Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Mechanical_Electrical Contractor (includes PSCS) - Refurbishment of toilet facilities - 3 Tipperary FET Colleges
Closed Construction & Civil Engineering Works Open

Mechanical_Electrical Contractor (includes PSCS) - Refurbishment of toilet facilities - 3 Tipperary FET Colleges

Deadline

17 Aug

Seeking a Mechanical and Electrical Contractor, also acting as PSCS, for toilet facility refurbishments across three Tipperary FET Colleges.

SME fit: Medium Bid effort: Medium 📍 Tipperary

M&E Contractor and PSCS for toilet facility refurbishment at 3 Tipperary FET Colleges

Bidder profile

Suitable for contractors with experience in mechanical and electrical installations for building refurbishments, particularly in public sector or educational settings, and capable of fulfilling PSCS responsibilities.

Risks & flags

  • Coordination across three sites
  • PSCS responsibilities
  • Green Public Procurement requirements
  • Meeting GPP templates and SEAI Triple E Register compliance

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Tipperary Education and Training Board
Title Mechanical_Electrical Contractor (includes PSCS) - Refurbishment of toilet facilities - 3 Tipperary FET Colleges
CPV / category not stated
Estimated value not disclosed
Per-year (if multi-year) not stated
Procedure type not stated
Lots 1
Location Cappawhite, Clonmel, Roscrea, Co. Tipperary
Contract length not stated
Submission deadline 2026-08-17T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This tender seeks a Mechanical and Electrical Contractor, also acting as Project Supervisor Construction Stage (PSCS), for the refurbishment of toilet facilities across three Tipperary Further Education and Training (FET) Colleges. The project encompasses works at Cappawhite FET College (E34 A320), CTI Clonmel (E91 K2E2), and Roscrea FET College (E53 P797).

The contractor's responsibilities include:

  • Mechanical and Electrical Services: Undertaking all necessary mechanical and electrical installations, upgrades, and refurbishments within the toilet facilities at the specified locations. This will involve the integration of new systems and the modification or replacement of existing ones to meet current standards and functional requirements.
  • Project Supervision (PSCS): Acting as the Project Supervisor Construction Stage, the contractor will be responsible for managing and coordinating health and safety during the construction phase. This includes planning, managing, monitoring, and coordinating the health and safety aspects of the construction work, ensuring compliance with the Safety, Health and Welfare at Work (Construction) Regulations 2013.
  • Site-Specific Works: The scope covers refurbishment of toilet facilities at three distinct locations:
  • Tipperary FET College, Cappawhite, Co. Tipperary (E34 A320)
  • CTI Clonmel, Co. Tipperary (E91 K2E2)
  • Roscrea FET College, Co. Tipperary (E53 P797)
  • Ancillary Works: While the primary focus is mechanical and electrical services for toilet refurbishments, the contractor will also be responsible for associated works required to complete the project, including ensuring all systems are fully functional and compliant.
  • Compliance and Documentation: Ensuring all works comply with relevant Irish building regulations, standards, and the specific requirements outlined in the tender documents. This includes providing necessary documentation, certifications, and potentially participating in maintenance and warranty demonstrations as detailed in the provided schedules.
  • Green Public Procurement (GPP): Adhering to Green Public Procurement policies, which mandate the use of SEAI Triple E Register compliant products where applicable and the tracking of embodied carbon for construction materials. This includes completing specific GPP templates related to energy efficiency and low carbon materials.

The tender documents indicate a need for detailed maintenance and warranty schedules to be completed by the successful contractor for all installed equipment.

3. Background & buyer context

This procurement is initiated by Tipperary Education and Training Board (TETB) to address the refurbishment of toilet facilities across three of its FET Colleges. The project aligns with national policy drivers for improving educational infrastructure and potentially with broader initiatives related to the School Sector Climate Action Mandate and technological advancements in education. The need for updated facilities suggests a drive to enhance the learning environment and ensure compliance with current health, safety, and accessibility standards. The tender documents do not explicitly name an incumbent contractor for these specific M&E services, but the requirement for detailed maintenance schedules implies a focus on long-term operational efficiency and asset management post-completion.

4. Eligibility & selection criteria

  • Turnover requirement: Bidders must provide evidence of turnover for the previous three financial years, demonstrating a minimum average annual turnover of €1 million arising from general construction work.
  • Insurance:
  • Public Liability Insurance: Minimum €6,500,000 per accident.
  • Employer's Liability Insurance: Minimum €13,000,000 per accident.
  • Contractors All Risk Insurance: Required, no minimum stated.
  • Professional Indemnity Insurance: Minimum €1,000,000 per claim. Maximum permissible excess is the greater of 2% of annual turnover or €5,000.
  • Certifications:
  • Safe-T-Cert certification is mentioned as potentially equivalent for quality control purposes.
  • ISO 14001 is listed as a preferred third-party certification for environmental management.
  • Environmental Product Declarations (EPDs) are required per EN 15804 or equivalent.
  • Past experience: Bidders must provide a list of completed projects similar in nature and complexity to the works required. Evidence must be provided in the format of Appendix B1 (List of Previous Works Projects) and Appendix B2 (Certificate of Satisfactory Execution). Specific health and safety evidence includes providing examples of Safety and Health Plans from three previous completed projects.
  • Personnel:
  • Management staff must possess appropriate educational/professional qualifications and experience, including Health and Safety qualifications, training, and experience relevant to the works.
  • Personnel must have appropriate educational and professional qualifications and experience, including Health and Safety qualifications, training, and experience relevant to the works.
  • The successful tenderer will be assessed by the PSDP using the Health & Safety Authority template BPC 2 for health and safety competency.
  • Geographic / facility constraints: Not specified for this tender.

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria

Can you bid?

Required certifications

  • Safe-T-Cert
  • ISO 14001

Minimum turnover

€1,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Named standards / methodologies

EN 15804Safety, Health and Welfare at Work (Construction) Regulations 2013

Lots (1)

Lot : Mechanical_Electrical Contractor (includes PSCS) - Refurbishment of toilet facilities - 3 Tipperary FET Colleges

Documents (88)

PDF

18603-200-S3 - Mechanical Scope of Works - Volume A2.3 - T1.pdf

221.5 KB · Specification

PDF

18603-300-S3 - Electrical Scope of works - Volume A3.3 - T1.pdf

206.9 KB · Specification

DOCX

25228-SP-ZZ-ZZ-RP-A-0002.docx

203.4 KB · Specification

PDF

Specifications-Door Jamb and Head details_25228-SP-XX-XX-DR-AT-506.pdf

206.5 KB · Specification

PDF

Specifications-Glazing Specification_25228-SP-ZZ-ZZ-SP-A-0004.pdf

244.9 KB · Specification

PDF

Specifications-Internal Specification_25228-SP-ZZ-ZZ-SP-A-0003.pdf

350.4 KB · Specification

PDF

Specifications-Proposed Door Schedule_25228-SP-XX-XX-DR-AT-600.pdf

674.5 KB · Specification

PDF

Specifications-Proposed Wall type details.pdf

257.5 KB · Specification

PDF

Specifications-Proposed Window Schedule_25228-SP-XX-XX-DR-AT-601.pdf

280.3 KB · Specification

PDF

Specifications-Sanitaryware Schedule ver 1.1.pdf

233.3 KB · Specification

PDF

Specifications-Typical Standard & Ambulant room Data-25228-SP-XX-XX-DR-IA-805.pdf

190.0 KB · Specification

PDF

Specifications-Windows Specification_25228-SP-ZZ-ZZ-SP-A-0006.pdf

777.8 KB · Specification

PDF

ITTW4.pdf

542.1 KB · RFT / Invitation to Tender

PDF

25228-SP-ZZ-ZZ-RP-A-0002_Pricing Document.pdf

243.7 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor-v3.0-28-07-2023.docx

52.1 KB · Contract / Agreement / Terms

PDF

Tipperary ETB_Contractor Letter of Invitation.pdf

338.5 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS-v3.0-28-07-2023.docx

46.3 KB · Form / Declaration / Certificate

DOCX

Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

41.1 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

29.4 KB · Form / Declaration / Certificate

DOCX

Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

28.2 KB · Form / Declaration / Certificate

DOCX

Form of Tender and Schedule.docx

60.4 KB · Form / Declaration / Certificate

DOCX

MF-1.22-09-04-2020 (PSCS Appointment Form) - Information only.docx

34.2 KB · Form / Declaration / Certificate

DOCX

QW-Part-2-v1.1-18-11-2024.docx

64.4 KB · Form / Declaration / Certificate

DOCX

QW2_Part_1_v2.2_25-11-2025 (2).docx

195.3 KB · Form / Declaration / Certificate

PDF

Cappawhite-Proposed Electrical floor plan-25228-SP-XX-XX-DR-IA-270.pdf

165.9 KB · Drawing / Plan / Layout

PDF

Cappawhite-Proposed floor plan-25228-SP-XX-XX-DR-IA-800.pdf

206.1 KB · Drawing / Plan / Layout

PDF

Cappawhite_Demolition_Floor Plan-25228-SP-XX-XX-DR-AT-210.pdf

160.2 KB · Drawing / Plan / Layout

PDF

Cappawhite_Existing Ceiling Plan25228-SP-XX-XX-DR-IA-280.pdf

156.4 KB · Drawing / Plan / Layout

PDF

Cappawhite_Existing Floor Plan_25228-SP-XX-XX-DR-IA-200.pdf

155.6 KB · Drawing / Plan / Layout

PDF

Cappawhite_Existing Mech Floor Plan-25228-SP-XX-XX-DR-IA-290.pdf

157.9 KB · Drawing / Plan / Layout

PDF

Cappawhite_Proposed Ceiling Plan-25228-SP-XX-XX-DR-IA-230.pdf

258.6 KB · Drawing / Plan / Layout

PDF

Cappawhite_proposed floor plan-25228-SP-XX-XX-DR-IA-220.pdf

160.5 KB · Drawing / Plan / Layout

PDF

Cappawhite_Proposed Mech. Ceiling Plan_25228-SP-XX-XX-DR-IA-260.pdf

259.3 KB · Drawing / Plan / Layout

PDF

Cappawhite_Proposed Mechanical Plan-25228-SP-XX-XX-DR-AT-250.pdf

253.8 KB · Drawing / Plan / Layout

PDF

Cappawhite_Wall Floor Finishes_25228-SP-XX-XX-DR-IA-240.pdf

161.7 KB · Drawing / Plan / Layout

PDF

CTI 1st Floor Wall Floor Finishes-25228-SP-XX-XX-DR-IA-243.pdf

193.7 KB · Drawing / Plan / Layout

PDF

CTI- Universal Accessible toilet-Cleaners store-25228-SP-XX-XX-DR-IA-804.pdf

240.5 KB · Drawing / Plan / Layout

PDF

CTI-1st floor Mech Ceiling plan25228-SP-XX-XX-DR-IA-263.pdf

265.2 KB · Drawing / Plan / Layout

PDF

CTI-1st Floor Proposed Electrical Plan_25228-SP-XX-XX-DR-IA-273.pdf

197.4 KB · Drawing / Plan / Layout

PDF

CTI-1st Floor-Existing Ceiling Plan_25228-SP-XX-XX-DR-IA-283.pdf

159.5 KB · Drawing / Plan / Layout

PDF

CTI-Ground Floor Wall floor Finishes-25228-SP-XX-XX-DR-IA-242.pdf

211.7 KB · Drawing / Plan / Layout

PDF

CTI-Ground Floor-Mech Ceiling plan-25228-SP-XX-XX-DR-IA-262.pdf

267.3 KB · Drawing / Plan / Layout

PDF

CTI-Ground Floor_Classroom Room Data Sheet-25228-SP-XX-XX-DR-IA-806.pdf

195.4 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor Demolition plan-25228-SP-XX-XX-DR-AT-213.pdf

170.3 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor Existing Plan_25228-SP-XX-XX-DR-IA-203.pdf

159.3 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor Proposed Plan_25228-SP-XX-XX-DR-IA-223.pdf

187.8 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor-Proposed Ceiling Plan-25228-SP-XX-XX-DR-IA-233.pdf

269.7 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor-Proposed Mechanical Plan-25228-SP-XX-XX-DR-AT-253.pdf

277.1 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor_Existing Plan-25228-SP-XX-XX-DR-IA-293.pdf

163.3 KB · Drawing / Plan / Layout

PDF

CTI_1st Floor_Proposed Room Data-25228-SP-XX-XX-DR-IA-803.pdf

197.2 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor Demolition Plan-25228-SP-XX-XX-DR-AT-213.pdf

170.1 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor Existing Plan_25228-SP-XX-XX-DR-IA-202.pdf

159.3 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor Proposed Mechanical Plan-25228-SP-XX-XX-DR-AT-252.pdf

310.0 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor Proposed Plan_25228-SP-XX-XX-DR-IA-222.pdf

203.5 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor- Proposed section-25228-SP-XX-XX-DR-IA-322.pdf

198.0 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor-Existing Ceiling Plan_25228-SP-XX-XX-DR-IA-282.pdf

159.7 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor-Existing Mech plan_25228-SP-XX-XX-DR-IA-292.pdf

162.0 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor-Proposed Ceiling Plan-25228-SP-XX-XX-DR-IA-232.pdf

276.1 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor-Proposed Electrical plan-25228-SP-XX-XX-DR-IA-272.pdf

210.0 KB · Drawing / Plan / Layout

PDF

CTI_Ground Floor-Proposed Room Data Sheet-25228-SP-XX-XX-DR-IA-802.pdf

222.1 KB · Drawing / Plan / Layout

PDF

CTI_proposed IPS panel-Vanity details-25228-SP-XX-XX-DR-IA-507.pdf

188.2 KB · Drawing / Plan / Layout

PDF

Drawing Register.pdf

219.0 KB · Drawing / Plan / Layout

PDF

Fire Stopping Details 1of 5_25228-SP-XX-XX-DR-AT-501.pdf

529.9 KB · Drawing / Plan / Layout

PDF

Fire stopping details 2 of 5_25228-SP-XX-XX-DR-AT-502.pdf

497.6 KB · Drawing / Plan / Layout

PDF

Fire Stopping details 3 of 5_25228-SP-XX-XX-DR-AT-503.pdf

528.9 KB · Drawing / Plan / Layout

PDF

Fire stopping details 4 of 5_25228-SP-XX-XX-DR-AT-504.pdf

554.1 KB · Drawing / Plan / Layout

PDF

Fire Stopping details 5 of 5_25228-SP-XX-XX-DR-AT-505.pdf

170.1 KB · Drawing / Plan / Layout

PDF

Roscrea_Ceiling Proposed Mech. Plan_25228-SP-XX-XX-DR-IA-261.pdf

265.7 KB · Drawing / Plan / Layout

PDF

Roscrea_Demolition Floor plan-25228-SP-XX-XX-DR-AT-211.pdf

163.4 KB · Drawing / Plan / Layout

PDF

Roscrea_Electrical Floor Plan-25228-SP-XX-XX-DR-IA-271.pdf

202.3 KB · Drawing / Plan / Layout

PDF

Roscrea_Existing Ceiling Plan-25228-SP-XX-XX-DR-IA-281.pdf

160.8 KB · Drawing / Plan / Layout

PDF

Roscrea_Existing Floor Plan_25228-SP-XX-XX-DR-IA-201.pdf

157.3 KB · Drawing / Plan / Layout

PDF

Roscrea_Existing Mech floor plan-25228-SP-XX-XX-DR-IA-291.pdf

159.7 KB · Drawing / Plan / Layout

PDF

Roscrea_Proposed Ceiling Plan_25228-SP-XX-XX-DR-IA-231.pdf

268.7 KB · Drawing / Plan / Layout

PDF

Roscrea_Proposed Floor Plan_25228-SP-XX-XX-DR-IA-221.pdf

195.8 KB · Drawing / Plan / Layout

PDF

Roscrea_Proposed Mechanical Plan-25228-SP-XX-XX-DR-AT-251.pdf

300.0 KB · Drawing / Plan / Layout

PDF

Roscrea_Proposed Toilet floor plan_25228-SP-XX-XX-DR-IA-801.pdf

215.0 KB · Drawing / Plan / Layout

PDF

Roscrea_Wall Floor Finishes-25228-SP-XX-XX-DR-IA-241.pdf

202.4 KB · Drawing / Plan / Layout

ZIP

CFT 7542781_Tender Documentation.zip

26.0 MB · Other

PDF

18603 - M&E Transmittal Sheet - 2026-03-30.pdf

344.2 KB · Appendix / Annex

DOCX

Appendix H - Green Public Procurement Templates.docx

307.7 KB · Appendix / Annex

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

34.8 KB · Appendix / Annex

PDF

Preliminary Health and Safety Plan.pdf

822.1 KB · Appendix / Annex

XLSX

Schedule of Maintenance & Warranties & Demonstrations.xlsx

23.3 KB · Appendix / Annex

PDF

Tipperary ETB Green Public Procurement Policy.pdf

306.3 KB · Appendix / Annex

PDF

Tipperary FET College Roscrea RDAS.pdf

2.4 MB · Appendix / Annex

PDF

Tips and hints for uploading tender responses.pdf

108.9 KB · Tender Response Template

PDF

Youthreach Cappawhite_14.11.2024.pdf

2.0 MB · Appendix / Annex

Original notice text

The renovation of toilet facilities in 3 Tipperary FET Colleges located in Cappawhite E34 A320 - CTI Clonmel E91 K2E2 and Roscrea E53 V449. This will include the removal and environmentally responsible disposal of existing hardware if indicated in the design, building work to accommodate redesigned areas, plumbing and electrical work, and the provision and installation of energy-efficient sanitary ware in the 3 sites as required.

AI analysis updated 1 month ago

Bid ↗
Details

Deadline

17 Aug

View on eTenders ↗

Location

Cappawhite FET College (E34 A320), CTI Clonmel (E91 K2E2), and Roscrea FET College (E53 P797), Co. Tipperary.

Procedure

Open

Clarification

17 Aug 2026

eTenders ID

7542781

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender