R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026
Deadline
16 Sep
16 Sep 2026
Deadline
16 Sep
Ground investigation services for the Droichead an Churraoin Road Realignment project in Co Donegal, under the Public Works Investigation Contract.
Ground investigation services for R250 road realignment project in Co Donegal
Bidder profile
Firms with specialised geotechnical ground investigation expertise, capable of meeting significant insurance requirements and managing fieldwork and reporting under a specific public works contract.
Risks & flags
- High Professional Indemnity excess (€70,000)
- Tenderer must specify Performance Bond percentage
- Potential overhead electricity lines on site
- Use of specific Public Works Investigation Contract
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Donegal County Council |
|---|---|
| Title | R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026 |
| CPV / category | not stated |
| Estimated value | not disclosed |
| Per-year | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Co Donegal, Ireland |
| Contract length | not stated |
| Submission deadline | 2026-09-16T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This contract requires the provision of ground investigation services for the Droichead an Churraoin Road Realignment project. The work will be conducted under the Office of Government Procurement's Public Works Investigation Contract, Document Reference FTS7 v.1.5. The investigation is anticipated to have a fieldwork duration of 4 weeks.
The contractor will be responsible for:
- Site Operations for Investigation: This phase includes all fieldwork necessary to conduct the ground investigation. The performance period for this task is 14 days, commencing after permission to start is granted. A daily rate of €750 applies for any delay beyond this period.
- Ground Investigation Factual Report (Draft): The contractor must issue a draft factual report detailing the findings of the investigation. The performance period for issuing the draft report is 14 days from the completion of site operations. A daily rate of €375 applies for delays beyond this period.
- Ground Investigation Factual Report (Final): The contractor is required to issue the final factual report. The performance period for the final report is 7 days from the issue of the draft report. A daily rate of €375 applies for delays beyond this period.
- Issue of Final Report: The final report is to be issued within 8 weeks following the Contract Date.
The contract also includes a retention element of 7% of the initial Contract Sum, payable 12 months after the Investigation is complete, provided clause 4.4 of the contract has been complied with.
The scope of work is governed by the Public Works Investigation Contract and associated documents, including "12276-Vol A - Scope". Specific attention must be paid to safety regulations, including the "Code of Practice for Avoiding Danger from Overhead Electricity Lines" and any requirements related to underground services.
3. Background & buyer context
This procurement is for ground investigation services related to the R250 – Droichead an Churraoin Road Realignment project. Donegal County Council is the contracting authority. The project falls under the remit of road infrastructure development within the county. The contract will utilise the Office of Government Procurement's Public Works Investigation Contract, indicating adherence to national public procurement standards. The specific drivers for this procurement are the need for detailed ground condition information to inform the design and construction of the road realignment.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered for this contract:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability Insurance: Minimum indemnity limit of €6,500,000 for any one event.
- Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event.
- Professional Indemnity Insurance: Minimum annual aggregate indemnity limit of €6,500,000.
- Certifications: Not specified for this tender.
- Past experience: Not specified for this tender.
- Personnel: A Site Agent who is a Geotechnical Engineer with a minimum of 5 years' experience is required.
- Geographic / facility constraints: Not specified for this tender.
Maximum levels of excess:
- Insurance of Investigation: €10,000
- Public Liability: €6,500
- Employer's Liability: €6,500
- Professional Indemnity: €70,000
5. Award criteria & scoring
The award criteria and scoring mechanism are not explicitly detailed in the provided documentation. However, the contract structure implies a standard public procurement process where the lowest compliant tender may be considered, or a combination of price and quality. The payment schedule indicates specific percentages of the Price allocated to different stages:
| Event | % of Price |
|---|---|
| Fieldwork complete | 40% |
| Draft report issued | 30% |
| Final report issued | 23% |
| 12 months after Investigation complete | 7% |
6. Submission requirements
Tenderers are required to submit their offer in accordance with the "Conditions of the Investigation Contract" and attached forms. Specific submission requirements include:
- Pricing Schedule: A detailed pricing schedule is to be provided, outlining the offer for the investigation.
- Declarations: Tenderers must provide necessary declarations, including bona fide status and tax clearance.
- Performance Bond: A performance bond is required. The percentage of the initial Contract Sum for this bond is to be specified by the tenderer, with default percentages of 10% up to investigation completion and 5% thereafter if not specified.
- Project Supervisor for Construction Stage: The contractor or a nominee may be required to act as the Project Supervisor for the Construction Stage.
- Tender Validity: The offer must remain valid for 180 days after the tender submission deadline, or for 21 days after any notice to terminate the tender, whichever is later.
7. Key dates & process
| Event | Date / Time |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Tender deadline | 2026-09-16T11:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
The contract will be based on the Office of Government Procurement's Public Works Investigation Contract, Document Reference FTS7 v.1.5. Key terms include:
- Contract Length: The investigation fieldwork is estimated at 4 weeks. A retention payment is due 12 months after investigation completion.
- Payment Terms: Payment is structured based on project milestones: 40% upon fieldwork completion, 30% upon draft report issue, 23% upon final report issue, and 7% retention after 12 months.
- Liquidated Damages: Specific daily rates are stipulated for delays in completing key tasks: €750 per day for site operations, €375 per day for draft report issuance, and €375 per day for final report issuance.
- Performance Bond: A performance bond is required, with tenderers to specify the percentage of the initial Contract Sum. Default percentages are 10% up to investigation completion and 5% thereafter if not specified.
- Arbitration: Disputes not resolved by agreement will be referred to the President of Engineers Ireland for arbitrator appointment.
- Sub-contracting: Not explicitly detailed, but the contractor may be required to act as Project Supervisor for the Construction Stage.
9. Risks, red flags & unusuals
- Insurance Excess: The maximum excess levels for various insurance types are specified, with a notable €70,000 maximum excess for Professional Indemnity insurance.
- Performance Bond Specification: Tenderers must specify the percentage for the performance bond, with default values applying if not provided.
- Overhead Electricity Lines: The tender documentation references the "Code of Practice for Avoiding Danger from Overhead Electricity Lines," indicating potential presence of such lines on or near the project site, requiring strict adherence to safety protocols.
- Tender Value Placeholder: The estimated value is listed as "not disclosed," which is common but requires bidders to price based on their assessment of the scope.
- Public Works Investigation Contract: Use of this specific contract form implies adherence to its established clauses and procedures, which may differ from other standard forms.
10. SME fit assessment
This tender is likely suitable for Small and Medium-sized Enterprises (SMEs) with specialised expertise in geotechnical ground investigations. The primary requirement is for a qualified Geotechnical Engineer with at least 5 years of experience to serve as Site Agent. While no specific turnover or past experience thresholds are stated, the insurance requirements, particularly the €6.5 million Professional Indemnity cover, may be a significant barrier for very small firms. Consortium bidding or subcontracting is not explicitly mentioned but is generally permissible in public sector tenders unless restricted. The bid preparation effort would involve understanding the Public Works Investigation Contract, detailing the investigation methodology, and accurately pricing the fieldwork and reporting stages, likely requiring several days of effort. The absence of an incumbent mention and the specific nature of ground investigation suggest a competitive field, but the insurance requirements will narrow the pool.
11. Where to dig deeper
- Source RFT Filename: R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026.zip
- eTenders CFT ID: Not specified in provided documents.
- Contact: Mr Gerard Kearney, Donegal County Council.
- Key Attachments:
- 12276 - Vol B - R150 GI - FTS..docx (Conditions of Contract and Forms)
- 12276-Vol A - Scope (Scope of Works)
- avoiding_danger_from_overhead_electricity_lines.pdf (Code of Practice)
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Named standards / methodologies
Scoring
Lowest Price
Documents (13)
11045 - Vol A Pt1 - R250 Droichead an Churraoin Ground Investigation - Specification.pdf
823.0 KB · Specification
Pricing Document.pdf
800.8 KB · Pricing / BOQ / Schedule of Rates
Vol C Pricing Document - R250.xlsx
16.6 KB · Pricing / BOQ / Schedule of Rates
R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026.zip
5.2 MB · Contract / Agreement / Terms
PW-CF7_Rates_of_Pay_and_Conditions_of_Employment_Certificate.doc
43.0 KB · Form / Declaration / Certificate
12276 - PSHP.pdf
544.2 KB
12276 - Vol B - R150 GI - FTS..docx
44.2 KB
avoiding_danger_from_overhead_electricity_lines.pdf
1.9 MB
Code_of_Practice_for_Working_in_the_Vicinity_of_the_Transmission_Network.pdf
627.0 KB
cop_avoiding_danger_from_underground_services_.pdf
837.3 KB
GI-SCOPE 01.pdf
274.5 KB
ITTW3_Invitation_to_Tender.pdf
159.8 KB
PW-CF7_Appointment_of_Project_Supervisor.doc
61.0 KB
Original notice text
The R250 – Droichead an Churraoin Road Realignment is located on the R250 Regional Road. The Droichead an Churraoin, located approximately 1.3 km west of Fintown, Co. Donegal is a narrow masonry arch structure with a span of 1.83 m and a width of 5.28 m. The bridge and its immediate approaches have been identified as a safety blackspot due to a combination of poor horizontal and vertical alignment, substandard cross-sectional width, and deteriorating pavement conditions. The western approach exhibits fatigue and alligator cracking, while the bridge itself has suffered parapet damage from vehicular impacts, compromising edge restraint and posing a significant hazard to road users. The purpose of this contract is to conduct the detailed ground investigation to progress the detailed design of the scheme. The GI will extend over the entire length of the proposed road development. Ground Investigation points will be carried out in the areas of the existing and new road construction with a number of trial pits to be carried out in green field sites. The objective of the ground investigation is to ascertain the ground and groundwater conditions that will be encountered along the route of the R250 – Droichead an Churraoin Road Realignment and to investigate anomalies which may be identified during the investigation.