Curramore (Ballinrobe) GWS Interconnector to Uisce Éireann Watermain and Taking in Charge Works
Deadline
17 Sep
17 Sep 2026
Deadline
17 Sep
Installation of 2,287m of 110mm OD PE100 SDR17 watermain to interconnect Curramore (Ballinrobe) Group Water Scheme to Uisce Éireann watermain, plus taking-in-charge works. Contract completion required within 12 weeks of commencement on site.
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
Buyer Mayo County Council
Documents (8)
25136 - Tender Drawings.pdf
10.1 MB · Drawing / Plan / Layout
25136 - SD.pdf
61.8 MB
Book 1.pdf
68.3 MB
Book 2.pdf
4.8 MB
Book 3.pdf
2.0 MB
Book 4.pdf
4.2 MB
eESPD.docx
63.1 KB · ESPD (European Single Procurement Document)
OneDrive_2_19-8-2026.zip
151.2 MB
Original notice text
The project involves installation of 2287m of 110mm OD PE100 SDR17 main to connect Curramore (Ballinrobe) Group Water Scheme to Uisce Éireann,2020m of distribution pipe 63mm OD PE80 SDR11 main to replace the existing pipes, including the installation of new valves, fittings, 4 new bulk meters and 45 connections to new and existing pipes. Installation of valves and fittings on the existing Curramore (Ballinrobe) Group Water Scheme network.
AI analysis updated 1 day, 13 hours ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender