Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026
Closed Construction & Civil Engineering Services SME Suitable Open

R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026

Deadline

16 Sep

Ground investigation services for the Droichead an Churraoin Road Realignment project in Co Donegal, under the Public Works Investigation Contract.

SME fit: Medium Bid effort: Medium 📍 Donegal

Ground investigation services for R250 road realignment project in Co Donegal

Bidder profile

Firms with specialised geotechnical ground investigation expertise, capable of meeting significant insurance requirements and managing fieldwork and reporting under a specific public works contract.

Risks & flags

  • High Professional Indemnity excess (€70,000)
  • Tenderer must specify Performance Bond percentage
  • Potential overhead electricity lines on site
  • Use of specific Public Works Investigation Contract

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Donegal County Council
Title R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026
CPV / category not stated
Estimated value not disclosed
Per-year not stated
Procedure type not stated
Lots not stated
Location Co Donegal, Ireland
Contract length not stated
Submission deadline 2026-09-16T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This contract requires the provision of ground investigation services for the Droichead an Churraoin Road Realignment project. The work will be conducted under the Office of Government Procurement's Public Works Investigation Contract, Document Reference FTS7 v.1.5. The investigation is anticipated to have a fieldwork duration of 4 weeks.

The contractor will be responsible for:

  • Site Operations for Investigation: This phase includes all fieldwork necessary to conduct the ground investigation. The performance period for this task is 14 days, commencing after permission to start is granted. A daily rate of €750 applies for any delay beyond this period.
  • Ground Investigation Factual Report (Draft): The contractor must issue a draft factual report detailing the findings of the investigation. The performance period for issuing the draft report is 14 days from the completion of site operations. A daily rate of €375 applies for delays beyond this period.
  • Ground Investigation Factual Report (Final): The contractor is required to issue the final factual report. The performance period for the final report is 7 days from the issue of the draft report. A daily rate of €375 applies for delays beyond this period.
  • Issue of Final Report: The final report is to be issued within 8 weeks following the Contract Date.

The contract also includes a retention element of 7% of the initial Contract Sum, payable 12 months after the Investigation is complete, provided clause 4.4 of the contract has been complied with.

The scope of work is governed by the Public Works Investigation Contract and associated documents, including "12276-Vol A - Scope". Specific attention must be paid to safety regulations, including the "Code of Practice for Avoiding Danger from Overhead Electricity Lines" and any requirements related to underground services.

3. Background & buyer context

This procurement is for ground investigation services related to the R250 – Droichead an Churraoin Road Realignment project. Donegal County Council is the contracting authority. The project falls under the remit of road infrastructure development within the county. The contract will utilise the Office of Government Procurement's Public Works Investigation Contract, indicating adherence to national public procurement standards. The specific drivers for this procurement are the need for detailed ground condition information to inform the design and construction of the road realignment.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered for this contract:

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Public Liability Insurance: Minimum indemnity limit of €6,500,000 for any one event.
  • Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event.
  • Professional Indemnity Insurance: Minimum annual aggregate indemnity limit of €6,500,000.
  • Certifications: Not specified for this tender.
  • Past experience: Not specified for this tender.
  • Personnel: A Site Agent who is a Geotechnical Engineer with a minimum of 5 years' experience is required.
  • Geographic / facility constraints: Not specified for this tender.

Maximum levels of excess:

  • Insurance of Investigation: €10,000
  • Public Liability: €6,500
  • Employer's Liability: €6,500
  • Professional Indemnity: €70,000

5. Award criteria & scoring

The award criteria and scoring mechanism are not explicitly detailed in the provided documentation. However, the contract structure implies a standard public procurement process where the lowest compliant tender may be considered, or a combination of price and quality. The payment schedule indicates specific percentages of the Price allocated to different stages:

Event % of Price
Fieldwork complete 40%
Draft report issued 30%
Final report issued 23%
12 months after Investigation complete 7%

6. Submission requirements

Tenderers are required to submit their offer in accordance with the "Conditions of the Investigation Contract" and attached forms. Specific submission requirements include:

  • Pricing Schedule: A detailed pricing schedule is to be provided, outlining the offer for the investigation.
  • Declarations: Tenderers must provide necessary declarations, including bona fide status and tax clearance.
  • Performance Bond: A performance bond is required. The percentage of the initial Contract Sum for this bond is to be specified by the tenderer, with default percentages of 10% up to investigation completion and 5% thereafter if not specified.
  • Project Supervisor for Construction Stage: The contractor or a nominee may be required to act as the Project Supervisor for the Construction Stage.
  • Tender Validity: The offer must remain valid for 180 days after the tender submission deadline, or for 21 days after any notice to terminate the tender, whichever is later.

7. Key dates & process

Event Date / Time
RFT issued not stated
Clarification deadline not stated
Tender deadline 2026-09-16T11:00:00+00:00
Expected award not stated
Contract start not stated
Go-live / mobilisation not stated

8. Contract terms that matter

The contract will be based on the Office of Government Procurement's Public Works Investigation Contract, Document Reference FTS7 v.1.5. Key terms include:

  • Contract Length: The investigation fieldwork is estimated at 4 weeks. A retention payment is due 12 months after investigation completion.
  • Payment Terms: Payment is structured based on project milestones: 40% upon fieldwork completion, 30% upon draft report issue, 23% upon final report issue, and 7% retention after 12 months.
  • Liquidated Damages: Specific daily rates are stipulated for delays in completing key tasks: €750 per day for site operations, €375 per day for draft report issuance, and €375 per day for final report issuance.
  • Performance Bond: A performance bond is required, with tenderers to specify the percentage of the initial Contract Sum. Default percentages are 10% up to investigation completion and 5% thereafter if not specified.
  • Arbitration: Disputes not resolved by agreement will be referred to the President of Engineers Ireland for arbitrator appointment.
  • Sub-contracting: Not explicitly detailed, but the contractor may be required to act as Project Supervisor for the Construction Stage.

9. Risks, red flags & unusuals

  • Insurance Excess: The maximum excess levels for various insurance types are specified, with a notable €70,000 maximum excess for Professional Indemnity insurance.
  • Performance Bond Specification: Tenderers must specify the percentage for the performance bond, with default values applying if not provided.
  • Overhead Electricity Lines: The tender documentation references the "Code of Practice for Avoiding Danger from Overhead Electricity Lines," indicating potential presence of such lines on or near the project site, requiring strict adherence to safety protocols.
  • Tender Value Placeholder: The estimated value is listed as "not disclosed," which is common but requires bidders to price based on their assessment of the scope.
  • Public Works Investigation Contract: Use of this specific contract form implies adherence to its established clauses and procedures, which may differ from other standard forms.

10. SME fit assessment

This tender is likely suitable for Small and Medium-sized Enterprises (SMEs) with specialised expertise in geotechnical ground investigations. The primary requirement is for a qualified Geotechnical Engineer with at least 5 years of experience to serve as Site Agent. While no specific turnover or past experience thresholds are stated, the insurance requirements, particularly the €6.5 million Professional Indemnity cover, may be a significant barrier for very small firms. Consortium bidding or subcontracting is not explicitly mentioned but is generally permissible in public sector tenders unless restricted. The bid preparation effort would involve understanding the Public Works Investigation Contract, detailing the investigation methodology, and accurately pricing the fieldwork and reporting stages, likely requiring several days of effort. The absence of an incumbent mention and the specific nature of ground investigation suggest a competitive field, but the insurance requirements will narrow the pool.

11. Where to dig deeper

  • Source RFT Filename: R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026.zip
  • eTenders CFT ID: Not specified in provided documents.
  • Contact: Mr Gerard Kearney, Donegal County Council.
  • Key Attachments:
  • 12276 - Vol B - R150 GI - FTS..docx (Conditions of Contract and Forms)
  • 12276-Vol A - Scope (Scope of Works)
  • avoiding_danger_from_overhead_electricity_lines.pdf (Code of Practice)

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€6,500,000

Named standards / methodologies

FTS7 v.1.5

Scoring

Lowest Price

Documents (13)

PDF

11045 - Vol A Pt1 - R250 Droichead an Churraoin Ground Investigation - Specification.pdf

823.0 KB · Specification

PDF

Pricing Document.pdf

800.8 KB · Pricing / BOQ / Schedule of Rates

XLSX

Vol C Pricing Document - R250.xlsx

16.6 KB · Pricing / BOQ / Schedule of Rates

ZIP

R250 – Droichead an Churraoin Road Realignment Ground Investigation Contract 2026.zip

5.2 MB · Contract / Agreement / Terms

DOC

PW-CF7_Rates_of_Pay_and_Conditions_of_Employment_Certificate.doc

43.0 KB · Form / Declaration / Certificate

PDF

12276 - PSHP.pdf

544.2 KB

DOCX

12276 - Vol B - R150 GI - FTS..docx

44.2 KB

PDF

avoiding_danger_from_overhead_electricity_lines.pdf

1.9 MB

PDF

Code_of_Practice_for_Working_in_the_Vicinity_of_the_Transmission_Network.pdf

627.0 KB

PDF

cop_avoiding_danger_from_underground_services_.pdf

837.3 KB

PDF

GI-SCOPE 01.pdf

274.5 KB

PDF

ITTW3_Invitation_to_Tender.pdf

159.8 KB

DOC

PW-CF7_Appointment_of_Project_Supervisor.doc

61.0 KB

Original notice text

The R250 – Droichead an Churraoin Road Realignment is located on the R250 Regional Road. The Droichead an Churraoin, located approximately 1.3 km west of Fintown, Co. Donegal is a narrow masonry arch structure with a span of 1.83 m and a width of 5.28 m. The bridge and its immediate approaches have been identified as a safety blackspot due to a combination of poor horizontal and vertical alignment, substandard cross-sectional width, and deteriorating pavement conditions. The western approach exhibits fatigue and alligator cracking, while the bridge itself has suffered parapet damage from vehicular impacts, compromising edge restraint and posing a significant hazard to road users. The purpose of this contract is to conduct the detailed ground investigation to progress the detailed design of the scheme. The GI will extend over the entire length of the proposed road development. Ground Investigation points will be carried out in the areas of the existing and new road construction with a number of trial pits to be carried out in green field sites. The objective of the ground investigation is to ascertain the ground and groundwater conditions that will be encountered along the route of the R250 – Droichead an Churraoin Road Realignment and to investigate anomalies which may be identified during the investigation.

AI analysis updated 2 days, 13 hours ago

Bid ↗
Details

Deadline

16 Sep

View on eTenders ↗

Location

Co Donegal, Ireland

Procedure

Open

eTenders ID

8916800

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender