Architect led Integrated Design Team Consultancy Services for the Mixed-Use Redevelopment at the Athea Community Council Building, Co. Limerick
Deadline
12 Jun
12 Jun 2026
Deadline
12 Jun
Architect-led design team for mixed-use redevelopment in Athea, Co. Limerick
Architect-led design team for mixed-use redevelopment in Athea, Co. Limerick
Bidder profile
Suitable for architect-led teams with capacity to meet significant insurance requirements. Open to new bidders with no incumbent.
Risks & flags
- High insurance requirements
- Lack of detailed award criteria
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Athea Community Council Company CLG |
|---|---|
| Title | Architect led Integrated Design Team Consultancy Services for the Mixed-Use Redevelopment at the Athea Community Council Building, Co. Limerick |
| CPV / category | Engineering Consultancy |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | Open Procedure |
| Lots | Not specified |
| Location | Athea, Co. Limerick |
| Contract length | Not specified |
| Submission deadline | 2026-06-05, 13:00 |
| Go-live / start | Not specified |
2. Scope of Work
The tender seeks an architect-led integrated design team for the redevelopment of the Athea Community Council Building in Co. Limerick. The project involves transforming the existing structure into a mixed-use facility. The scale of the project is not disclosed, but it encompasses several key activities:
- Design Development: The lead architect will manage the design process from initial concept through to detailed design. This includes coordinating with various specialists such as civil and structural engineers, building services engineers, and other consultants as required.
- Project Management: Overseeing the project timeline, ensuring milestones are met, and coordinating with the contracting authority and other stakeholders.
- Compliance and Approvals: Ensuring all designs comply with relevant Irish building regulations and securing necessary planning permissions and approvals.
- Construction Oversight: Providing technical support during the construction phase, including site visits and inspections to ensure adherence to design specifications.
- Sustainability Integration: Incorporating sustainable design principles and energy-efficient solutions into the redevelopment plans.
- Stakeholder Engagement: Facilitating communication between the community council, local authorities, and other stakeholders to ensure the project meets community needs.
- Documentation and Reporting: Preparing detailed reports and documentation throughout the project lifecycle, including progress reports and final project handover documentation.
3. Background & buyer context
The Athea Community Council Building redevelopment is part of a broader initiative to enhance community infrastructure in Co. Limerick. The project aligns with local development plans aimed at revitalizing community spaces and providing multifunctional facilities. The procurement is driven by the need to modernize the existing building to better serve the community's needs. There is no mention of an incumbent service provider, indicating an open opportunity for new entrants. The strategic goal is to create a sustainable, accessible, and versatile community hub.
4. Eligibility & selection criteria
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability: €6,500,000
- Employer's Liability: €13,000,000
- Professional Indemnity: €1,250,000 per claim, €1,500,000 annual aggregate
- Certifications: Not specified for this tender.
- Past experience: Not specified for this tender.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail thresholds |
|---|---|---|---|
| Design Approach | 40% | Detailed design methodology | Not specified |
| Service Delivery | 30% | Methodology and execution plan | Not specified |
| Price | 30% | Competitive pricing | Not specified |
The evaluation follows the Most Economically Advantageous Tender (MEAT) principle, with a 70/30 quality/price split. No minimum scoring thresholds are specified.
6. Submission requirements
- Method statement / response document: Detailed design approach and methodology, no page limits specified.
- CVs: Required for key project staff, no page count specified.
- Pricing schedule: Detailed breakdown required, format not specified.
- Case studies: Not specified.
- Declarations: ESPD, Bona Fides, Tax clearance, Conflict of Interest.
- Mandatory site visit: Not specified.
- Submission portal: eTenders, specific format rules not detailed.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | April 2026 |
| Clarification deadline | Not specified |
| Mandatory site visit | Not specified |
| Tender deadline | 2026-06-05, 13:00 |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
The contract terms include a standard engagement with no specified term or extension structure. Payment terms are not detailed. Key performance indicators (KPIs) and service level agreements (SLAs) are not specified. There are no liquidated damages or penalty regimes mentioned. Termination clauses and intellectual property ownership are not detailed. Sub-contracting is allowed, but sub-consultants must provide collateral warranties. No parent-company guarantee or bond requirements are specified.
9. Risks, red flags & unusuals
The tender does not specify a turnover requirement, which may broaden the pool of potential bidders. However, the insurance requirements are significant, potentially limiting smaller firms. The lack of detailed submission requirements and scoring thresholds introduces uncertainty in bid preparation. The absence of a specified contract length and go-live date may affect project planning and resource allocation.
10. SME fit assessment
This tender is accessible to medium-sized architectural firms with experience in managing integrated design teams. The insurance requirements may be a barrier for smaller firms. Consortiums and sub-contracting are permitted, allowing smaller firms to participate indirectly. Bid preparation is likely to require several days, given the need for detailed design and methodology documentation. The absence of an incumbent suggests an open field, but the lack of detailed criteria may favor firms with strong proposal-writing capabilities.
11. Where to dig deeper
- Source RFT filename(s): Vol A - Invitation to Tender letter.pdf, Vol A - ITT.pdf
- eTenders CFT ID: Not specified
- Contact email or clarification portal: Not specified
- Important attachments: "Appendix B2 — Suitability Assessment", "Mandatory Requirements Schedule"
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,250,000
Scoring
Most Economically Advantageous Tender
Documents (18)
Vol A - Invitation to Tender letter.pdf
300.4 KB · RFT / Invitation to Tender
Vol A - ITT.pdf
861.3 KB · RFT / Invitation to Tender
Appendix-A-Applicants-Self-Declaration-re-Regulation-57-1.docx
44.5 KB · Form / Declaration / Certificate
MF_2.4.docx
33.0 KB · Form / Declaration / Certificate
MF_2.5.docx
33.0 KB · Form / Declaration / Certificate
SAQ - Architect.zip
877.0 KB · Other
Appendix-B1-QC1-and-QC2-09-02-2022.docx
29.1 KB · Appendix / Annex
Appendix-B3-QC1-and-QC2-09-02-2022.docx
27.5 KB · Appendix / Annex
Appendix-D1 Staff CV.docx
62.3 KB · Appendix / Annex
Rev 01_Appendix-D1 Staff CV.docx
59.8 KB · Appendix / Annex
SAQ_QC2-Part 1-Architect.pdf
752.5 KB · ESPD (European Single Procurement Document)
SAQ_QC2-Part 2-Architect.docx
69.2 KB · Tender Response Template
Tender Bulletin #1.pdf
335.5 KB · Clarification / Addendum
Vol B Annex 1 - Tender and Schedule.docx
204.2 KB · Appendix / Annex
Vol B Annex 2 - Brief of Services.pdf
1.0 MB · Appendix / Annex
Vol B Annex 3 - Resource Schedule.xlsx
27.9 KB · Appendix / Annex
Vol B Annex 4 - COE.docx
91.1 KB · Appendix / Annex
Vol B Annex 5 - Data Processor Questionnaire.docx
148.6 KB · Appendix / Annex
Original notice text
Athea Community Council CLG as Contracting Authority seeks to procure the services of an Architect led Integrated Design Team for delivery of Stage (ii)b to Stage (v) services in accordance with the Capital Works Management Framework. The Architect will act as Lead Consultant for The Design team. The purpose of this commission is to assist Athea Community Council CLG in redeveloping Athea Community Council Building at Con Colbert Street, Athea, Co. Limerick, as a mixed-use development comprising a unit at ground floor level and residential accommodation on the first and second floors.