Skip to content
TenderMatch
← Tenders / New Site Entry at Lisbunny Industrial Park, Nenagh, Co. Tipperary
Open Construction & Civil Engineering Works SME Suitable Open

New Site Entry at Lisbunny Industrial Park, Nenagh, Co. Tipperary

Deadline

08 Oct

Construction of a new road, drainage, and utility diversions for a new site entry at Lisbunny Industrial Park.

SME fit: Medium Bid effort: Medium 📍 Tipperary

Civil engineering works for new site entry at Lisbunny Industrial Park, Nenagh

Bidder profile

SMEs with strong civil engineering experience, particularly in road construction, drainage, and utility diversions, capable of meeting high insurance requirements and coordinating with utility providers.

Risks & flags

  • Lack of detail in tender extract
  • Substantial insurance requirements
  • Critical ESB coordination
  • Site complexities (flood defence, existing utilities)

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

Here is a comprehensive Tender Briefing based on the provided documents:

1. At a glance

Buyer Title CPV / category Estimated value Per-year Procedure type Lots Location Contract length Submission deadline Go-live / start | :-------------------- | :-------------------------------------- | :------------- | :-------------- | :------- | :------------- | :--- | :--------------- | :-------------- | :------------------ | :-------------- | Not specified New Site Entry at Lisbunny Industrial Park Not stated Not disclosed Not stated Not stated Not stated Nenagh, Co. Tipperary Not stated Not stated Not stated

2. Scope of Work

This tender seeks a contractor to undertake civil engineering works for a new site entry at Lisbunny Industrial Park, Nenagh, Co. Tipperary. The project involves the construction of a new road, associated infrastructure, and the relocation or undergrounding of existing utilities.

Key activities and deliverables include:

  • Road Construction:
  • Construction of a 6.0m carriageway.
  • Installation of 1.0m and 1.5m grass verges.
  • Construction of a 1.75m cycleway.
  • Construction of a 2.0m footpath.
  • Provision of proposed kerb lines and drop kerbs.
  • Road surfacing to include 40mm surface course (SMA 14), 60mm binder course (AC 20 HDM), and 100mm base course (AC 32).
  • Sub-base construction including 250mm compacted 805 sub-base material and granular capping material (6F1 or 6F2).
  • Road alignment and geometry as detailed in Drawing 11393-2002.
  • Drainage:
  • Installation of a 700mm concrete culvert and headwall.
  • Storm drainage layout as per Drawing 11393-2005.
  • Provision for flood compensation: 304m³ and 4930m³.
  • Utility Works:
  • Undergrounding of existing 10kV overhead ESB lines, including duct bank details (8x110mm HDPE duct).
  • Installation of 2x125mm duct banks for Medium Voltage (MV) ESB lines.
  • Installation of 2x125mm duct banks for future connections.
  • Installation of 8x110mm duct banks for future connections.
  • Coordination with ESB for undergrounding requirements and LV requirements.
  • Site Development & Ancillary Works:
  • Grading lines for cut and fill.
  • Site boundary definition.
  • Relocation of existing ESB pylons.
  • Trimming back existing vegetation.
  • Relocation of existing stone walls to accommodate junction visibility.
  • Penetration and regrading of existing flood defence barrier.
  • Provision of visibility splays (TII visibility splay - 2.4m x 160m).
  • Detailed site development as per Drawing 11393-2003.
  • Surveys and Checks:
  • Thorough check for the actual location of all services/utilities, above and below ground, before work commences.
  • In-situ CBR tests to verify CBR at formation level.

The project is located in Nenagh, Co. Tipperary, with specific site details and constraints mapped in Drawing 11393-2001.

3. Background & buyer context

This procurement relates to the development of a new site entry at Lisbunny Industrial Park in Nenagh, Co. Tipperary. The project aims to improve access and infrastructure within the industrial area. The drawings provided by TOBIN Consulting Engineers indicate a project designed to enhance connectivity and facilitate development. The scope involves significant civil engineering works, including road construction and utility diversions, suggesting a need for a contractor experienced in managing complex site development projects within an industrial setting. The project appears to be a standalone development rather than part of a larger, named government programme based on the available information.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Public Liability: €6,500,000 per claim, with a maximum excess of €10,000 for property damage.
  • Employer's Liability: €13,000,000 per claim.
  • Professional Indemnity: €2,500,000 per claim and €3,000,000 on an annual aggregate basis.
  • Certifications: Not specified for this tender.
  • Past experience: Not specified for this tender.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Not specified for this tender.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided extract. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which balances price and quality. The specific weighting for price and quality, along with any sub-criteria and pass/fail thresholds, would be detailed in the full tender documentation.

6. Submission requirements

The specific submission requirements are not detailed in the provided extract. However, typical submissions for such tenders include:

  • A comprehensive response document detailing the bidder's approach to the scope of work.
  • Detailed pricing schedule.
  • CVs of key personnel proposed for the project.
  • Case studies demonstrating relevant experience.
  • Completed tender forms and declarations, including the European Single Procurement Document (ESPD), Bona Fides, Tax Clearance, and Conflict of Interest declarations.
  • Confirmation of insurance coverage meeting the specified minimums.

7. Key dates & process

Stage Date/Time
RFT issued Not stated
Clarification deadline Not stated
Tender deadline Not stated
Expected award Not stated
Contract start Not stated
Go-live / mobilisation Not stated

8. Contract terms that matter

The provided text does not detail specific contract terms such as duration, payment schedules, SLAs, penalties, termination clauses, or IP ownership. Standard public sector contract terms would apply, including those related to Freedom of Information, data protection, and prompt payment. The Framework Member is required to maintain records for a minimum of six years after the expiry of the Framework Period.

9. Risks, red flags & unusuals

  • Lack of Detail: The provided extract is heavily focused on technical drawings and insurance requirements, with significant gaps in crucial tender information such as the estimated value, procedure type, contract length, submission requirements, award criteria, and key dates. This suggests the extract is incomplete or preliminary.
  • Insurance Requirements: The insurance requirements are clearly stated and substantial, particularly the €13 million Employers' Liability and €6.5 million Public Liability. This indicates a project with significant potential risk exposure.
  • ESB Coordination: The extensive detail regarding ESB overhead and underground lines, including specific duct bank requirements and exclusion zones, highlights a critical dependency and potential risk area. Successful coordination and execution of these works will be paramount.
  • Site Constraints: The presence of existing flood defence barriers, overhead power lines, and the Ollatrim River (Abhainn Chalatroma) indicates potential site complexities that will require careful management.

10. SME fit assessment

This tender is likely to be most suitable for small to medium-sized enterprises (SMEs) with a strong track record in civil engineering and infrastructure projects, particularly those involving road construction, drainage, and utility diversions.

  • Credible Bidders: SMEs with demonstrated experience in managing projects of similar scale and complexity, possessing the required insurance levels, and capable of handling significant coordination with utility providers like ESB, would be well-positioned.
  • Consortium/Sub-contracting: The documents do not explicitly state whether consortium bids or sub-contracting are permitted. However, given the scale of the insurance requirements, it is plausible that consortium bids might be encouraged or necessary for some SMEs to meet the financial and technical demands.
  • Indicative Bid-Prep Effort: Without specific submission requirements or award criteria, estimating bid preparation effort is difficult. However, the detailed drawings and significant insurance requirements suggest a moderate to high effort, likely requiring several days of dedicated work for technical and commercial teams.
  • Pwin Signal: The absence of information on the incumbent, previous winners, or a specific procurement procedure (e.g., framework agreement) makes it difficult to assess the Pwin (Probability of Winning) signal. The focus on detailed technical drawings suggests a technically demanding project.

11. Where to dig deeper

  • Source RFT Filename(s): [Appendix 4 Drawings.pdf] (This appears to be a collection of drawings, not a full RFT).
  • eTenders CFT ID: Not specified.
  • Contact Email/Clarification Portal: Not specified.
  • Most Important Attachments:
  • Drawing 11393-2000 – General Arrangement Plan
  • Drawing 11393-2001 – Constraints Map
  • Drawing 11393-2002 – Proposed Alignment Layout
  • Drawing 11393-2003 – Site Development Details
until submission deadline — 08 Oct 2026 at 12:00 Deadline passed

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€2,500,000

Scoring

Most Economically Advantageous Tender

Documents (52)

PDF

05 SPFA Lisbunny Pricing Document.pdf

158.9 KB · Pricing / BOQ / Schedule of Rates

XLSX

05 SPFA Lisbunny Pricing Document.xlsx

67.0 KB · Pricing / BOQ / Schedule of Rates

ZIP

05 Vol C Pricing Document.zip

207.6 KB · Pricing / BOQ / Schedule of Rates

ZIP

07 Single Party Framework Agreement.zip

280.2 KB · Contract / Agreement / Terms

DOCX

07 SPFA Lisbunny Link Road Single Party Framework.docx

86.9 KB · Contract / Agreement / Terms

PDF

07 SPFA Lisbunny Link Road Single Party Framework.pdf

214.0 KB · Contract / Agreement / Terms

DOCX

MF_2.3_Collateral_Warranty_v1.2_14-10-2024.docx

45.3 KB · Contract / Agreement / Terms

DOCX

Tipperary County Council Data Processing Agreement.docx

56.3 KB · Contract / Agreement / Terms

ZIP

04 Vol B Form of Tender and Schedule.zip

566.0 KB · Form / Declaration / Certificate

DOCX

MF_2.4_v1.1-25-11-2025.docx

33.1 KB · Form / Declaration / Certificate

DOCX

MF_2.5_v1.1-25-11-2025.docx

33.3 KB · Form / Declaration / Certificate

PDF

Circular_05_2023_Initiatives to Assist SMEs in Public Procurement.pdf

483.7 KB · Other

PDF

Circular_17_2025_Updated Green Public Procurement Instructions for Public Sector Bodies.pdf

676.8 KB · Other

PDF

Decarbonisation Tipperary County Council.pdf

198.1 KB · Other

PDF

reducing-embodied-carbon-in-cement-and-concrete-through-public-procurement-in-ireland.pdf

5.0 MB · Other

PDF

TCC Procurement Procedures.pdf

601.8 KB · Other

PDF

Tipperary County Council Green Public Procurement Strategy 2024-2026.pdf

171.6 KB · Other

PDF

Tipperary County Council Public Lighting Policy 2022.pdf

642.3 KB · Other

ZIP

01 Instructions to Tenderers.zip

436.5 KB

PDF

01 SPFA Lisbunny ITT.pdf

452.8 KB

ZIP

02 Suitability Assessment.zip

718.4 KB

PDF

02.1 SPFA Lisbunny QC2-Part-1.pdf

562.3 KB

DOCX

02.2 SPFA Lisbunny QC_Part_2.docx

59.4 KB

DOCX

02.3 SPFA Lisbunny SAQ Appendix C - CV Template.docx

17.5 KB · Appendix / Annex

DOCX

02.6 SPFA Lisbunny ESPD.docx

74.2 KB · ESPD (European Single Procurement Document)

PDF

03 SPFA Lisbunny Link Road Service Requirements.pdf

1.1 MB

ZIP

03 Vol A Service Requirements.zip

1.1 MB

DOCX

04 SPFA Lisbunny FTS.docx

193.6 KB

PDF

04 SPFA Lisbunny FTS.pdf

418.1 KB

ZIP

06 Conditions and Model Forms.zip

254.5 KB

DOCX

06 SPFA Lisbunny COE1_v2.j.docx

80.7 KB

ZIP

08 Information Pack.zip

45.3 MB

PDF

AA_Screening.pdf

2.7 MB · Appendix / Annex

PDF

Appendix 1 Topo Survey.pdf

4.6 MB · Appendix / Annex

PDF

Appendix 2 GPR Survey.pdf

8.0 MB · Appendix / Annex

PDF

Appendix 3 GI Report.pdf

8.9 MB · Appendix / Annex

PDF

Appendix 4 Drawings.pdf

2.5 MB · Appendix / Annex

PDF

Appendix 5 Storm Water Analysis.pdf

246.7 KB · Appendix / Annex

PDF

Appendix 6 Stage 3 Flood Risk Assessment.pdf

3.6 MB · Appendix / Annex

PDF

Appendix 7 High Level Cost Report.pdf

525.4 KB · Appendix / Annex

PDF

Appendix 8 ESB Safety Letter.pdf

240.2 KB · Appendix / Annex

DOCX

Appendix_B1.docx

16.6 KB · Appendix / Annex

DOCX

Appendix_B3.docx

25.6 KB · Appendix / Annex

PDF

BPC 1 PSDP Designer.pdf

209.7 KB · Appendix / Annex

PDF

DSI-Environmentally-Friendly-Lighting-Guide-2-1.pdf

4.2 MB · Appendix / Annex

PDF

EcIA Technical Note.pdf

138.9 KB · Appendix / Annex

PDF

EIA_Screening_Report.pdf

793.2 KB · Appendix / Annex

PDF

Emails re Reports.pdf

109.6 KB · Clarification / Addendum

PDF

Feasibility Report - Lisbunny Industrial Estate No Appendices.pdf

3.0 MB · Appendix / Annex

PDF

Information Pack Table of Contents.pdf

88.4 KB · Appendix / Annex

DOCX

MF_2.10_Reliance_Warranty_v1.0_09-02-2022.docx

47.6 KB

DOCX

MF_2.1_Professional_Indemnity_09-02-2022.docx

40.5 KB · Insurance / Indemnity

Original notice text

Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211. The proposed new extension is approximately 350 metres in length. Options for the upgrade of the existing L5146 are to be examined and designed within the brief also. The length of existing road potentially to be upgraded is approximately 550 metres. This tender is for the establishment of a Single Party Framework Agreement and the initial contract being for CWMF Stages (i) to (iii). Subsequent Stages may be called off from the Framework. See Service Requirements for further details .

AI analysis updated 13 hours, 31 minutes ago

Bid ↗
Details

Deadline

08 Oct

View on eTenders ↗

Location

Nenagh, Co. Tipperary

Procedure

Open

eTenders ID

8969941

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender