Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Oberstown Small Capital Works Framework
Closed Construction & Civil Engineering Works Restricted

Oberstown Small Capital Works Framework

Value

€9.0m

Deadline

18 May

Framework for small capital works at Oberstown Children Detention Campus

SME fit: Medium Bid effort: Medium 📍 Dublin

Framework for small capital works at Oberstown Children Detention Campus

Bidder profile

This tender is suitable for SMEs or mid-market contractors with strong compliance and execution capabilities.

Risks & flags

  • Compliance risks
  • Insurance thresholds
  • Submission deadlines

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Oberstown Children Detention Campus
Title Oberstown Small Capital Works Framework
CPV / category Construction & Civil Engineering
Estimated value €9,000,000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-18T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought construction & civil engineering under the title "Oberstown Small Capital Works Framework" for Oberstown Children Detention Campus. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included 2%, €5,000, € 6,500,000, € 10,000, € 13,000,000, €200,000, €1,000,000, €15.

Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate. Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect. Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing. Mechanical and electrical systems replacement/upgrade works with contract value between €200,000 and €1,000,000 in live environment. Building fabric upgrade/replacement works (facades and roofs) with contract value between €200,000 and €1,000,000 in live environment. New build minor works project with contract value between €200,000 and €1,000,000 in live environment.

3. Background & buyer context

The process was run by Oberstown Children Detention Campus with deadline recorded as 2026-05-18T11:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing; Mechanical and electrical systems replacement/upgrade works with contract value between €200,000 and €1,000,000 in live environment; Building fabric upgrade/replacement works (facades and roofs) with contract value between €200,000 and €1,000,000 in live environment. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value €9,000,000.00. Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing; Mechanical and electrical systems replacement/upgrade works with contract value between €200,000 and €1,000,000 in live environment; Building fabric upgrade/replacement works (facades and roofs) with contract value between €200,000 and €1,000,000 in live environment; New build minor works project with contract value between €200,000 and €1,000,000 in live environment. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-18T11:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: 44774cbf-c6b9-4cd2-b186-e90001746ee2.

Can you bid?

Required certifications

  • ISO 9001
  • Safe-T-Cert

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (8)

DOCX

07 Oberstown CW Tender - 3.4.1 HS Works Contractor_Issue 1.docx

55.3 KB · Contract / Agreement / Terms

DOCX

03 Oberstown CW Tender - Appendix 1 Forms of Letters of Undertaking Declarations_Issue 1.docx

91.8 KB · Form / Declaration / Certificate

DOCX

04 Oberstown CW tender - Appendix A Applicants Self Declaration re Regulation 57_Issue 1.docx

40.7 KB · Form / Declaration / Certificate

DOCX

06 Oberstown CW tender - Appendix B2 Certificate of Satisfactory Project Execution_Issue 1.docx

28.6 KB · Form / Declaration / Certificate

DOCX

01 Oberstown CW tender - SAQ Part 1_Issue 1.docx

230.1 KB · ESPD (European Single Procurement Document)

DOCX

02 Oberstown CW tender - SAQ Part 2_Issue 1.docx

59.0 KB · Tender Response Template

DOCX

05 Oberstown CW tender - Appendix B1 List of Previous Works Projects with CEE_Issue 1.docx

33.4 KB · Appendix / Annex

DOCX

08 Oberstown CW Tender - Appendix 2 CV Reference Data Sheet.docx

60.4 KB · Appendix / Annex

Original notice text

This is a two stage tender competition which intends to establish a multi provider Framework Agreement between Oberstown Children Detention Campus and the successful Candidates for procuring Minor Capital Works. The first stage is a Suitability Assessment Questionnaire (SAQ) to shortlist ten (10) Candidates who will be invited to tender (provided ten Applicants submit compliant PQQ Responses that meet the minimum requirements). If there is more than one Applicant ranked at tenth place, all the tenth placed Applicants will be invited to tender. The second stage will be a tender competition to appoint a maximum of six (6) Tenderers to the Framework (provided six Tenders are compliant and meet the minimum requirements). If there is more than one Tenderer ranked at sixth place, all the sixth placed Tenderers will be appointed to the framework. The scope of the Capital Works Framework will cover a wide variety of minor projects relating to all Mechanical, Electrical, Building Fabrics, Infrastructure, Fire Safety and other assets on the campus. A non-exhaustive list of possible works: • Minor building extensions • Demolition works • Refurbishment / Renovations / Upgrades of existing buildings (exterior and interior works) • Office fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Control Room fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Upgrade / replacement of critical Mechanical and Electrical systems that serve our office buildings and our critical assets such as Data Centres, Control Room and Disaster Recovery Sites • Building fabric upgrade and replacement (facades and roofs) • Life Safety Systems i.e., emergency lightening and fire safety • Electrical Systems i.e Specialist Security System • Energy Systems installations and upgrades (LED upgrades, solar panel and heat pump installations) • Site infrastructure works such as retaining walls, underground utilities, roads, pavements, compounds and security fencing • Hard and soft Landscaping • The role of Project Supervisor Construction Stage and Contractor, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope • In some cases, role of Designer, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope. For example, where: (a)Specialist permanent works design may be required in the case of electrical, mechanical, structural or architectural; and (b) Where temporary works design may be required such as shuttering, traffic management, temporary electrical systems, propping, supporting, specialist scaffolding etc. The term of the framework will be 3 years, with options to renew with 1 + 1 years, if deemed appropriate.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Value

€9.0m

Deadline

18 May

View on eTenders ↗

Location

Oberstown Children Detention Campus, Dublin

Procedure

Restricted

Clarification

18 May 2026

eTenders ID

7905400

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender