Engineering technical consultancy services for the Thurles Inner Relief Road (Tipperary). Scope covers design development, project management, BIM coordination and site supervision over a 50-month contract period. Preliminary design, statutory planning and land acquisition are already complete.
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Tipperary County Council |
|---|---|
| Title | Engineering Technical Consultancy Services for the Thurles Inner Relief Road |
| CPV / category | 71300000-1 (Engineering services) |
| Estimated value | Not disclosed |
| Per-year | Not stated |
| Procedure type | Open Procedure |
| Lots | Not stated |
| Location | Thurles, Co. Tipperary, Ireland |
| Contract length | Not stated |
| Submission deadline | 2026-08-13T15:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
This tender seeks engineering technical consultancy services for the design and development of the Thurles Inner Relief Road. The scope encompasses a comprehensive range of services required to bring the project from its current conceptual stage through to detailed design, preparation for construction, and potentially construction supervision.
The core activities for the appointed consultant will include:
- Detailed Design: Developing detailed engineering designs for the road, including geometric design, pavement design, drainage, and associated structures. This will involve adherence to relevant standards such as the Specification for Roadworks.
- BIM Implementation: Demonstrating experience with the implementation of ISO 19650 standards for Building Information Modelling (BIM) processes on engineering projects.
- Ground Investigation: Conducting and interpreting ground investigations, including fieldwork and laboratory testing, in accordance with BS EN 1997-2:2007 and other relevant standards. This will involve boreholes, trial pits, and dynamic probes.
- Structural Design: Designing any necessary bridge structures or other civil engineering structures associated with the relief road. Preliminary drawings indicate elements such as pile caps, abutments, and girders.
- Environmental Considerations: Addressing environmental aspects, including potential impacts on Natura 2000 sites within a 15km radius and recording of bat species.
- Project Supervisor Design Process (PSDP): Performing the role of PSDP, ensuring compliance with health and safety regulations during the design phase.
- Cost Engineering/Quantity Surveying: Providing cost estimates and quantity surveying services, with a focus on budgetary control and accurate estimating.
- Technical Documentation: Producing all necessary technical documentation, drawings, specifications, and reports required for tender and construction.
- Coordination and Cooperation: Ensuring effective coordination with the client and other parties, and cooperating to minimise delays and problems.
- Contract Management: Managing the consultancy services in accordance with the contract terms, including progress reporting, milestone achievement, and communication protocols.
The project area is approximately 66.50 hectares, with a proposed road length of 1,260 metres east-west. The construction programme is anticipated to be of the order of 12-15 months.
3. Background & buyer context
This procurement by Tipperary County Council is for essential technical consultancy services to advance the Thurles Inner Relief Road project. The project aims to improve traffic flow and connectivity within Thurles town. While specific policy drivers are not detailed, such infrastructure projects typically align with national and regional development plans focused on enhancing transport networks and supporting economic growth. The tender documents indicate preliminary design work has been undertaken, including site investigations and conceptual drawings, suggesting a move towards detailed design and procurement readiness. The incumbent consultant, if any, is not explicitly named in the provided metadata.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Professional Indemnity Insurance: Minimum cover of €3,000,000 on each and every claim basis, and €3,500,000 on an annual aggregate basis. Maximum excess €10,000 for property only.
- Public Liability Insurance: Minimum cover of €6,500,000 in respect of any one accident. Maximum excess €10,000 for property only.
- Employer's Liability Insurance: Minimum cover of €13,000,000 in respect of any one accident.
- Certifications: Not specified for this tender.
- Past experience:
- At least one road project completed in the last 10 years, valued at a minimum of €20M ex VAT.
- Experience in the design of public road projects with a minimum value of €10M.
- Experience in the design for construction of a single bridge with a minimum value of €5M.
- Experience with the Specification for Roadworks, with at least one completed road scheme having a value of €10M.
- Experience with public roads projects with a minimum value of €10M ex VAT.
- Experience with projects valued at a minimum of €5M ex VAT.
- Experience with a public road of minimum construction value of €10,000,000 ex VAT.
- Experience with projects valued at €3,000,000 ex VAT and having been subject to a Category 3 check in accordance with TII.
- Experience with Project Appraisal Reports for Minor Projects (€5m to €20m).
- Demonstrated experience of the implementation of ISO 19650, or equivalent, on an engineering project.
- Personnel:
- Project Director: Minimum 15 years post-graduate experience.
- Project Manager: Minimum 10 years post-graduate experience, with at least 5 years in the role of Project Manager.
- PSDP Co-Ordinator: Minimum 10 years post-qualification experience.
- Senior Engineer: Minimum Level 8 NFQ qualification in civil/structural engineering.
- Senior Structural Engineer: Minimum Level 8 NFQ qualification in civil or structural engineering.
- Geotechnical Engineer: Minimum Level 8 NFQ qualification in civil or geotechnical engineering, and be a Chartered Engineer with a minimum of 10 years post-qualification experience.
- Cost Engineer/Quantity Surveyor: Minimum Level 8 NFQ qualification in a relevant field.
- BIM Manager: Minimum Level 8 NFQ qualification in engineering or a related discipline, with a minimum of 5 years experience in BIM management and control.
- Geographic / facility constraints: Services to be performed within a 15km radius of the scheme.
5. Award criteria & scoring
The award will be based on the Most Economically Advantageous Tender (MEAT), with a split between price and quality. The specific weighting and scoring methodology are not detailed in the provided extract, but typically include:
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| Quality | Not stated | Not stated | Not stated |
| Price | Not stated | Not stated | Not stated |
A minimum scoring threshold per criterion or overall may be applied.
6. Submission requirements
Bidders are required to submit the following:
- Method statement / response document: Not specified in terms of format or page limits.
- CVs: For named key personnel, detailing their qualifications and experience.
- Pricing schedule: Not specified in terms of format.
- Case studies: A list of previous projects with Certificates of Satisfactory Execution. Up to 28 projects can be listed.
- Declarations: Not specified, but typically include ESPD, Bona Fides, Tax Clearance, and Conflict of Interest declarations.
- Mandatory site visit: Not specified.
- Submission portal: eTenders.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | Not stated |
| Clarification deadline | Not stated |
| Mandatory site visit | Not stated |
| Tender deadline | 2026-08-13T15:00:00+00:00 |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
- Term + extension: The contract is structured into Stages and Sub-Stages, with permissions to start granted by the Client. Performance Periods are scheduled for each Stage.
- Payment terms: Payment of Stage Fees is due within 30 days of a valid invoice, provided a current tax clearance certificate is held. A percentage of the total fee is applied to the estimated project costs.
- Key SLAs/KPIs: Milestones must be met within each Stage. Performance is evaluated based on skill, care, diligence, efficiency, and professional conduct.
- Liquidated damages or penalty regimes: Not explicitly detailed, but the contract includes provisions for budgetary control where tendered amounts exceed estimates by an 'Excess Percentage'.
- Termination clauses: The Client can terminate for cause, insolvency, or at will (with 14-28 days' notice). Either party can terminate for substantial breach. Termination for cause or insolvency entitles the terminating party to damages. Termination at will by the Client may result in a scheduled payment to the Consultant.
- IP ownership: The Consultant grants the Client a royalty-free, perpetual, non-exclusive, irrevocable licence to use Consultant's Documents. An absolute assignment of rights is possible for specific documents as scheduled.
- Sub-contracting rules: Sub-contracting requires Client agreement. The Consultant is responsible for sub-consultant acts and omissions. Sub-consultants must provide collateral warranties.
- Parent-company guarantee or bond requirements: Not specified.
9. Risks, red flags & unusuals
- Budgetary Control Clause: Clause 12 introduces a "Budgetary Control" mechanism. If the tendered construction amount exceeds the last approved estimate by an "Excess Percentage," the Consultant's fee for the design stage may be reduced unless they can establish that the excess is not due to their contribution. This places a significant risk on the consultant for construction cost overruns, even if not directly their fault.
- Client Termination at Will: The Client retains a broad right to terminate the contract at will, even if the project is continuing. While compensation is scheduled for this scenario, it introduces uncertainty for the consultant.
- Limited Insurance Excess: The maximum excess for Public Liability insurance is €10,000, which is relatively low and may require specific policy structuring.
- Detailed Experience Requirements: The extensive list of specific project experience types and values, particularly for roads and bridges, may limit the pool of eligible bidders.
- ISO 19650 Requirement: Explicit mention of ISO 19650 experience indicates a strong emphasis on BIM, which may be a barrier for firms not yet fully compliant.
10. SME fit assessment
This tender is likely best suited for established engineering consultancy firms with a proven track record in significant road and bridge infrastructure projects. The specific experience requirements, particularly the minimum project values (€20M for roads, €5M for bridges), and the need for qualified personnel with extensive post-graduate experience (10-15 years for key roles), suggest that smaller, less experienced firms may struggle to meet the eligibility criteria.
Consortium bidding is not explicitly prohibited but is not mentioned as a facilitated route. Sub-contracting is permitted, but the Consultant remains fully responsible for sub-consultant performance. This means SMEs could potentially participate as sub-consultants to a lead bidder, but direct bidding as a prime contractor would require meeting all the stringent eligibility and experience thresholds.
The bid preparation effort is likely to be substantial, given the detailed experience requirements, the need to compile Certificates of Satisfactory Execution for numerous projects, and the potential complexity of the technical response and pricing.
The "Pwin" signal is moderate. While the tender is open, the specific experience requirements and the budgetary control clause suggest that firms with a strong understanding of public sector infrastructure projects and robust cost management capabilities will have an advantage. The absence of a stated incumbent does not necessarily mean the field is wide open, as established firms often have long-term relationships with local authorities.
11. Where to dig deeper
- Source RFT filename(s): Not explicitly stated, but likely includes documents referenced in the metadata.
- eTenders CFT ID: Not surfaced in the provided text.
- Contact email or clarification portal: [email protected] (This appears to be a consultant's contact, not the buyer's clarification portal).
- Most important attachments:
- [Appendix_B1_QC1_and_QC2_09-02-2022.docx] - APPENDIX B1: LIST OF PREVIOUS PROJECTS/CERTIFICATE OF SATISFACTORY EXECUTION
- [TIRR_COE1_v2.j_Consultancy_Technical_30-09-2024.pdf] - Contract Conditions (COE1 v.2j)
- [9. 20260703_NN003-TIRR Background Information 1 of 3.zip] - Background Information
Documents (83)
20260623_NN003_TIRR CoE - Pricing Schedule-Final.xlsx
73.3 KB · Pricing / BOQ / Schedule of Rates
7. 20260703_NN003-TIRR_CoE - Pricing Schedule-Tender.zip
66.9 KB · Pricing / BOQ / Schedule of Rates
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
MF_2.7_Declaration_re_Article_57_v1.0_09-02-2022.docx
30.6 KB · Form / Declaration / Certificate
00 T189_COVER_SHEET.pdf
124.6 KB
01 T189_INDEX_SHEET.pdf
144.5 KB
1. 20260703_NN003-TIRR_SAQ-Tender.zip
901.8 KB
1. Geophysical Survey Report Feb 13.pdf
1.2 MB
10. 20260703_NN003-TIRR Background Information 2 of 3.zip
103.8 MB
10. Landscape and Visual Impact Assessment.pdf
1.3 MB
11. 20260703_NN003-TIRR Background Information 3 of 3.zip
4.5 MB
11.S177AE_Report.pdf
4.1 MB
12. Thurles Relief Road Prelim Design Report.pdf
14.7 MB
13. PAG Unit 12 0 - Minor Projects (5m to 20m) PAR.docx
1.6 MB
13. PAR_12062020 AH Land Costs.docx
13.4 MB
13. Simple_Appraisal_Tool_v2 AH 20200612.xlsm
342.0 KB
17. 20140313 Priority Geotechnical Factual Report.pdf
33.8 MB
18. 20140313 Priority Geotechnical Interporative Report.pdf
883.3 KB
19.Road Safety Audit Stage 1.pdf
2.7 MB
2. 20260703_NN003-TIRR_ITT-Tender.zip
500.9 KB
2. Flood Flow Modelling 20130830 - ADOBE.pdf
8.5 MB
202600703_QC2-Part-1_v3.2-25-11-2025-Tender.pdf
770.8 KB
20260618_TIRR_Brief of Services- Tender.pdf
2.8 MB
20260619_TIRR_BIM EIR-Tender.pdf
398.2 KB
20260703_FTS9-v1.10-16-09-2024-Tender.docx
260.5 KB
20260703_ITT_S2b_Services_Open_THR_v2.0-04-11-2024-Tender.pdf
519.2 KB
20260703_NN003_TIRR_ESPD-Tender.docx
74.3 KB · ESPD (European Single Procurement Document)
20260703_QC_Part_2_v1.1_04-11-2024-Tender.docx
59.2 KB
20260808_TIRR_EIR-Rev 1.docx
429.2 KB
20260817_TIRR_Brief of Services- Rev 3.pdf
2.5 MB
20260817_TIRR_EIR-Rev 2.pdf
687.9 KB
24. OCSC 2025.zip
4.5 MB
25. ESB Diversion for UE Pumping Station.pdf
3.4 MB
3. 20260703_NN003-TIRR_FTS-Tender.zip
642.1 KB
3. Bridge Options Report Aug 2013.pdf
1.5 MB
4. 20260703_NN003-TIRR_Model Forms-Tender.zip
139.0 KB
4. Complete_N62_JUNCTION OPTION REPORT.pdf
7.5 MB
5. 20260703_NN003-TIRR_Brief of Services- Tender.zip
2.6 MB
5. 20260817_NN003-TIRR_Brief of Services- Rev 3.zip
2.4 MB
5. Screening for Appropriate Assessment and Natura Impact Statement Sep 13.pdf
3.9 MB
6. 20260703_NN003-100-01-Tender.zip
2.1 MB
6. Flora and Fauna Sep 13.pdf
2.8 MB
7. Part VIII Planning Proposal May 2013.pdf
3.4 MB
8. 20260703_NN003-TIRR_BIM EIR-Tender.zip
380.0 KB
8. 20260808_NN003-TIRR_BIM EIR-Rev 1.zip
414.3 KB
8. 20260817_NN003-TIRR_EIR-Rev 2.zip
663.9 KB
8. Archaeological Impact Statement Oct 2013.pdf
3.6 MB
9. 20260703_NN003-TIRR Background Information 1 of 3.zip
103.4 MB
9.EIS_Screening_Report.pdf
1.7 MB
Appendix_B1_QC1_and_QC2_09-02-2022.docx
16.6 KB · Appendix / Annex
MF_2.1_Professional_Indemnity_09-02-2022.docx
43.0 KB · Insurance / Indemnity
MF_2.4_v1.1-25-11-2025.docx
33.0 KB
MF_2.5_v1.1-25-11-2025.docx
33.2 KB
MF_2.8_Oath_Valid_v1.0_09-02-2022.docx
22.3 KB
plot.log
111 bytes
T189-C01.pdf
2.9 MB
T189-C02.pdf
3.3 MB
T189-C03.pdf
4.0 MB
T189-C04.pdf
2.3 MB
T189-C05.pdf
3.2 MB
T189-D001.pdf
558.5 KB
T189-F01.pdf
5.1 MB
T189-F02.pdf
4.0 MB
T189-F03.pdf
5.1 MB
T189-F04.pdf
3.0 MB
T189-G01.pdf
1.5 MB
T189-G02.pdf
1.6 MB
T189-G03.pdf
1.7 MB
T189-L01.pdf
572.2 KB
T189-L02.pdf
606.5 KB
T189-L03.pdf
607.4 KB
T189-L04.pdf
555.9 KB
T189-M001.pdf
454.9 KB
T189-Q001.pdf
843.4 KB
T189-Q002.pdf
1.0 MB
T189-Q003.pdf
727.3 KB
T189-Q004.pdf
752.4 KB
T189-Q005.pdf
244.9 KB
T189-Q006.pdf
231.0 KB
T189-Q007.pdf
230.5 KB
TIRR_COE1_v2.j_Consultancy_Technical_30-09-2024.pdf
450.8 KB
~$R_12062020 AH Land Costs.docx
162 bytes
~$Simple_Appraisal_Tool_v2 AH 20200612.xlsm
165 bytes
Original notice text
Tipperary County Council requires technical consultancy services to be provided by a multi-disciplinary Team for the progression of the Thurles Inner Relief Road. This comprises review of existing documents and completion of outstanding deliverables for Stages 3 and 4, and preparation of all deliverables through Stages 5 to 7 inclusive of the Infrastructure Guidelines, published by the the Department of Public Expenditure, NDP Delivery and Reform and the Technical Appraisal Framework published by the Department of Transport. The Scope is more fully described in the Brief of Services included in the Tender Documents.
AI analysis updated 2 weeks, 1 day ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender