Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
Closed Construction & Civil Engineering Works SME Suitable Open

Tuamgraney ORIS

Value

€1

Deadline

17 Aug

Construction and completion of the Tuamgraney ORIS project for Clare County Council, adhering to Short Public Works Contract conditions.

SME fit: High Bid effort: Medium

Clare County Council seeks contractor for Tuamgraney ORIS project under Short Public Works Contract

Bidder profile

SMEs with a strong track record in general construction/civil engineering, robust H&S systems, and experience with public works contracts.

Risks & flags

  • Unusually distant submission deadline
  • Limited specific scope detail in briefing
  • High emphasis on Health and Safety compliance
  • Project value likely below EU thresholds (Short Public Works Contract)

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Clare County Council
Title Tuamgraney ORIS
CPV / category Not specified
Estimated value Not disclosed
Per-year Not specified
Procedure type Not specified
Lots Not specified
Location Not specified
Contract length Not specified
Submission deadline 2026-08-17T15:00:00+00:00
Go-live / start Not specified

2. Scope of Work

This tender seeks a contractor for the Tuamgraney ORIS project. The contract is a Short Public Works Contract, indicating a focus on construction and associated works. The contractor will be responsible for constructing and completing the Works at their own expense, adhering to the contract terms, instructions from the Employer's Representative, and applicable law.

Key activities and responsibilities include:

  • Construction and Completion: The contractor must construct and complete the Works as described in the contract, ensuring safety and stability of the Works and all operations on site, including temporary works.
  • Site Management: This involves securing the site, keeping it in good order, free from unnecessary obstructions, and ensuring the safety of persons on site. The contractor must protect persons and nearby areas from hazards and interference resulting from the Works.
  • Minimising Disruption: The contractor must ensure that they, their personnel, and the Works do not unnecessarily or improperly cause a nuisance or inconvenience to the public, landowners, or users of adjacent land, roads, or footpaths. Interference with the use of land, roads, or footpaths must also be minimised.
  • Adherence to Contract and Instructions: The contractor must comply with the contract, written instructions from the Employer's Representative, and relevant law. This includes implementing instructions that may change the Works or impose/change restrictions on construction methods.
  • Setting Out the Works: The contractor is responsible for setting out the Works by reference to specified points, lines, and levels, and must verify their accuracy.
  • Materials and Goods: Goods and materials for the Works must be of good quality and suitable for their intended purpose. The contractor must provide necessary certification to comply with Building Control Regulations.
  • Access: The contractor must ensure access to the Site and other places where Works are being constructed or materials are being produced, stored, or prepared, for the Employer, Employer's Representative, Assigned Certifier, and authorised persons until the Defects Certificate is issued.
  • Health and Safety: The contractor must comply with the Safety, Health and Welfare at Work Act 2005 and associated regulations. This includes carrying out risk assessments, maintaining a safety statement, and ensuring staff are aware of their responsibilities.
  • Quality Assurance: Measures for ensuring quality are required, including having adequate knowledge, training, and resources. This may involve utilising relevant technicians or technical bodies for quality control and providing evidence of a safety management system, potentially certified to ISO 45001:2018 or equivalent, or certified membership of Safe-T-Cert.
  • Manpower Reporting: The contractor must provide a statement of average annual numbers of persons employed and those in managerial positions over the last three years, specifically in relation to Health and Safety.

3. Background & buyer context

Clare County Council is procuring services for the Tuamgraney ORIS project. The procurement is being conducted under the Short Public Works Contract framework, indicating a standard approach for public works projects in Ireland. The contract document is dated 25th November 2025, suggesting the tender process is active or recently initiated. The Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation is the publisher of the contract conditions, indicating alignment with national public procurement standards. No specific policy drivers or programme context beyond standard public works procurement are detailed in the provided text.

4. Eligibility & selection criteria

Bidders must meet the following minimum standards to be considered:

  • Turnover Requirement: A minimum yearly turnover of €500,000 arising from General Construction/Civil Engineering work.
  • Insurance:
  • Public Liability Insurance: Minimum level of €6,500,000 in respect of any one accident. Maximum excess for property only is €10,000.
  • Employer's Liability Insurance: Minimum level of €13,000,000 in respect of any one accident. Maximum excess is €6,500.
  • Professional Indemnity Insurance: Minimum level of cover is proportionate to the project size, with a default level of €1.5m. The maximum permissible excess is the greater of 2% of the tenderer's annual turnover or €5,000.
  • Certifications:
  • Evidence of a safety management system in accordance with ISO 45001:2018 or equivalent.
  • Certified membership of Safe-T-Cert may be deemed equivalent for quality assurance.
  • Past Experience: Evidence of Health and Safety aspects of works previously undertaken over the past 5 years (or up to 7 years if necessary for competition). Projects must be similar in nature and complexity to the Works. This evidence is to be provided by completing Appendix B1 (List of Previous Projects) and Appendix B2 (Certificate of Satisfactory Execution).
  • Personnel:
  • Management staff must possess appropriate educational/professional qualifications and experience, along with relevant Health and Safety qualifications, training, and experience. CVs detailing qualifications, experience on similar projects, and roles are required.
  • For Type 2 & 3 Projects, evidence of adequate and appropriate ongoing health and safety training and commitment of resources is required.
  • Geographic / facility constraints: Not specified for this tender.

5. Award criteria & scoring

The award criteria are not explicitly detailed in the provided text. However, the Health and Safety Supplement indicates that all health and safety selection criteria are pass/fail criteria only. Bidders must meet the relevant minimum standard stated under each qualification criterion. The Short Public Works Contract conditions do not detail a specific scoring mechanism for award, implying that compliance with technical and financial requirements, as well as passing all pass/fail criteria, will form the basis of the award. The price/quality split is not specified.

6. Submission requirements

Bidders must submit the following:

  • Completed Tender Documents: This includes the RFT response, likely incorporating specific appendices.
  • Appendix B1: List of Previous Works Projects for which Certificates of Satisfactory Execution are available.
  • Appendix B2: Certificate of Satisfactory Execution for previous projects.
  • Health & Safety Supplement 3.4.1: Completed sections detailing Health and Safety competence, including:
  • Evidence of management staff qualifications and experience (3.4.1a HS).
  • Evidence of personnel qualifications and experience (3.4.1b HS - noted as 'Not Required' in the provided extract, but general personnel experience is implied in 3.4.1a).
  • List of Works carried out over the past 5 years, focusing on Health and Safety aspects (3.4.1c HS).
  • Declaration of Measures for Ensuring Quality, including evidence of a safety management system (3.4.1d HS).
  • Statement of average annual numbers of persons employed and those in managerial positions over the last 3 years (3.4.1e HS).
  • Declarations:
  • Bona Fides declarations are standard for public works contracts.
  • Tax clearance certificates are mandatory.
  • Conflict of Interest declarations are required.
  • The European Single Procurement Document (ESPD) is likely required, though not explicitly listed in the provided text.
  • Pricing Schedule: A detailed pricing schedule, format to be specified in the full tender documents.
  • Mandatory Site Visit: Not specified in the provided text.
  • Submission Portal: Tenders must be submitted via the eTenders platform. Specific format rules for electronic submission will be detailed in the full tender documents.

7. Key dates & process

RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-08-17T15:00:00+00:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

The contract is based on the Short Public Works Contract PW-CF6 v1.15 (25-11-2025). Key terms include:

  • Term + Extension: The contract duration is defined by the 'Time for Completion'. Extensions may be granted for specific reasons including Compensation Events, loss or damage to the Works, weather events, strikes, acts of public authority, or failure of other parties.
  • Payment Terms: Not detailed in the provided text, but standard public sector payment terms (e.g., 30-day payment) are generally expected.
  • Key SLAs/KPIs: Not specified in the provided text.
  • Liquidated Damages: Applicable if the Contractor fails to substantially complete the Works within the Time for Completion. The rate is specified in the Schedule, with a daily rate of €200 mentioned in the 'DO-NOT-USE-AS-BINDING' section, but this is an example and not confirmed for this specific tender.
  • Termination: The contract includes provisions for termination, though specific grounds are not detailed in the provided text.
  • IP Ownership: Not specified in the provided text.
  • Sub-contracting Rules: The Contractor may engage sub-processors for data processing with prior written notice to the Employer and opportunity for objection. For other sub-contracting, the Contractor may not assign the Contract or any part of it without the Employer’s consent.
  • Performance Bond: Required if stated in the Schedule, to be provided within 7 days of acceptance of the tender, executed by the Contractor and an approved surety.

9. Risks, red flags & unusuals

  • Late Deadline: The submission deadline is August 2026, which is unusually far in the future for a tender that appears to be actively managed (indicated by the 25-11-2025 contract date). This suggests a potential for significant project changes or a very long lead time.
  • Lack of Detail on Scope: The provided text focuses heavily on contractual conditions and selection criteria, with limited specific detail on the actual "Works" to be undertaken. This necessitates careful review of the full tender documents to understand the project's physical scope and technical requirements.
  • Health and Safety Focus: The extensive Health and Safety Supplement (3.4.1) indicates a high priority placed on safety compliance. Bidders must have robust H&S management systems and documentation.
  • Short Public Works Contract: This contract type is typically used for works valued below EU thresholds, suggesting a project of moderate scale. However, the absence of an estimated value makes this uncertain.

10. SME fit assessment

This tender is likely suitable for small to medium-sized enterprises (SMEs) with a strong track record in general construction and civil engineering, particularly those with well-established health and safety management systems.

  • Credible Bidders: SMEs with an annual turnover of at least €500,000 in general construction/civil engineering, holding the required insurance levels, and possessing ISO 45001:2018 or equivalent certification (or Safe-T-Cert) would be well-positioned. A demonstrated history of successfully completed projects with a focus on health and safety is crucial.
  • Consortium/Sub-contracting: The contract conditions state the contractor may not assign the contract without employer consent. While sub-contracting for specific elements might be permissible, the primary contractor remains responsible. Consortium bids are not explicitly mentioned but are a common route for SMEs to meet requirements.
  • Indicative Bid-Prep Effort: Given the detailed Health and Safety requirements, the need for specific appendices (B1, B2), and the standard Short Public Works Contract documentation, bid preparation could require 10-20 days of focused effort for an experienced SME.
  • Pwin Signal: The use of the Short Public Works Contract suggests the project value is likely below €5 million (for works). The absence of an estimated value and the distant deadline make it difficult to assess incumbent strength or market dynamics. The emphasis on H&S suggests a focus on compliance and capability over pure price.

11. Where to dig deeper

  • Source RFT Filename(s): [3.4.1-HS-Works-Contractor_v3.1-25-11-2025.pdf], [PW-CF6_Contract_v1.15_25-11-2025.pdf], [Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx]
  • eTenders CFT ID: Not specified in the provided text.
  • Contact / Clarification Portal: Not specified in the provided text.
  • Most Important Attachments:
  • PW-CF6 v1.15 25-11-2025 (Conditions)
  • 3.4.1-HS-Works-Contractor_v3.1-25-11-2025 (Health & Safety Supplement)
  • Appendix B1 & B2 (Previous Projects & Certificates)

Can you bid?

Required certifications

  • ISO 45001:2018
  • Safe-T-Cert

Minimum turnover

€500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

ISO 45001:2018

Documents (49)

PDF

261242-PUNCH-XX-XX-SP-C-0001 Civil Engineering Specification.pdf

783.2 KB · Specification

PDF

Volume C - Pricing Document.pdf

2.4 MB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.7 KB · Contract / Agreement / Terms

PDF

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.pdf

362.1 KB · Contract / Agreement / Terms

PDF

PW-CF6_Contract_v1.15_25-11-2025.pdf

431.0 KB · Contract / Agreement / Terms

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

41.1 KB · Form / Declaration / Certificate

PDF

261242-PUNCH-01-XX-DR-C-0125 A2 C01.pdf

2.4 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0126 A2 C01.pdf

2.4 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0201 A2 C01.pdf

1.6 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0401 A2 C01.pdf

3.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0402 A2 C01.pdf

3.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0403 A2 C01.pdf

2.4 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0404 A2 C01.pdf

2.5 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0441 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0442 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0443 A2 C01.pdf

2.1 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0444 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0461 A2 C01.pdf

2.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0462 A2 C01.pdf

2.7 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0463 A2 C01.pdf

2.3 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0464 A2 C01.pdf

2.1 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0481 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0482 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0483 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0484 A2 C01.pdf

1.9 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0485 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0486 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0487 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0488 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0489 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0490 A2 C01.pdf

1.9 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0491 A2 C01.pdf

1.6 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0551 A2 C01.pdf

3.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0552 A2 C01.pdf

4.7 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0553 A2 C01.pdf

1.8 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-DR-C-0554 A2 C01.pdf

2.0 MB · Drawing / Plan / Layout

PDF

261242-PUNCH-01-XX-RG-C-001.pdf

240.8 KB

PDF

261242-PUNCH-XX-XX-HS-C-001.pdf

2.5 MB

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.4 KB

PDF

3.4.2-HS-PSCS_v3.1-25-11-2025.pdf

420.3 KB

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

33.0 KB · Appendix / Annex

DOCX

FTS-6_v1.7_06-11-2025.docx

61.6 KB

DOCX

ITTW4_Open_Procedure_Short_Form_v2.0_18-11-2024.docx

64.0 KB

PDF

ITTW4_Open_Procedure_Short_Form_v2.0_18-11-2024.pdf

544.3 KB

DOCX

MF_1.22_Project_Supervisor_09-04-2020.docx

37.5 KB

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

191.6 KB

PDF

QW2_Part_1_v2.2_25-11-2025.pdf

702.3 KB

DOCX

QW_Part_2_v1.1_18-11-2024.docx

59.0 KB

ZIP

Tuamgraney ORIS Tender Pack.zip

68.8 MB

Original notice text

The project seeks to develop a trailhead and 480m trail to link the settlement of Tuamgraney to the existing Killaloe-Ballycuggeran-Ogonnelloe trail, thus completing a 17km rural walkway from Killaloe-Scarriff, long the shores of Lough Derg. It is envisaged that the following elements will be undertaken under the project, please note this list is not exhaustive or representative of the order of importance: a) Demolition of existing road surfaces b) Construction of a new trail c) Narrowing of hardshoulder to facilitate the construction of a new footpath along the R463 d) Excavation and earthworks e) Pavement construction f) Surface water drainage network Site Location The site of the proposed development is located on the R463 road between Tuamgraney and Ogonnelloe just 100m to the south of the centre of the village of Tuamgraney. The top of the trail begins at the Tuamgraney Castle and St. Cronins Church and runs for 500 metres in close proximity to the R463 in the direction of Ogonnelloe. The River Scarriff flows 500 metres from the site and joins Lough Derg 2km east of the site.

AI analysis updated 1 month ago

Bid ↗
Details

Value

€1

Deadline

17 Aug

View on eTenders ↗

Procedure

Open

eTenders ID

8732717

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender