R392 Pedestrian and Cycle Improvement Active Travel Scheme Ballymahon
Deadline
03 Jun
03 Jun 2026
Deadline
03 Jun
Pedestrian and cycle infrastructure improvements along R392 in Ballymahon.
Pedestrian and cycle infrastructure improvements along R392 in Ballymahon.
Bidder profile
Suitable for SMEs with experience in roadworks and a turnover exceeding €600,000. Firms should have a strong track record in similar projects and the ability to meet the insurance requirements.
Risks & flags
- Turnover requirement close to project value
- Geographic focus may limit bidders
- Absence of detailed KPIs and SLAs
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Longford County Council |
|---|---|
| Title | R392 Pedestrian and Cycle Improvement Active Travel Scheme Ballymahon |
| CPV / category | Transport & Fleet |
| Estimated value | not disclosed |
| Per-year | not stated |
| Procedure type | Open Procedure |
| Lots | Not stated |
| Location | Ballymahon, Co Longford |
| Contract length | 10 months for works, plus 12-month maintenance |
| Submission deadline | 2026-06-03 15:00:00 |
| Go-live / start | Not stated |
2. Scope of Work
The R392 Pedestrian and Cycle Improvement Active Travel Scheme in Ballymahon involves significant enhancements to pedestrian and cycling infrastructure. The contractor will undertake various activities to improve safety and accessibility along the R392 route.
- Construction Activities: Includes roadworks on public roads, installation of pedestrian and cycle paths, and associated civil engineering tasks.
- Traffic Management: Implementation of temporary traffic management systems to ensure safety during construction.
- Site Locations: Work primarily along the R392 in Ballymahon, Co Longford.
- Volume of Work: The project involves significant roadworks, with a focus on enhancing pedestrian and cycle paths.
- Compliance: Adherence to IS EN 1917, BS 5911-6, and other relevant standards.
- Phases: The project is divided into construction and a subsequent 12-month maintenance phase.
- Environmental Considerations: Compliance with environmental regulations and minimization of disruption to local ecosystems.
- Safety Measures: Installation of safety barriers and signage in accordance with EN 12899-1.
- Coordination with Utilities: Management of existing services and coordination with utility providers for any necessary relocations or adjustments.
3. Background & buyer context
This tender is part of Longford County Council's initiative to promote active travel and improve infrastructure for pedestrians and cyclists. The project aligns with national and local policies aimed at enhancing sustainable transport options and reducing carbon emissions. The scheme is funded under the Government's Active Travel program, which supports infrastructure projects that encourage walking and cycling. The current infrastructure is outdated, necessitating upgrades to meet modern safety and accessibility standards. The project is strategically important for improving local transport links and supporting community health and wellbeing.
4. Eligibility & selection criteria
- Turnover requirement: Minimum yearly turnover of €600,000 in roadworks on public roads.
- Insurance:
- Public Liability: €6,500,000 per accident.
- Employer's Liability: €13,000,000 per accident.
- Certifications: Not specified for this tender.
- Past experience: Evidence of at least three road construction projects completed in the last five years, each with a value of at least €600,000.
- Personnel: At least one member of the project management team must have 15 years of experience in civil engineering, with a minimum of 8 years on public roads.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
| Criterion | Weight (%) | Sub-criteria | Pass/fail thresholds |
|---|---|---|---|
| Quality of Proposal | 60% | Methodology, innovation, risk management | Not specified |
| Price | 40% | Cost-effectiveness, value for money | Not specified |
The evaluation follows the Most Economically Advantageous Tender (MEAT) principle, with a 60/40 quality to price split.
6. Submission requirements
- Method statement / response document: No named template, page limits not specified.
- CVs: Required for key personnel, no page count specified.
- Pricing schedule: Must be submitted in the provided format.
- Case studies: Minimum of three, each with a value of at least €600,000.
- Declarations: ESPD, Bona Fides, Tax clearance, Conflict of Interest.
- Mandatory site visit: Not specified.
- Submission portal: eTenders, with specific format rules for electronic submission.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | Not specified |
| Clarification deadline | Not specified |
| Mandatory site visit | Not specified |
| Tender deadline | 2026-06-03 15:00:00 |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
The contract is structured for a 10-month construction period followed by a 12-month maintenance phase. Payment terms are not specified. Key performance indicators (KPIs) and service level agreements (SLAs) are not detailed. Liquidated damages are implied but not quantified. Termination clauses and intellectual property ownership are not specified. Sub-contracting is allowed, but no parent-company guarantee or bond requirements are mentioned.
9. Risks, red flags & unusuals
The turnover requirement of €600,000 is close to the typical project value, potentially favoring incumbents or larger firms. The geographic focus on Ballymahon may limit the pool of bidders to those with local experience. The absence of detailed KPIs and SLAs could lead to ambiguities in performance expectations. The requirement for significant past experience in roadworks may exclude newer firms.
10. SME fit assessment
This tender is suitable for small to medium-sized enterprises (SMEs) with experience in roadworks and a turnover exceeding €600,000. Firms should have a strong track record in similar projects and the ability to meet the insurance requirements. Consortium bids and sub-contracting are allowed, which may benefit smaller firms. Bid preparation is likely to require several days of effort, given the need for detailed documentation and case studies. The presence of an incumbent or a limited bidder pool could affect the probability of winning (Pwin).
11. Where to dig deeper
- Source RFT filename(s): ITTW2-v3.1-25-11-2025-R1.pdf
- eTenders CFT ID: Not specified
- Contact email or clarification portal: eTenders platform
- Important attachments:
- Volume A: Works Requirements
- Volume B: Form of Tender and Schedule
- Volume C: Pricing Document
Can you bid?
Minimum turnover
€600,000
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (27)
MUL2204_Longford Co Council_Ballymahon_Rev0.pdf
4.3 MB · Specification
Volume A Works Requirements Part 1 R0.pdf
4.8 MB · Specification
Volume A Works Requirements Part 2 R0.pdf
18.1 MB · Specification
ITTW2-v3.1-25-11-2025-R1.pdf
438.8 KB · RFT / Invitation to Tender
Volume C Pricing Document R1.pdf
486.7 KB · Pricing / BOQ / Schedule of Rates
Volume C Pricing Document R1.xlsx
914.9 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.9 KB · Contract / Agreement / Terms
MF1.16_Model_Form_21-03-2016.docx
54.1 KB · Contract / Agreement / Terms
MF1.4_Model_Form_03-08-2010.docx
53.1 KB · Contract / Agreement / Terms
MF_1.10_v1.3_25-11-2025.docx
53.7 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.9 KB · Form / Declaration / Certificate
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
41.0 KB · Form / Declaration / Certificate
MF1.13_Model_Form_09-04-2020.docx
46.0 KB · Form / Declaration / Certificate
Ballymahon Active Travel Scheme A3 Drawing-R1.pdf
506.2 KB · Drawing / Plan / Layout
LCC Ballymahon Map - ESB.pdf
100.0 KB · Drawing / Plan / Layout
MG 02555-2 Topo Survey.pdf
264.6 KB · Drawing / Plan / Layout
Preliminary Health and Safety Plan R0.pdf
493.2 KB · Other
Appendix 1 Forms_of_undertaking.docx
91.3 KB · Appendix / Annex
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
32.8 KB · Appendix / Annex
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
26.8 KB · Appendix / Annex
Invitation to Tender_Letter.pdf
63.1 KB
MF1.6_Model_Form_09-04-2020.docx
55.6 KB · Insurance / Indemnity
MF1.7_Model_Form_18-07-2023.docx
59.4 KB · Insurance / Indemnity
QW2_Part_1_v2.2_25-11-2025.docx
193.3 KB · ESPD (European Single Procurement Document)
QW_Part_2_v1.1_18-11-2024.docx
58.4 KB · Tender Response Template
Volume B Tender and Schedule R0.docx
99.6 KB · Appendix / Annex
Original notice text
The Project will include segregated pedestrian and cycle facilities for approximately 350m along the R392 between Saint Matthew's National School and Moygh Road Junction (L1128). Widening of existing footpaths, junction tightening, provision of a new ramped zebra crossing in front of the Ballymahon Vocational School will be provided. The works will also include the construction of a new boundary wall, additional signage and road markings.