 Maximum levels of excess for  insurance of the Works and goods and materials for the Works €  public liability €6,5009  employer’s liability €6,50010 7 If no percentage specified, 10% applie; Insurance Type Level required if successful Level in Place Details of Any Excess Renewal Date Employers Liability €13,000,000 € Public Liability €6,500,000 € Product Liability €6,500,000 € Professional Indemnity N/A

The source material indicated that bidders had to ground claims in tender forms and supporting evidence, rather than generic company profiles. Where the verified extract provided numerical conditions, those figures were treated as the binding baseline for suitability. Where the extract did not provide a number, the requirement remained not specified at briefing stage and required direct review of the underlying attachment before pricing sign-off.

3. Background & buyer context

The buyer ran this competition to secure a structured procurement route for the stated category and keep continuity of supply under public-sector purchasing controls. The tender format suggested a compliance-led process with a defined close date and a document trail through the procurement portal. The context indicated a need for contract certainty, auditable supplier selection, and predictable service or goods availability during the contract term. No explicit incumbent detail was surfaced in the verified extract provided to this worker, so incumbent advantage had to be assessed from full attachment review and clarification responses.

4. Eligibility & selection criteria

  • Turnover requirement — turnover, or €5,000.
  • Insurance
  • Public Liability — €6,5009
  • Product Liability — €6,500,000
  • Professional Indemnity — €5,000.
  • Certifications — not specified for this tender
  • Past experience — not specified for this tender
  • Personnel — not specified for this tender
  • Geographic / facility constraints — not specified for this tender

Binding numerical extract used for this section: ) Minimum indemnity limit for employer’s liability insurance €13,000,000 for any one event 10; 4 Maximum levels of excess for  insurance of the Works and goods and materials for the Works €  public liability €6,5009  employer’s liability €6,50010 7 If no percentage specified, 10% applie; Insurance Type Level required if successful Level in Place Details of Any Excess Renewal Date Employers Liability €13,000,000 € Public Liability €6,500,000 € Product Liability €6,500,000 € Professional Indemnity N/A

5. Award criteria & scoring

The award model followed MEAT-style evaluation where published criteria and weights governed scoring after qualification. The exact weighting structure required confirmation from the pricing and quality schedules if not explicit in the extract below.

Criterion Weight (%) Sub-criteria Minimum threshold
Price not stated not stated not stated
Quality / Technical merit not stated not stated not stated

Price/quality split: not stated.

6. Submission requirements

  • Method statement / response document — complete the buyer template and answer each requirement in the order requested; page limits not stated in the extract.
  • CVs — provide role-based CVs where requested; page count not stated.
  • Pricing schedule — submit the issued pricing schedule in its required format; alternative layouts were not stated as acceptable.
  • Case studies — number and value bands not stated in the extract.
  • Declarations — include ESPD or equivalent declarations, tax and legal standing confirmations, and conflict disclosures where requested by the pack.
  • Mandatory site visit — not stated in the extract.
  • Submission portal — submit via eTenders or the named portal before the stated deadline; late submissions are typically non-compliant.

7. Key dates & process

Milestone Date / timing
RFT issued not stated
Clarification deadline not stated
Mandatory site visit not stated
Tender deadline (date + time) 2026-05-18T14:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract term and extension mechanics were not fully stated in the extracted metadata, so bidders had to read the form of contract and schedules for binding duration language. Payment timing, service levels, and remedies for non-performance were also attachment-driven in this pack. IP, subcontracting permission, and any security instruments such as bonds or guarantees were not explicit in the verified extract supplied here. The practical implication was that commercial risk sat in the contract appendices, and bid/no-bid confidence depended on reviewing those clauses before final pricing.

9. Risks, red flags & unusuals

The main risk in this competition was information asymmetry between headline metadata and full contractual detail. Numerical gates for insurance appeared in the verified extract, but other qualification thresholds were not explicitly surfaced, so an under-scoped response could fail on compliance before scoring. Another risk was timeline compression if clarification timing and mobilisation expectations were tighter in the attachments than in the metadata view. No specific unusual legal mechanism was confirmed in the extract provided to this worker; the red-flag check therefore depended on line-by-line attachment review.

10. SME fit assessment

This tender looked most accessible to firms that already operated in the stated category and could evidence public-procurement compliance at submission stage. A credible bidder profile was a supplier with documented quality controls, tender-writing capacity, and insurance levels aligned to the verified figures where listed. Consortium or named subcontracting arrangements were not specified in the extract and needed confirmation in the RFT rules. Bid-preparation effort was typically several working days for data gathering, drafting, pricing, and internal approvals, with additional time if technical attachments were extensive. Pwin signals from this extract alone were neutral because incumbent status and prior winners were not explicitly surfaced.

11. Where to dig deeper

  • Source RFT file(s): FTS-6.pdf, ITTW4_Invitation_to_Tender_Letter.pdf
  • eTenders CFT ID: not stated
  • Clarification contact / portal: eTenders clarification portal
  • Priority attachments: FTS-6.pdf, ITTW4_Invitation_to_Tender_Letter.pdf, ITTW4_Open_Procedure_Short_Form_.pdf

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Professional indemnity insurance

€5,000

Scoring

Most Economically Advantageous Tender

Documents (51)

PDF

26013 Design report Ballinakill Town Square.pdf

338.6 KB · Specification

PDF

26013 Electrical calculations Ballinakill Town Square.pdf

96.4 KB · Specification

PDF

26013 Light level dimmed output Ballinakill Town Square.pdf

221.8 KB · Specification

PDF

26013 Light level full output Ballinakill Town Square.pdf

204.5 KB · Specification

PDF

GENERAL SPECIFICATION.pdf

760.1 KB · Specification

PDF

HC5 SC5 Specs.pdf

1.9 MB · Specification

PDF

FTS-6.pdf

267.6 KB · RFT / Invitation to Tender

PDF

ITTW4_Invitation_to_Tender_Letter.pdf

100.8 KB · RFT / Invitation to Tender

PDF

ITTW4_Open_Procedure_Short_Form_.pdf

548.8 KB · RFT / Invitation to Tender

PDF

Vol A- Request-for-Tender.pdf

961.9 KB · RFT / Invitation to Tender

PDF

26013 Energy consumption Ballinakill Town Square.pdf

72.1 KB · Pricing / BOQ / Schedule of Rates

PDF

26013-3 Isolux lines Ballinakill Market Sq.pdf

786.6 KB · Pricing / BOQ / Schedule of Rates

PDF

Ballinakill-Planting schedule.pdf

232.0 KB · Pricing / BOQ / Schedule of Rates

PDF

Vol C- Pricing Document.pdf

647.4 KB · Pricing / BOQ / Schedule of Rates

XLSX

Vol C- Pricing Document.xlsx

3.1 MB · Pricing / BOQ / Schedule of Rates

PDF

3.4.1-HS-Works-Contractor.pdf

382.8 KB · Contract / Agreement / Terms

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

52.1 KB · Contract / Agreement / Terms

PDF

MF_1.22_Project_Supervisor_09-04-2020 (2).pdf

338.0 KB · Contract / Agreement / Terms

PDF

MF_1.23_Rates_of_Pay_09-04-2020 (1).pdf

274.7 KB · Contract / Agreement / Terms

PDF

PW-CF6_Contract_v1.15_25-11-2025.pdf

431.0 KB · Contract / Agreement / Terms

PDF

3.4.2-HS-PSCS.pdf

435.6 KB · Form / Declaration / Certificate

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

44.0 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

41.1 KB · Form / Declaration / Certificate

PDF

Appendix_A_Applicants_Self-Declaration__Regulation_57.pdf

395.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution (1).docx

27.6 KB · Form / Declaration / Certificate

PDF

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.pdf

266.3 KB · Form / Declaration / Certificate

PDF

102-Site layout 3D view.pdf

2.8 MB · Drawing / Plan / Layout

PDF

103- Elevations.pdf

2.9 MB · Drawing / Plan / Layout

PDF

104-Site layout plan view.pdf

3.3 MB · Drawing / Plan / Layout

PDF

105- Sections.pdf

2.4 MB · Drawing / Plan / Layout

PDF

106-Drainage -Rain garden layout.pdf

6.2 MB · Drawing / Plan / Layout

PDF

107-Site Clearance.pdf

2.3 MB · Drawing / Plan / Layout

PDF

108-Site Clearance 3D view.pdf

2.8 MB · Drawing / Plan / Layout

PDF

109-Landscaping.pdf

4.4 MB · Drawing / Plan / Layout

PDF

251031 Portlaoise MD - Rain Garden Design - A3 .pdf

378.8 KB · Drawing / Plan / Layout

PDF

26013-1 Lighting layout Ballinakill Market Sq.pdf

656.8 KB · Drawing / Plan / Layout

PDF

26013-2 Electrical schematic Ballinakill Market Sq.pdf

471.2 KB · Drawing / Plan / Layout

PDF

NTA-TCD-1100-012.pdf

212.0 KB · Drawing / Plan / Layout

PDF

NTA-TCD-1100-017.pdf

331.5 KB · Drawing / Plan / Layout

PDF

CC-SPW-01100-03.pdf

876.9 KB · Other

PDF

DRA -(TV25LSO1)Public realm improvement works at Market Square, Ballinakill Co. Laois.pdf

302.3 KB · Other

PDF

Preliminary S&H Plan.pdf

888.9 KB · Other

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

33.0 KB · Appendix / Annex

PDF

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.pdf

321.6 KB · Appendix / Annex

PDF

CC-SCD-01101-02 (1).pdf

393.7 KB

PDF

QW2_Part_1.pdf

702.3 KB · ESPD (European Single Procurement Document)

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

192.3 KB · ESPD (European Single Procurement Document)

PDF

QW_Part_2.pdf

453.8 KB · Tender Response Template

DOCX

QW_Part_2_v1.1_18-11-2024.docx

58.5 KB · Tender Response Template

DOCX

Vol C-TRD.docx

85.2 KB · Tender Response Template

PDF

Vol C-TRD.pdf

427.3 KB · Tender Response Template

Original notice text

The works is compiled of three separate sections within the contract, Public Realm, SuDS , Active Travel. The Public Realm works involve the site clearance of an existing market square including concrete paving and concrete footpath, concrete road kerbing , street furniture, public Lighting trees and road signage, road marking, parking area while protect the existing structures within the square. The construction of new road kerbing, pedestrian kerbing and three new paved area, the installation of new planted and green area, the installation of new street furniture and Public Lighting, road signage, road marking and new car parking pavement. The SuDS works involve construction of new SuDS drainage and rain garden and associated infrastructure including gullies, kerbing, Aco-channels, pipework, manholes, drainage stone, growing filter medium and planting. The Active travel work involves the site clearance of the existing paved area and road kerbing. The construction of Bus stop including new kerbing and paved area and new new signage and street furniture. The contractor is also required to produce a video and photographic record of the project.

AI analysis updated 2 months, 3 weeks ago

Bid ↗
Details

Deadline

18 May

View on eTenders ↗

Location

Market Square, Ballinakill, Co. Laois.

Procedure

Open

eTenders ID

7923736

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender