Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
Deadline
20 Aug
20 Aug 2026
Deadline
20 Aug
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy Services for the upgrade and expansion of the National Biorefinery Pilot Project (NBPP) building at Lisheen, Co. Tipperary, including all design, coordination, statutory approvals, and construction supervision within a live operational facility.
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
Buyer Tipperary County Council
Documents (49)
016 P+U - Lisheen WWTP - Vol A1.1 - C& S Specification.docx
219.0 KB · Specification
016 P+U - Lisheen WWTP - Vol A1.1 - C& S Specification.pdf
1.0 MB · Specification
05 Vol C Pricing Document.zip
95.1 KB · Pricing / BOQ / Schedule of Rates
Lisheen-Pricing MDT.xlsx
138.5 KB · Pricing / BOQ / Schedule of Rates
04 Vol B Form of Tender and Schedules.zip
463.8 KB · Form / Declaration / Certificate
MF-2.1-09-02-2022-PI Insurance Certificate.docx
40.5 KB · Form / Declaration / Certificate
MF_2.4-H&S Compliance Declaration by all General Service Providers.docx
21.5 KB · Form / Declaration / Certificate
MF_2.5-H&S Compliance Declaration by PSDP.docx
21.3 KB · Form / Declaration / Certificate
0016-P+U-XX-CE-C-0010-R01-Existing Site Layout.pdf
367.7 KB · Drawing / Plan / Layout
0016-P+U-XX-CE-C-0110-R02-Proposed Site Layout.pdf
462.4 KB · Drawing / Plan / Layout
0016-P+U-XX-CE-C-0001-R01-Site Location Map.pdf
558.8 KB
0016-P+U-XX-CE-C-0200-R01-Proposed Wastewater Section.pdf
331.7 KB
0016-P+U-XX-CE-C-0201-R02-Proposed Process Water Section.pdf
329.8 KB
0016-P+U-XX-CE-C-0300-R02-Proposed Wastewater Details Sheet 1 of 2.pdf
449.5 KB
0016-P+U-XX-CE-C-0301-R01-Proposed Wastewater Details Sheet 2 of 2.pdf
545.9 KB
0016-P+U-XX-CE-C-0302-R01-Proposed Treatment System Details.pdf
283.2 KB
0016-P+U-XX-CE-C-0303-R01-Proposed Process Water Tank Details.pdf
280.4 KB
0016-P+U-XX-CE-C-0304-R01-Proposed Raised Sand Filter Details.pdf
466.0 KB
0016-P+U-XX-CE-C-0305-R01-Proposed Treatment System Details.pdf
245.0 KB
01 Instructions to Tenderers.zip
591.3 KB
016 P+U - Lisheen WWTP - Vol A1.2 - WWTP Specfication.pdf
719.4 KB
016-P+U-XX-CE-Tender Issue Reg 251120.pdf
115.4 KB
02 Suitability Assessment.zip
691.5 KB
03 Vol A Service Requirements.zip
260.9 KB
03.2-QC-Part-2-v1.1-04-11-2024-NBPP Rev 2.docx
59.7 KB
04-FTS9 MK NBPP.pdf
523.7 KB
06 Conditions and Model Forms.zip
330.3 KB
07 Additional Info.zip
23.9 MB
Appendix-B1-QC1-and-QC2-09-02-2022.docx
16.6 KB · Appendix / Annex
Appendix-B3-QC1-and-QC2-09-02-2022.docx
16.7 KB · Appendix / Annex
BPC 1 PSDP Designer.pdf
209.7 KB
buying-greener-green-public-procurement-strategy-and-action-plan-2024-2027.pdf
11.7 MB
Circular_05_2023_Initiatives to Assist SMEs in Public Procurement.pdf
483.7 KB
Circular_17_2025_Updated Green Public Procurement Instructions for Public Sector Bodies.pdf
676.8 KB
COE1_v2.j_Consultancy_Technical_30-09-2024.docx
81.1 KB
Decarbonisation Tipperary County Council.pdf
198.1 KB
ESPD.docx
75.4 KB · ESPD (European Single Procurement Document)
ITT_S2b MK.pdf
667.9 KB
MF-2.10-09-02-2022.docx
47.6 KB
MF-2.3-v1.2-14-10-2024 - Collateral Warranty for Sub-consultants.docx
45.3 KB
MF-2.7-09-02-2022.docx
28.6 KB
MF-2.8-09-02-2022.docx
22.3 KB
MF-2.9-09-02-2022.docx
55.1 KB
NBPP Planning links.docx
19.9 KB
NBPP Service requirments.pdf
287.3 KB
QC2-Part-1_v3.2-25-11-2025 MKT.pdf
557.2 KB
reducing-embodied-carbon-in-cement-and-concrete-through-public-procurement-in-ireland.pdf
5.0 MB
TCC Procurement Procedures.pdf
601.8 KB
Tipperary County Council Green Public Procurement Strategy 2024-2026.pdf
171.6 KB
Original notice text
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (“live”) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant’s Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost- effective solution in accordance with the Client’s requirements and applicable statutory standards
AI analysis updated 4 weeks, 1 day ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender