Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / VD 01/26 Midlands Trail Network - Iroko Timber Supply
Closed Office Supplies & Equipment Supplies Open

VD 01/26 Midlands Trail Network - Iroko Timber Supply

Deadline

25 May

Supply of Iroko timber for the Midlands Trail Network project

SME fit: Medium Bid effort: Medium 📍 Offaly

Supply of Iroko timber for the Midlands Trail Network project

Bidder profile

This tender is suitable for SMEs or contractors with experience in compliance-driven supply contracts.

Risks & flags

  • Compliance requirements
  • Insurance thresholds
  • Submission deadlines

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Bord na Móna PLC
Title VD 01/26 Midlands Trail Network - Iroko Timber Supply
CPV / category Office Supplies & Equipment
Estimated value not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-25T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought office supplies & equipment under the title "VD 01/26 Midlands Trail Network - Iroko Timber Supply" for Bord na Móna PLC. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included €13,000,000, €6,500,000, 12 months, 45 days, 30 days, 28 days.

Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public/Product Liability €6,500,000 Motor Insurance Only required if Tendere. €13,000,000. €6,500,000 Motor Insurance. Acceptable – Meets or exceeds minimum requirements. Minimum requirements. * If treatment is proposed, align to EN 335/EN 599‑1 and confirm re‑treatment of all cut ends.

3. Background & buyer context

The process was run by Bord na Móna PLC with deadline recorded as 2026-05-25T11:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public/Product Liability €6,500,000 Motor Insurance Only required if Tendere; €13,000,000; €6,500,000 Motor Insurance; Acceptable – Meets or exceeds minimum requirements; minimum requirements. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value not disclosed (eTenders placeholder). Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public/Product Liability €6,500,000 Motor Insurance Only required if Tendere; €13,000,000; €6,500,000 Motor Insurance; Acceptable – Meets or exceeds minimum requirements; minimum requirements; * If treatment is proposed, align to EN 335/EN 599‑1 and confirm re‑treatment of all cut ends. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-25T11:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: 7a5ae72d-3e25-47c3-8a22-e974186e3025.

Can you bid?

Required certifications

  • ISO 14001

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (4)

PDF

BNM RFT 7801781 Midlands Trail Network- Iroko Timber supply.pdf

970.7 KB · RFT / Invitation to Tender

DOCX

Editable Appendices BNM RFT 7801781 Midlands Trail Network- Iroko Timber supply.docx

522.3 KB · RFT / Invitation to Tender

PDF

PC_Supply of Iroko Timber_ EUJTF Midlands Trail Network_RFT_.pdf

337.5 KB · RFT / Invitation to Tender

PDF

Appendix 7 2026 03 Bench Fab Drawings (1).pdf

1.3 MB · Appendix / Annex

Original notice text

Supply of planed iroko timber sections for use in bench fabrication for the Midlands Trail Network project. The Contractor shall supply and deliver high‑quality hardwood timber components for use in public‑realm street‑furniture benches at amenity sites. Materials Specification: Finished Dimensions Bench Materials Bike Rack Materials Thickness (planed) 25mm 38mm Width 200mm 150mm Length 2400mm 787mm No. required 1100 No. 200 No.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Deadline

25 May

View on eTenders ↗

Location

Midlands Trail Network area

Procedure

Open

Clarification

25 May 2026

eTenders ID

7801781

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender