26.003 St. Oliver's CC – EWS 2026 – Building Management System, Heating, Cold Water Services and Roof Replacement Project
Value
€200k
Deadline
18 Aug
18 Aug 2026
Value
€200k
Deadline
18 Aug
Tender for building management system, heating, cold water services, and roof replacement at St. Oliver's Community College.
Remedial works and installations at St. Oliver's Community College including BMS and roof replacement.
Bidder profile
Small to medium-sized enterprises with experience in mechanical and electrical services and building management systems.
Risks & flags
- Value vs. Insurance requirements
- Lack of detailed award criteria
- Limited scope detail
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Louth and Meath Education and Training Board |
|---|---|
| Title | 26.003 St. Oliver's CC – EWS 2026 – Building Management System, Heating, Cold Water Services and Roof Replacement Project |
| CPV / category | not stated |
| Estimated value | €200,327.50 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-08-18T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This tender seeks a contractor for remedial works to an existing duct extract unit, and the installation of new ductwork, associated builder's works, and electrical works at St. Oliver's Community College. The project encompasses building management systems, heating, cold water services, and roof replacement.
The constituent activities and requirements include:
- Remedial Works: Addressing existing duct extract unit issues.
- New Ductwork Installation: Installation of new ductwork systems.
- Associated Builder's Works: Construction and modification tasks related to the mechanical and electrical installations.
- Electrical Works: Installation and integration of electrical systems supporting the mechanical services.
- Building Management System (BMS): Installation and commissioning of a BMS to control and monitor building services. This includes ensuring the BMS runs on the duty pump for a minimum of 15 minutes on shutdown.
- Heating Services: Installation and integration of heating systems. Specific components mentioned include LPHW Twin Head Circulation Pumps (P2, P3) and magnetic filtration units.
- Cold Water Services: Installation and integration of cold water systems.
- Roof Replacement: Works related to the replacement of roofing elements.
- Compliance: Adherence to relevant standards including IS EN 62305, IS EN ISO 10012, IS EN 61082-1, EN 12756, EN 1092-2, ISO 7005-2, EN 1254-2, EN60730-1, EN55014-1, EN55014-2, IS EN 14154, IS EN 10217-7, IS EN 10255, IS EN 1092-1, and IS EN 10226.
- Documentation: Preparation of electrical record drawings in accordance with IS EN 61082-1. Provision of final manuals one week prior to Substantial Completion. Preparation of planned preventative maintenance schedules for 12 months from substantial completion.
- Testing and Commissioning: Coil testing to a minimum of 1 bar. Demonstration procedures to be carried out not less than 2 weeks before substantial completion. Include for 6 visits during the first 2 months of commissioning.
- Materials: Use of mineral fibre, minimum 50mm thick, or CFC-free rigid polyurethane foam, minimum 25mm thick. Seals designed for a minimum of 10 years. Stainless steel pipework to IS EN 10217-7. Carbon steel pipes to IS EN 10255. Flanges to IS EN 1092-1 PN16. Non-metallic flat for flanges to IS EN 1092-1. Screwed joints to IS EN 10226.
- Site Management: Securing the site, keeping it in good order, and ensuring the safety of persons on site. Minimising nuisance or inconvenience to the public.
- Project Duration: The project is expected to be completed within 6 months after termination, with potential for a 12-month extension under specific conditions.
3. Background & buyer context
This procurement is being conducted by Louth and Meath Education and Training Board (ETB) for works at St. Oliver's Community College. The project, identified as "EWS 2026," involves essential building services and roof replacement. The tender documentation references the "Short Public Works Contract PW-CF6 v1.15 25-11-2025," indicating adherence to standard public sector contracting procedures in Ireland. The project appears to be part of ongoing maintenance and upgrade programs for educational facilities managed by the ETB. The specified contract conditions are issued by the Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability Insurance: Minimum level of cover of €6,500,000.
- Employer's Liability Insurance: Minimum level of cover of €13,000,000.
- Certifications:
- Must be a member of the Construction Industry Pension/Sick Pay Scheme.
- Must comply with Safety, Health and Welfare at Work Act 2013 and the Safety, Health and Welfare at Work (Construction) Regulations S.I. 504 of 2006.
- Must hold a current C2 tax clearance certificate.
- Past experience: Not specified for this tender.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria are not explicitly detailed with scoring percentages in the provided extract. However, the tender documentation states that bidders must meet the minimum standards outlined in the "DoES Suitability Declaration for Small Works" to avoid exclusion at the award stage. The contract will be awarded based on the "Short Public Works Contract PW-CF6 v1.15 25-11-2025," which implies a standard evaluation process for public works tenders. The primary criteria will likely include compliance with technical specifications, pricing, and adherence to contractual terms.
6. Submission requirements
Tenderers are required to submit the following completed documents:
- Form of Tender: Must be correctly executed with signatures from a Principal or Director.
- Pricing Document & Schedules: Must be completed in the format prescribed.
- Declaration of Suitability for Contractors for Small Works: Tenderers must meet the minimum standards stated within this declaration.
- Volume B & C Documents: These volumes, containing the Form of Tender and Pricing Document, must be returned.
- Tax Clearance: A current C2 tax clearance certificate is required.
- Insurance: Proof of current public and employer's liability insurance.
- Site Visit: Candidates may visit the site by prior arrangement with the school.
- Submission Method: Tenders submitted by post or email will be deemed invalid. Tenders must be submitted via the eTenders portal.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | As Per Etenders Notice |
| Clarification deadline | Not specified |
| Mandatory site visit | Not specified (optional by arrangement) |
| Tender deadline | 2026-08-18T11:00:00+00:00 |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
The contract will be governed by the "Short Public Works Contract PW-CF6 v1.15 25-11-2025." Key terms include:
- Contract Term: Not explicitly stated, but the "Time for Completion" is defined.
- Extension of Time: The Time for Completion may be extended for Compensation Events, loss or damage to the Works, weather events, strikes, acts of public authority, or failure of other parties.
- Payment Terms: Interim payments on account, a percentage upon substantial completion, and the balance after the Defects Certificate. Payment claims require a notice, followed by the Employer's Representative's certificate, and then an invoice. Payment is due within the period stated in the Schedule. Late payments incur interest as per the European Communities (Late Payment in Commercial Transactions) Regulations 2012.
- Liquidated Damages: Apply if the Works are not substantially completed within the Time for Completion, at the rate specified in the Schedule.
- Termination: Not detailed in the provided extract, beyond potential termination due to prolonged suspension of works.
- IP Ownership: Not specified.
- Sub-contracting: The Contractor may assign the contract or any part of it only with the Employer's consent. Sub-processors for Personal Data require prior written notice and potential objection from the Employer.
- Performance Bond: Required if stated in the Schedule, to be provided within 7 days of acceptance.
9. Risks, red flags & unusuals
- Value vs. Insurance: The estimated value of €200,327.50 is significantly lower than the mandatory insurance cover levels (€6.5m PL, €13m EL). This is a common requirement in public works but can be a barrier for very small businesses.
- "Small Works" Declaration: The explicit requirement to meet minimum standards in the "DoES Suitability Declaration for Small Works" suggests a focus on specific contractor capabilities for this project size, potentially excluding larger firms not accustomed to such declarations.
- Lack of Detailed Award Criteria: The absence of explicit scoring weights for award criteria means bidders must infer the relative importance of technical versus price aspects, relying on the standard public works contract framework.
- Limited Scope Detail: While the title mentions BMS, heating, cold water, and roof replacement, the detailed scope of work is primarily described through technical specifications and drawings (referenced but not provided here), requiring bidders to thoroughly review these documents.
10. SME fit assessment
This tender is structured for Small Works and requires specific compliance with the "DoES Suitability Declaration for Small Works."
- Credible Bidders: Small to medium-sized enterprises (SMEs) with demonstrable experience in mechanical and electrical services, building management systems, and general building works are the most likely candidates. Firms must possess the required insurance levels and be able to provide a C2 tax clearance certificate and be members of the Construction Industry Pension/Sick Pay Scheme.
- Consortium/Sub-contracting: The contract conditions state the Contractor may not assign the contract or any part of it without the Employer's consent. While not explicitly forbidding sub-contracting, it implies a primary contractor will be responsible for the entire scope. Consortium bids are not explicitly mentioned but would likely require careful structuring to meet the suitability declaration requirements.
- Indicative Bid-Prep Effort: Given the need to review detailed specifications, prepare a pricing document, and complete the suitability declaration, bid preparation could require 5-10 working days for an experienced firm.
- Pwin Signal: The "Small Works" designation and the specific suitability declaration suggest the tender is genuinely open to SMEs. The absence of an incumbent mention or specific past winners implies a competitive process, though adherence to the suitability declaration is a critical gate.
11. Where to dig deeper
- Source RFT Filename(s): Invitation to Tender Letter 3279.pdf
- eTenders CFT ID: Not specified in the provided text.
- Contact Email / Clarification Portal: [email protected] (for Semple & McKillop Ltd)
- Most Important Attachments:
- Volume A – Works Requirements, Prelim H&S Plan, Document Specifications & Drawings
- Volume B – Form of Tender & Schedules
- Volume C – Pricing Document
- DoES Suitability Declaration for Small Works
Can you bid?
Required certifications
- Construction Industry Pension/Sick Pay Scheme
- C2 tax clearance certificate
Public liability insurance
€6,500,000
Named standards / methodologies
Documents (25)
Vol A.2.3 Mech Spec Part 1 - Project Particulars_3279.pdf
726.6 KB · Specification
Vol A.2.3 Mech Spec Part 2 - General Responsibilities_3279.pdf
418.2 KB · Specification
Vol A.2.3 Mech Spec Part 3 - Standard Clauses_3279.pdf
1.2 MB · Specification
Vol A.2.3 Mech Spec Part 4 - Equipment Schedules_3279.pdf
480.2 KB · Specification
Volume A - Works Requirements.zip
11.3 MB · Specification
Volume A Works Requirements 3279.pdf
346.2 KB · Specification
Invitation to Tender Letter 3279.pdf
323.3 KB · RFT / Invitation to Tender
Volume C - Pricing Document.zip
246.9 KB · Pricing / BOQ / Schedule of Rates
Volume C Pricing Document 3279.pdf
246.6 KB · Pricing / BOQ / Schedule of Rates
PW-CF6_Contract_v1.15_25-11-2025.pdf
431.0 KB · Contract / Agreement / Terms
C1 -PW-CF6 Rates of Pay and Conditions of Employment Certificate-3279.pdf
84.3 KB · Form / Declaration / Certificate
Declaration of suitability_small_works-3279.pdf
178.5 KB · Form / Declaration / Certificate
Volume B - Form of Tender.zip
161.4 KB · Form / Declaration / Certificate
Volume B Form of Tender FTS-6_v1.7_06-11-2025 3279.pdf
161.1 KB · Form / Declaration / Certificate
21-43_TD-0100-Rev1_Existing Plans, Sections & Site Plan.pdf
614.9 KB · Drawing / Plan / Layout
3279-SMK-ZZ-LL-DR-M-51 - Plant Room Schematics.pdf
342.2 KB · Drawing / Plan / Layout
3279-SMK-ZZ-LL-DR-M-53 - Plumb Schematic.pdf
477.2 KB · Drawing / Plan / Layout
3279-SMK-ZZ-LL-DR-M-56 - Heating.pdf
967.1 KB · Drawing / Plan / Layout
3279-SMK-ZZ-LL-DR-M-59_BMS.pdf
512.3 KB · Drawing / Plan / Layout
3279-SMK-ZZ-LL-DR-M-80 - Builders Works.pdf
1.3 MB · Drawing / Plan / Layout
21-43_TD-1000-Rev2_Proposed Plans & Section.pdf
360.1 KB
21-43_TD-6000-Rev1_Detail Sheet 1.pdf
240.0 KB
C2 -PW-CF6 Appointment of Project Supervisor-3279.pdf
119.4 KB
Instruction to Tenderers 3279.pdf
270.3 KB
Preliminary Safety & Health Plan - 3279.pdf
2.7 MB
Original notice text
The works include the upgrade and replacement of key mechanical, electrical, and building fabric elements within the school to improve efficiency, reliability, and safety. A new Building Management System (BMS) is to be installed to provide enhanced monitoring and control of the heating and mechanical services, allowing improved energy management and operational efficiency. Existing heating circuit pumps to be replaced with new high-efficiency pumps to improve system performance and reliability. The cold water services (CWS) to be upgraded through the installation of a new CWS storage tank and associated booster pump set, ensuring improved water pressure, storage capacity, and compliance with current standards. Thermostatic radiator valves (TRVs) to be installed on selected radiators throughout the school to allow local temperature control, improve occupant comfort, and reduce energy consumption. Builders’ works includes the removal of the existing steel hopper lid roof and the installation of a new flat roof system, incorporating modern waterproofing materials to improve weather resistance, durability, and longevity of the structure.
AI analysis updated 1 month ago
Value
€200k
Deadline
18 Aug
Location
St. Oliver's Community College, location not specified.
Procedure
Open
eTenders ID
8727812
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender