Carpark facility management and contract for the Installation, Operation, and Maintenance of EV Charging Infrastructure at Shelbourne Park Greyhound Stadium
Value
€2.2m
Deadline
07 Aug
07 Aug 2026
Value
€2.2m
Deadline
07 Aug
Management of carpark and installation of EV charging infrastructure at Shelbourne Park.
Management of carpark and installation of EV charging infrastructure at Shelbourne Park.
Bidder profile
Suitable for SMEs with experience in parking management and EV infrastructure, capable of meeting insurance and experience requirements.
Risks & flags
- Zero-CAPEX model
- Complex integration requirements
- Tight timelines for deployment
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Rásaíocht Con Éireann |
|---|---|
| Title | Carpark facility management and contract for the Installation, Operation, and Maintenance of EV Charging Infrastructure at Shelbourne Park Greyhound Stadium |
| CPV / category | not stated |
| Estimated value | €2,250,000 |
| Per-year (if multi-year) | not stated |
| Procedure type | Open Procedure |
| Lots | 2 |
| Location | Shelbourne Park Greyhound Stadium, Dublin |
| Contract length | 3 years (with potential 2-year extension) |
| Submission deadline | 22nd July 2026, 1:00 PM |
| Go-live / start | not stated |
2. Scope of Work
The contract encompasses two distinct lots: the management of a public car parking facility and the installation, operation, and maintenance of electric vehicle (EV) charging infrastructure at Shelbourne Park Greyhound Stadium. The contractor is expected to deliver high-quality, professional services that enhance operational efficiency and revenue generation.
Lot 1: Management of Public Car Parking Facility
- Facility Size: Approximately 250 surface car parking spaces.
- Current Infrastructure: 2 Pay & Display machines.
- Key Activities:
- Operate and manage public car parking at all times.
- Transition the operation to a technology-driven model.
- Propose an unmanned access solution to maximize revenue.
- Facilitate an online booking system for parking.
- Provide designated parking for GRI staff and visitors.
- Source contract parking arrangements with third parties.
- Collect and reconcile all car parking income.
- Provide real-time reporting on income generated.
- Design an unmanned barrier/exit workflow for greyhound owners and trainers.
Lot 2: EV Charging Infrastructure
- Funding Model: Fully funded (Zero-CAPEX) by the contractor.
- Infrastructure Requirements:
- Minimum deployment of 1 x 200kW DC High-Power Charger and 4 x Dual 22kW AC Destination Chargers.
- Total of at least 10 active charging sockets must be deployed concurrently.
- Operational Requirements:
- Integration of dynamic load management to prevent grid overload.
- Closed-loop access for GRI fleet drivers and public ad-hoc access via mobile app.
- Compliance with SEAI standards and relevant electrical regulations.
- Maintenance and Reporting:
- 24/7 automated monitoring and reporting of energy usage and financial metrics.
- Provision of comprehensive training for local site managers.
3. Background & buyer context
Rásaíocht Con Éireann (Greyhound Racing Ireland) is seeking to enhance its operational capabilities at Shelbourne Park Greyhound Stadium. This procurement aligns with the organization's strategic goals to modernize facilities and improve service offerings. The initiative is part of a broader effort to integrate sustainable practices, such as EV charging infrastructure, into the greyhound racing industry. The tender is being issued at a time when there is a growing demand for EV infrastructure, reflecting national and EU policies promoting electric vehicle adoption.
4. Eligibility & selection criteria
Bidders must meet the following eligibility and selection criteria to be considered for evaluation:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability: €6.5 million
- Employer's Liability: €6.5 million
- Product Liability: €6.5 million
- Professional Indemnity: €6.5 million
- Cyber Insurance: not specified
- Motor Insurance: not specified
- Certifications: Compliance with relevant ISO/EN/BS standards; specific certifications not specified for this tender.
- Past experience: Minimum of 3 comparable projects in the last 5 years, each of similar size and complexity.
- Personnel: Key personnel must have a minimum of 5 years' experience in relevant roles.
- Geographic constraints: Not specified for this tender.
5. Award criteria & scoring
Bids will be evaluated based on the following criteria:
Lot 1: Car Park Management
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| A | Tenders Submitted before deadline | Pass/Fail | - |
| B | Tax Clearance | Pass/Fail | - |
| C | Insurance | Pass/Fail | - |
| D | Completion of Section D | Pass/Fail | - |
| E | Submission of requested Documentation | Pass/Fail | - |
| 1 | Experience of operator in similar facilities | 30% | - |
| 2 | Management/service model proposed | 30% | - |
| 3 | Financial package | 40% | - |
Lot 2: EV Chargers
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| 1 | Technical Experience & Capability | 30% | - |
| 2 | Operations Technology and Service delivery Model | 30% | - |
| 3 | Financial package & Commercial Sustainability | 40% | - |
The overall evaluation will follow the Most Economically Advantageous Tender (MEAT) principle.
6. Submission requirements
Bidders must submit the following documents:
- Method statement / response document: Use the provided template; no page limit specified.
- CVs: For key personnel; no specific page count mentioned.
- Pricing schedule: Must follow the specified format in Appendix 1.
- Case studies: At least 2, demonstrating relevant experience; value range not specified.
- Declarations: Including ESPD, Bona Fides, Tax clearance, and Conflict of Interest.
- Mandatory site visit: Not specified.
- Submission portal: All submissions must be made via the eTenders portal.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | not specified |
| Clarification deadline | 15th July 2026, 12:00 PM |
| Tender deadline | 22nd July 2026, 1:00 PM |
| Expected award | not specified |
| Contract start | not specified |
| Go-live / mobilisation | not specified |
8. Contract terms that matter
The contract will have an initial term of 3 years, with an option to extend for up to 2 additional years. Key terms include:
- Payment terms: Payments will be made under the Prompt Payment of Accounts Act 1997.
- Key SLAs/KPIs: A mandatory 98% quarterly uptime guarantee for the EV charging infrastructure.
- Termination clauses: RCÉ reserves the right to terminate the contract with one month's notice if performance is unsatisfactory.
- IP ownership: All infrastructure developed under the contract will be owned by the contractor during the contract term.
- Sub-contracting rules: Subcontracting is permitted with prior consent from RCÉ.
9. Risks, red flags & unusuals
Potential risks and concerns specific to this tender include:
- Zero-CAPEX model: The requirement for the contractor to fully fund the project may limit participation to larger firms with significant capital.
- Complex integration: The need for compliance with multiple regulatory standards and integration with existing infrastructure may pose challenges for bidders without prior experience in similar projects.
- Revenue share model: The proposed revenue share structure may create uncertainty regarding long-term profitability for bidders.
- Tight timelines: The expectation for rapid deployment of EV charging infrastructure may pressure bidders to meet aggressive deadlines.
10. SME fit assessment
This tender is suitable for firms with the following characteristics:
- Credible bidders: Small to medium-sized enterprises (SMEs) with experience in parking management and EV infrastructure installation may qualify, provided they meet the insurance and experience requirements.
- Consortiums and subcontracting: Bidders may form consortiums or subcontract, but must disclose subcontractor details in their submission.
- Bid preparation effort: Estimated preparation time is significant, likely requiring several weeks to compile necessary documentation and proposals.
- Pwin signal: The presence of a zero-CAPEX model may favor larger firms or incumbents with established relationships and experience in the sector.
11. Where to dig deeper
- Source RFT filename: CFT- Car park facilities-Shelbourne Park 2026.docx
- eTenders CFT ID: GRI1140MC
- Contact email: [email protected]
- Important attachments: Appendix 1 – Pricing Schedule, Section D – Information to Be Supplied With Each Tender.
Can you bid?
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Lots (2)
Documents (1)
CFT- Car park facilities-Shelbourne Park 2026.docx
151.2 KB
Original notice text
Greyhound Racing Ireland wishes to procure a service provider who can provide a fully inclusive high quality, professional off-street parking management service including machine maintenance, customer support and enforcement services for its existing car parking facilities at Shelbourne Park Greyhound Stadium. Greyhound Racing Ireland also wishes to procure a Single Party Concession Contract for the Fully Funded (Zero-CAPEX) Design, Installation, Operation, and Maintenance of EV Charging Infrastructure at Shelbourne Park Greyhound Stadium This Invitation to Tender (ITT) forms part of a tender process. It is advised that you read this document completely and in its entirety before completing your tender submission.
AI analysis updated 1 month, 1 week ago
Value
€2.2m
Deadline
07 Aug
Buyer
Rásaíocht Con ÉireannLocation
Shelbourne Park Greyhound Stadium, Dublin, featuring a public car parking facility and EV charging infrastructure.
Procedure
Open
Clarification
15 Jul 2026
eTenders ID
8431855
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender