Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Engineering Technical Consultancy Services for the Thurles Inner Relief Road
Closed Open

Engineering Technical Consultancy Services for the Thurles Inner Relief Road

Deadline

03 Sep

Engineering technical consultancy services for the Thurles Inner Relief Road (Tipperary). Scope covers design development, project management, BIM coordination and site supervision over a 50-month contract period. Preliminary design, statutory planning and land acquisition are already complete.

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Tipperary County Council
Title Engineering Technical Consultancy Services for the Thurles Inner Relief Road
CPV / category 71300000-1 (Engineering services)
Estimated value Not disclosed
Per-year Not stated
Procedure type Open Procedure
Lots Not stated
Location Thurles, Co. Tipperary, Ireland
Contract length Not stated
Submission deadline 2026-08-13T15:00:00+00:00
Go-live / start Not stated

2. Scope of Work

This tender seeks engineering technical consultancy services for the design and development of the Thurles Inner Relief Road. The scope encompasses a comprehensive range of services required to bring the project from its current conceptual stage through to detailed design, preparation for construction, and potentially construction supervision.

The core activities for the appointed consultant will include:

  • Detailed Design: Developing detailed engineering designs for the road, including geometric design, pavement design, drainage, and associated structures. This will involve adherence to relevant standards such as the Specification for Roadworks.
  • BIM Implementation: Demonstrating experience with the implementation of ISO 19650 standards for Building Information Modelling (BIM) processes on engineering projects.
  • Ground Investigation: Conducting and interpreting ground investigations, including fieldwork and laboratory testing, in accordance with BS EN 1997-2:2007 and other relevant standards. This will involve boreholes, trial pits, and dynamic probes.
  • Structural Design: Designing any necessary bridge structures or other civil engineering structures associated with the relief road. Preliminary drawings indicate elements such as pile caps, abutments, and girders.
  • Environmental Considerations: Addressing environmental aspects, including potential impacts on Natura 2000 sites within a 15km radius and recording of bat species.
  • Project Supervisor Design Process (PSDP): Performing the role of PSDP, ensuring compliance with health and safety regulations during the design phase.
  • Cost Engineering/Quantity Surveying: Providing cost estimates and quantity surveying services, with a focus on budgetary control and accurate estimating.
  • Technical Documentation: Producing all necessary technical documentation, drawings, specifications, and reports required for tender and construction.
  • Coordination and Cooperation: Ensuring effective coordination with the client and other parties, and cooperating to minimise delays and problems.
  • Contract Management: Managing the consultancy services in accordance with the contract terms, including progress reporting, milestone achievement, and communication protocols.

The project area is approximately 66.50 hectares, with a proposed road length of 1,260 metres east-west. The construction programme is anticipated to be of the order of 12-15 months.

3. Background & buyer context

This procurement by Tipperary County Council is for essential technical consultancy services to advance the Thurles Inner Relief Road project. The project aims to improve traffic flow and connectivity within Thurles town. While specific policy drivers are not detailed, such infrastructure projects typically align with national and regional development plans focused on enhancing transport networks and supporting economic growth. The tender documents indicate preliminary design work has been undertaken, including site investigations and conceptual drawings, suggesting a move towards detailed design and procurement readiness. The incumbent consultant, if any, is not explicitly named in the provided metadata.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Professional Indemnity Insurance: Minimum cover of €3,000,000 on each and every claim basis, and €3,500,000 on an annual aggregate basis. Maximum excess €10,000 for property only.
  • Public Liability Insurance: Minimum cover of €6,500,000 in respect of any one accident. Maximum excess €10,000 for property only.
  • Employer's Liability Insurance: Minimum cover of €13,000,000 in respect of any one accident.
  • Certifications: Not specified for this tender.
  • Past experience:
  • At least one road project completed in the last 10 years, valued at a minimum of €20M ex VAT.
  • Experience in the design of public road projects with a minimum value of €10M.
  • Experience in the design for construction of a single bridge with a minimum value of €5M.
  • Experience with the Specification for Roadworks, with at least one completed road scheme having a value of €10M.
  • Experience with public roads projects with a minimum value of €10M ex VAT.
  • Experience with projects valued at a minimum of €5M ex VAT.
  • Experience with a public road of minimum construction value of €10,000,000 ex VAT.
  • Experience with projects valued at €3,000,000 ex VAT and having been subject to a Category 3 check in accordance with TII.
  • Experience with Project Appraisal Reports for Minor Projects (€5m to €20m).
  • Demonstrated experience of the implementation of ISO 19650, or equivalent, on an engineering project.
  • Personnel:
  • Project Director: Minimum 15 years post-graduate experience.
  • Project Manager: Minimum 10 years post-graduate experience, with at least 5 years in the role of Project Manager.
  • PSDP Co-Ordinator: Minimum 10 years post-qualification experience.
  • Senior Engineer: Minimum Level 8 NFQ qualification in civil/structural engineering.
  • Senior Structural Engineer: Minimum Level 8 NFQ qualification in civil or structural engineering.
  • Geotechnical Engineer: Minimum Level 8 NFQ qualification in civil or geotechnical engineering, and be a Chartered Engineer with a minimum of 10 years post-qualification experience.
  • Cost Engineer/Quantity Surveyor: Minimum Level 8 NFQ qualification in a relevant field.
  • BIM Manager: Minimum Level 8 NFQ qualification in engineering or a related discipline, with a minimum of 5 years experience in BIM management and control.
  • Geographic / facility constraints: Services to be performed within a 15km radius of the scheme.

5. Award criteria & scoring

The award will be based on the Most Economically Advantageous Tender (MEAT), with a split between price and quality. The specific weighting and scoring methodology are not detailed in the provided extract, but typically include:

Criterion Weight (%) Sub-criteria Pass/Fail Thresholds
Quality Not stated Not stated Not stated
Price Not stated Not stated Not stated

A minimum scoring threshold per criterion or overall may be applied.

6. Submission requirements

Bidders are required to submit the following:

  • Method statement / response document: Not specified in terms of format or page limits.
  • CVs: For named key personnel, detailing their qualifications and experience.
  • Pricing schedule: Not specified in terms of format.
  • Case studies: A list of previous projects with Certificates of Satisfactory Execution. Up to 28 projects can be listed.
  • Declarations: Not specified, but typically include ESPD, Bona Fides, Tax Clearance, and Conflict of Interest declarations.
  • Mandatory site visit: Not specified.
  • Submission portal: eTenders.

7. Key dates & process

Event Date/Time
RFT issued Not stated
Clarification deadline Not stated
Mandatory site visit Not stated
Tender deadline 2026-08-13T15:00:00+00:00
Expected award Not stated
Contract start Not stated
Go-live / mobilisation Not stated

8. Contract terms that matter

  • Term + extension: The contract is structured into Stages and Sub-Stages, with permissions to start granted by the Client. Performance Periods are scheduled for each Stage.
  • Payment terms: Payment of Stage Fees is due within 30 days of a valid invoice, provided a current tax clearance certificate is held. A percentage of the total fee is applied to the estimated project costs.
  • Key SLAs/KPIs: Milestones must be met within each Stage. Performance is evaluated based on skill, care, diligence, efficiency, and professional conduct.
  • Liquidated damages or penalty regimes: Not explicitly detailed, but the contract includes provisions for budgetary control where tendered amounts exceed estimates by an 'Excess Percentage'.
  • Termination clauses: The Client can terminate for cause, insolvency, or at will (with 14-28 days' notice). Either party can terminate for substantial breach. Termination for cause or insolvency entitles the terminating party to damages. Termination at will by the Client may result in a scheduled payment to the Consultant.
  • IP ownership: The Consultant grants the Client a royalty-free, perpetual, non-exclusive, irrevocable licence to use Consultant's Documents. An absolute assignment of rights is possible for specific documents as scheduled.
  • Sub-contracting rules: Sub-contracting requires Client agreement. The Consultant is responsible for sub-consultant acts and omissions. Sub-consultants must provide collateral warranties.
  • Parent-company guarantee or bond requirements: Not specified.

9. Risks, red flags & unusuals

  • Budgetary Control Clause: Clause 12 introduces a "Budgetary Control" mechanism. If the tendered construction amount exceeds the last approved estimate by an "Excess Percentage," the Consultant's fee for the design stage may be reduced unless they can establish that the excess is not due to their contribution. This places a significant risk on the consultant for construction cost overruns, even if not directly their fault.
  • Client Termination at Will: The Client retains a broad right to terminate the contract at will, even if the project is continuing. While compensation is scheduled for this scenario, it introduces uncertainty for the consultant.
  • Limited Insurance Excess: The maximum excess for Public Liability insurance is €10,000, which is relatively low and may require specific policy structuring.
  • Detailed Experience Requirements: The extensive list of specific project experience types and values, particularly for roads and bridges, may limit the pool of eligible bidders.
  • ISO 19650 Requirement: Explicit mention of ISO 19650 experience indicates a strong emphasis on BIM, which may be a barrier for firms not yet fully compliant.

10. SME fit assessment

This tender is likely best suited for established engineering consultancy firms with a proven track record in significant road and bridge infrastructure projects. The specific experience requirements, particularly the minimum project values (€20M for roads, €5M for bridges), and the need for qualified personnel with extensive post-graduate experience (10-15 years for key roles), suggest that smaller, less experienced firms may struggle to meet the eligibility criteria.

Consortium bidding is not explicitly prohibited but is not mentioned as a facilitated route. Sub-contracting is permitted, but the Consultant remains fully responsible for sub-consultant performance. This means SMEs could potentially participate as sub-consultants to a lead bidder, but direct bidding as a prime contractor would require meeting all the stringent eligibility and experience thresholds.

The bid preparation effort is likely to be substantial, given the detailed experience requirements, the need to compile Certificates of Satisfactory Execution for numerous projects, and the potential complexity of the technical response and pricing.

The "Pwin" signal is moderate. While the tender is open, the specific experience requirements and the budgetary control clause suggest that firms with a strong understanding of public sector infrastructure projects and robust cost management capabilities will have an advantage. The absence of a stated incumbent does not necessarily mean the field is wide open, as established firms often have long-term relationships with local authorities.

11. Where to dig deeper

  • Source RFT filename(s): Not explicitly stated, but likely includes documents referenced in the metadata.
  • eTenders CFT ID: Not surfaced in the provided text.
  • Contact email or clarification portal: [email protected] (This appears to be a consultant's contact, not the buyer's clarification portal).
  • Most important attachments:
  • [Appendix_B1_QC1_and_QC2_09-02-2022.docx] - APPENDIX B1: LIST OF PREVIOUS PROJECTS/CERTIFICATE OF SATISFACTORY EXECUTION
  • [TIRR_COE1_v2.j_Consultancy_Technical_30-09-2024.pdf] - Contract Conditions (COE1 v.2j)
  • [9. 20260703_NN003-TIRR Background Information 1 of 3.zip] - Background Information

Documents (83)

XLSX

20260623_NN003_TIRR CoE - Pricing Schedule-Final.xlsx

73.3 KB · Pricing / BOQ / Schedule of Rates

ZIP

7. 20260703_NN003-TIRR_CoE - Pricing Schedule-Tender.zip

66.9 KB · Pricing / BOQ / Schedule of Rates

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

MF_2.7_Declaration_re_Article_57_v1.0_09-02-2022.docx

30.6 KB · Form / Declaration / Certificate

PDF

00 T189_COVER_SHEET.pdf

124.6 KB

PDF

01 T189_INDEX_SHEET.pdf

144.5 KB

ZIP

1. 20260703_NN003-TIRR_SAQ-Tender.zip

901.8 KB

PDF

1. Geophysical Survey Report Feb 13.pdf

1.2 MB

ZIP

10. 20260703_NN003-TIRR Background Information 2 of 3.zip

103.8 MB

PDF

10. Landscape and Visual Impact Assessment.pdf

1.3 MB

ZIP

11. 20260703_NN003-TIRR Background Information 3 of 3.zip

4.5 MB

PDF

11.S177AE_Report.pdf

4.1 MB

PDF

12. Thurles Relief Road Prelim Design Report.pdf

14.7 MB

DOCX

13. PAG Unit 12 0 - Minor Projects (5m to 20m) PAR.docx

1.6 MB

DOCX

13. PAR_12062020 AH Land Costs.docx

13.4 MB

OTHER

13. Simple_Appraisal_Tool_v2 AH 20200612.xlsm

342.0 KB

PDF

17. 20140313 Priority Geotechnical Factual Report.pdf

33.8 MB

PDF

18. 20140313 Priority Geotechnical Interporative Report.pdf

883.3 KB

PDF

19.Road Safety Audit Stage 1.pdf

2.7 MB

ZIP

2. 20260703_NN003-TIRR_ITT-Tender.zip

500.9 KB

PDF

2. Flood Flow Modelling 20130830 - ADOBE.pdf

8.5 MB

PDF

202600703_QC2-Part-1_v3.2-25-11-2025-Tender.pdf

770.8 KB

PDF

20260618_TIRR_Brief of Services- Tender.pdf

2.8 MB

PDF

20260619_TIRR_BIM EIR-Tender.pdf

398.2 KB

DOCX

20260703_FTS9-v1.10-16-09-2024-Tender.docx

260.5 KB

PDF

20260703_ITT_S2b_Services_Open_THR_v2.0-04-11-2024-Tender.pdf

519.2 KB

DOCX

20260703_NN003_TIRR_ESPD-Tender.docx

74.3 KB · ESPD (European Single Procurement Document)

DOCX

20260703_QC_Part_2_v1.1_04-11-2024-Tender.docx

59.2 KB

DOCX

20260808_TIRR_EIR-Rev 1.docx

429.2 KB

PDF

20260817_TIRR_Brief of Services- Rev 3.pdf

2.5 MB

PDF

20260817_TIRR_EIR-Rev 2.pdf

687.9 KB

ZIP

24. OCSC 2025.zip

4.5 MB

PDF

25. ESB Diversion for UE Pumping Station.pdf

3.4 MB

ZIP

3. 20260703_NN003-TIRR_FTS-Tender.zip

642.1 KB

PDF

3. Bridge Options Report Aug 2013.pdf

1.5 MB

ZIP

4. 20260703_NN003-TIRR_Model Forms-Tender.zip

139.0 KB

PDF

4. Complete_N62_JUNCTION OPTION REPORT.pdf

7.5 MB

ZIP

5. 20260703_NN003-TIRR_Brief of Services- Tender.zip

2.6 MB

ZIP

5. 20260817_NN003-TIRR_Brief of Services- Rev 3.zip

2.4 MB

PDF

5. Screening for Appropriate Assessment and Natura Impact Statement Sep 13.pdf

3.9 MB

ZIP

6. 20260703_NN003-100-01-Tender.zip

2.1 MB

PDF

6. Flora and Fauna Sep 13.pdf

2.8 MB

PDF

7. Part VIII Planning Proposal May 2013.pdf

3.4 MB

ZIP

8. 20260703_NN003-TIRR_BIM EIR-Tender.zip

380.0 KB

ZIP

8. 20260808_NN003-TIRR_BIM EIR-Rev 1.zip

414.3 KB

ZIP

8. 20260817_NN003-TIRR_EIR-Rev 2.zip

663.9 KB

PDF

8. Archaeological Impact Statement Oct 2013.pdf

3.6 MB

ZIP

9. 20260703_NN003-TIRR Background Information 1 of 3.zip

103.4 MB

PDF

9.EIS_Screening_Report.pdf

1.7 MB

DOCX

Appendix_B1_QC1_and_QC2_09-02-2022.docx

16.6 KB · Appendix / Annex

DOCX

MF_2.1_Professional_Indemnity_09-02-2022.docx

43.0 KB · Insurance / Indemnity

DOCX

MF_2.4_v1.1-25-11-2025.docx

33.0 KB

DOCX

MF_2.5_v1.1-25-11-2025.docx

33.2 KB

DOCX

MF_2.8_Oath_Valid_v1.0_09-02-2022.docx

22.3 KB

OTHER

plot.log

111 bytes

PDF

T189-C01.pdf

2.9 MB

PDF

T189-C02.pdf

3.3 MB

PDF

T189-C03.pdf

4.0 MB

PDF

T189-C04.pdf

2.3 MB

PDF

T189-C05.pdf

3.2 MB

PDF

T189-D001.pdf

558.5 KB

PDF

T189-F01.pdf

5.1 MB

PDF

T189-F02.pdf

4.0 MB

PDF

T189-F03.pdf

5.1 MB

PDF

T189-F04.pdf

3.0 MB

PDF

T189-G01.pdf

1.5 MB

PDF

T189-G02.pdf

1.6 MB

PDF

T189-G03.pdf

1.7 MB

PDF

T189-L01.pdf

572.2 KB

PDF

T189-L02.pdf

606.5 KB

PDF

T189-L03.pdf

607.4 KB

PDF

T189-L04.pdf

555.9 KB

PDF

T189-M001.pdf

454.9 KB

PDF

T189-Q001.pdf

843.4 KB

PDF

T189-Q002.pdf

1.0 MB

PDF

T189-Q003.pdf

727.3 KB

PDF

T189-Q004.pdf

752.4 KB

PDF

T189-Q005.pdf

244.9 KB

PDF

T189-Q006.pdf

231.0 KB

PDF

T189-Q007.pdf

230.5 KB

PDF

TIRR_COE1_v2.j_Consultancy_Technical_30-09-2024.pdf

450.8 KB

DOCX

~$R_12062020 AH Land Costs.docx

162 bytes

OTHER

~$Simple_Appraisal_Tool_v2 AH 20200612.xlsm

165 bytes

Original notice text

Tipperary County Council requires technical consultancy services to be provided by a multi-disciplinary Team for the progression of the Thurles Inner Relief Road. This comprises review of existing documents and completion of outstanding deliverables for Stages 3 and 4, and preparation of all deliverables through Stages 5 to 7 inclusive of the Infrastructure Guidelines, published by the the Department of Public Expenditure, NDP Delivery and Reform and the Technical Appraisal Framework published by the Department of Transport. The Scope is more fully described in the Brief of Services included in the Tender Documents.

AI analysis updated 2 weeks, 1 day ago

Bid ↗
Details

Deadline

03 Sep

View on eTenders ↗

Procedure

Open

eTenders ID

8568587

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender