New Site Entry at Lisbunny Industrial Park, Nenagh, Co. Tipperary
Deadline
08 Oct
08 Oct 2026
Deadline
08 Oct
Construction of a new road, drainage, and utility diversions for a new site entry at Lisbunny Industrial Park.
Civil engineering works for new site entry at Lisbunny Industrial Park, Nenagh
Bidder profile
SMEs with strong civil engineering experience, particularly in road construction, drainage, and utility diversions, capable of meeting high insurance requirements and coordinating with utility providers.
Risks & flags
- Lack of detail in tender extract
- Substantial insurance requirements
- Critical ESB coordination
- Site complexities (flood defence, existing utilities)
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
Here is a comprehensive Tender Briefing based on the provided documents:
1. At a glance
Buyer Title CPV / category Estimated value Per-year Procedure type Lots Location Contract length Submission deadline Go-live / start | :-------------------- | :-------------------------------------- | :------------- | :-------------- | :------- | :------------- | :--- | :--------------- | :-------------- | :------------------ | :-------------- | Not specified New Site Entry at Lisbunny Industrial Park Not stated Not disclosed Not stated Not stated Not stated Nenagh, Co. Tipperary Not stated Not stated Not stated
2. Scope of Work
This tender seeks a contractor to undertake civil engineering works for a new site entry at Lisbunny Industrial Park, Nenagh, Co. Tipperary. The project involves the construction of a new road, associated infrastructure, and the relocation or undergrounding of existing utilities.
Key activities and deliverables include:
- Road Construction:
- Construction of a 6.0m carriageway.
- Installation of 1.0m and 1.5m grass verges.
- Construction of a 1.75m cycleway.
- Construction of a 2.0m footpath.
- Provision of proposed kerb lines and drop kerbs.
- Road surfacing to include 40mm surface course (SMA 14), 60mm binder course (AC 20 HDM), and 100mm base course (AC 32).
- Sub-base construction including 250mm compacted 805 sub-base material and granular capping material (6F1 or 6F2).
- Road alignment and geometry as detailed in Drawing 11393-2002.
- Drainage:
- Installation of a 700mm concrete culvert and headwall.
- Storm drainage layout as per Drawing 11393-2005.
- Provision for flood compensation: 304m³ and 4930m³.
- Utility Works:
- Undergrounding of existing 10kV overhead ESB lines, including duct bank details (8x110mm HDPE duct).
- Installation of 2x125mm duct banks for Medium Voltage (MV) ESB lines.
- Installation of 2x125mm duct banks for future connections.
- Installation of 8x110mm duct banks for future connections.
- Coordination with ESB for undergrounding requirements and LV requirements.
- Site Development & Ancillary Works:
- Grading lines for cut and fill.
- Site boundary definition.
- Relocation of existing ESB pylons.
- Trimming back existing vegetation.
- Relocation of existing stone walls to accommodate junction visibility.
- Penetration and regrading of existing flood defence barrier.
- Provision of visibility splays (TII visibility splay - 2.4m x 160m).
- Detailed site development as per Drawing 11393-2003.
- Surveys and Checks:
- Thorough check for the actual location of all services/utilities, above and below ground, before work commences.
- In-situ CBR tests to verify CBR at formation level.
The project is located in Nenagh, Co. Tipperary, with specific site details and constraints mapped in Drawing 11393-2001.
3. Background & buyer context
This procurement relates to the development of a new site entry at Lisbunny Industrial Park in Nenagh, Co. Tipperary. The project aims to improve access and infrastructure within the industrial area. The drawings provided by TOBIN Consulting Engineers indicate a project designed to enhance connectivity and facilitate development. The scope involves significant civil engineering works, including road construction and utility diversions, suggesting a need for a contractor experienced in managing complex site development projects within an industrial setting. The project appears to be a standalone development rather than part of a larger, named government programme based on the available information.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability: €6,500,000 per claim, with a maximum excess of €10,000 for property damage.
- Employer's Liability: €13,000,000 per claim.
- Professional Indemnity: €2,500,000 per claim and €3,000,000 on an annual aggregate basis.
- Certifications: Not specified for this tender.
- Past experience: Not specified for this tender.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria and scoring mechanism are not detailed in the provided extract. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which balances price and quality. The specific weighting for price and quality, along with any sub-criteria and pass/fail thresholds, would be detailed in the full tender documentation.
6. Submission requirements
The specific submission requirements are not detailed in the provided extract. However, typical submissions for such tenders include:
- A comprehensive response document detailing the bidder's approach to the scope of work.
- Detailed pricing schedule.
- CVs of key personnel proposed for the project.
- Case studies demonstrating relevant experience.
- Completed tender forms and declarations, including the European Single Procurement Document (ESPD), Bona Fides, Tax Clearance, and Conflict of Interest declarations.
- Confirmation of insurance coverage meeting the specified minimums.
7. Key dates & process
| Stage | Date/Time |
|---|---|
| RFT issued | Not stated |
| Clarification deadline | Not stated |
| Tender deadline | Not stated |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
The provided text does not detail specific contract terms such as duration, payment schedules, SLAs, penalties, termination clauses, or IP ownership. Standard public sector contract terms would apply, including those related to Freedom of Information, data protection, and prompt payment. The Framework Member is required to maintain records for a minimum of six years after the expiry of the Framework Period.
9. Risks, red flags & unusuals
- Lack of Detail: The provided extract is heavily focused on technical drawings and insurance requirements, with significant gaps in crucial tender information such as the estimated value, procedure type, contract length, submission requirements, award criteria, and key dates. This suggests the extract is incomplete or preliminary.
- Insurance Requirements: The insurance requirements are clearly stated and substantial, particularly the €13 million Employers' Liability and €6.5 million Public Liability. This indicates a project with significant potential risk exposure.
- ESB Coordination: The extensive detail regarding ESB overhead and underground lines, including specific duct bank requirements and exclusion zones, highlights a critical dependency and potential risk area. Successful coordination and execution of these works will be paramount.
- Site Constraints: The presence of existing flood defence barriers, overhead power lines, and the Ollatrim River (Abhainn Chalatroma) indicates potential site complexities that will require careful management.
10. SME fit assessment
This tender is likely to be most suitable for small to medium-sized enterprises (SMEs) with a strong track record in civil engineering and infrastructure projects, particularly those involving road construction, drainage, and utility diversions.
- Credible Bidders: SMEs with demonstrated experience in managing projects of similar scale and complexity, possessing the required insurance levels, and capable of handling significant coordination with utility providers like ESB, would be well-positioned.
- Consortium/Sub-contracting: The documents do not explicitly state whether consortium bids or sub-contracting are permitted. However, given the scale of the insurance requirements, it is plausible that consortium bids might be encouraged or necessary for some SMEs to meet the financial and technical demands.
- Indicative Bid-Prep Effort: Without specific submission requirements or award criteria, estimating bid preparation effort is difficult. However, the detailed drawings and significant insurance requirements suggest a moderate to high effort, likely requiring several days of dedicated work for technical and commercial teams.
- Pwin Signal: The absence of information on the incumbent, previous winners, or a specific procurement procedure (e.g., framework agreement) makes it difficult to assess the Pwin (Probability of Winning) signal. The focus on detailed technical drawings suggests a technically demanding project.
11. Where to dig deeper
- Source RFT Filename(s): [Appendix 4 Drawings.pdf] (This appears to be a collection of drawings, not a full RFT).
- eTenders CFT ID: Not specified.
- Contact Email/Clarification Portal: Not specified.
- Most Important Attachments:
- Drawing 11393-2000 – General Arrangement Plan
- Drawing 11393-2001 – Constraints Map
- Drawing 11393-2002 – Proposed Alignment Layout
- Drawing 11393-2003 – Site Development Details
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,500,000
Scoring
Most Economically Advantageous Tender
Documents (52)
05 SPFA Lisbunny Pricing Document.pdf
158.9 KB · Pricing / BOQ / Schedule of Rates
05 SPFA Lisbunny Pricing Document.xlsx
67.0 KB · Pricing / BOQ / Schedule of Rates
05 Vol C Pricing Document.zip
207.6 KB · Pricing / BOQ / Schedule of Rates
07 Single Party Framework Agreement.zip
280.2 KB · Contract / Agreement / Terms
07 SPFA Lisbunny Link Road Single Party Framework.docx
86.9 KB · Contract / Agreement / Terms
07 SPFA Lisbunny Link Road Single Party Framework.pdf
214.0 KB · Contract / Agreement / Terms
MF_2.3_Collateral_Warranty_v1.2_14-10-2024.docx
45.3 KB · Contract / Agreement / Terms
Tipperary County Council Data Processing Agreement.docx
56.3 KB · Contract / Agreement / Terms
04 Vol B Form of Tender and Schedule.zip
566.0 KB · Form / Declaration / Certificate
MF_2.4_v1.1-25-11-2025.docx
33.1 KB · Form / Declaration / Certificate
MF_2.5_v1.1-25-11-2025.docx
33.3 KB · Form / Declaration / Certificate
Circular_05_2023_Initiatives to Assist SMEs in Public Procurement.pdf
483.7 KB · Other
Circular_17_2025_Updated Green Public Procurement Instructions for Public Sector Bodies.pdf
676.8 KB · Other
Decarbonisation Tipperary County Council.pdf
198.1 KB · Other
reducing-embodied-carbon-in-cement-and-concrete-through-public-procurement-in-ireland.pdf
5.0 MB · Other
TCC Procurement Procedures.pdf
601.8 KB · Other
Tipperary County Council Green Public Procurement Strategy 2024-2026.pdf
171.6 KB · Other
Tipperary County Council Public Lighting Policy 2022.pdf
642.3 KB · Other
01 Instructions to Tenderers.zip
436.5 KB
01 SPFA Lisbunny ITT.pdf
452.8 KB
02 Suitability Assessment.zip
718.4 KB
02.1 SPFA Lisbunny QC2-Part-1.pdf
562.3 KB
02.2 SPFA Lisbunny QC_Part_2.docx
59.4 KB
02.3 SPFA Lisbunny SAQ Appendix C - CV Template.docx
17.5 KB · Appendix / Annex
02.6 SPFA Lisbunny ESPD.docx
74.2 KB · ESPD (European Single Procurement Document)
03 SPFA Lisbunny Link Road Service Requirements.pdf
1.1 MB
03 Vol A Service Requirements.zip
1.1 MB
04 SPFA Lisbunny FTS.docx
193.6 KB
04 SPFA Lisbunny FTS.pdf
418.1 KB
06 Conditions and Model Forms.zip
254.5 KB
06 SPFA Lisbunny COE1_v2.j.docx
80.7 KB
08 Information Pack.zip
45.3 MB
AA_Screening.pdf
2.7 MB · Appendix / Annex
Appendix 1 Topo Survey.pdf
4.6 MB · Appendix / Annex
Appendix 2 GPR Survey.pdf
8.0 MB · Appendix / Annex
Appendix 3 GI Report.pdf
8.9 MB · Appendix / Annex
Appendix 4 Drawings.pdf
2.5 MB · Appendix / Annex
Appendix 5 Storm Water Analysis.pdf
246.7 KB · Appendix / Annex
Appendix 6 Stage 3 Flood Risk Assessment.pdf
3.6 MB · Appendix / Annex
Appendix 7 High Level Cost Report.pdf
525.4 KB · Appendix / Annex
Appendix 8 ESB Safety Letter.pdf
240.2 KB · Appendix / Annex
Appendix_B1.docx
16.6 KB · Appendix / Annex
Appendix_B3.docx
25.6 KB · Appendix / Annex
BPC 1 PSDP Designer.pdf
209.7 KB · Appendix / Annex
DSI-Environmentally-Friendly-Lighting-Guide-2-1.pdf
4.2 MB · Appendix / Annex
EcIA Technical Note.pdf
138.9 KB · Appendix / Annex
EIA_Screening_Report.pdf
793.2 KB · Appendix / Annex
Emails re Reports.pdf
109.6 KB · Clarification / Addendum
Feasibility Report - Lisbunny Industrial Estate No Appendices.pdf
3.0 MB · Appendix / Annex
Information Pack Table of Contents.pdf
88.4 KB · Appendix / Annex
MF_2.10_Reliance_Warranty_v1.0_09-02-2022.docx
47.6 KB
MF_2.1_Professional_Indemnity_09-02-2022.docx
40.5 KB · Insurance / Indemnity
Original notice text
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211. The proposed new extension is approximately 350 metres in length. Options for the upgrade of the existing L5146 are to be examined and designed within the brief also. The length of existing road potentially to be upgraded is approximately 550 metres. This tender is for the establishment of a Single Party Framework Agreement and the initial contract being for CWMF Stages (i) to (iii). Subsequent Stages may be called off from the Framework. See Service Requirements for further details .
AI analysis updated 13 hours, 31 minutes ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender