Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / CUDSH Refurbishment at CUH Campus Phase 2a for UCC
Closed Construction & Civil Engineering Works Open

CUDSH Refurbishment at CUH Campus Phase 2a for UCC

Deadline

31 Aug

Refurbishment and joinery works at CUDSH campus, Phase 2a, within the CUH campus, including electrical and ICT installations.

SME fit: Medium Bid effort: Medium 📍 Cork

Refurbishment works at Cork University Dental School and Hospital (CUDSH) campus, Phase 2a

Bidder profile

Construction firms with experience in refurbishment projects, particularly in healthcare or educational settings, and strong capabilities in joinery, electrical, and ICT installations.

Risks & flags

  • Live hospital environment
  • Coordination with other trades
  • Specific material specifications

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer University College Cork
Title CUDSH Refurbishment at CUH Campus Phase 2a for UCC
CPV / category not stated
Estimated value not disclosed
Per-year not stated
Procedure type not stated
Lots not stated
Location Cork, Ireland
Contract length not stated
Submission deadline 2026-08-31T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

This tender seeks a contractor for refurbishment works at the Cork University Dental School and Hospital (CUDSH) campus, specifically Phase 2a, located within the Cork University Hospital (CUH) campus. The project involves refurbishment and joinery works, detailed in specific drawings and schedules.

The scope of work includes:

  • Joinery Schedule:

  • Wash hand basin units.

  • Shelving above lab benchtops and digital workflow desks.

  • Lockable, tambor-style door storage units.

  • Sink cabinetry.

  • Worktop surfaces are specified as glass fibre composition, ground and polished, resistant to compression, abrasion, and scratching, with a non-porous, dazzle-free finish in white/grey. Edges are to be finished with integrally cast synthetic material, 34x10mm front edge rounded, pearl grey colour, and heat resistant greater than 400 degrees C.

  • Floor-mounted cupboard bodies are to be 19mm synthetic resin covered decorative flat particleboard (KF 4 A, DIN 68 765), dowelled and glued, open at the top. All edges are to be covered with a 0.4mm thick non-fading, melamine resin, coloured throughout. Floor cabinets stand on galvanised supports to provide a 5mm gap between the floor and cabinet, with a 206mm high plinth set back 40mm from the front edge. Panels are to be sheet stainless steel, electrostatically powder coated.

  • Shelving material is to match the worktop below (stainless steel) or match that of digital workflow storage units.

  • Electrical and ICT Services:

  • The tender documents include a pricing schedule for Electrical and ICT Services' Installations. This indicates that the scope will encompass various electrical and ICT installations within the CUDSH campus.

  • Specific bills of quantities are referenced for:

  • Strip Out and Enabling Works.

  • Power.

  • Containment.

  • General Services' Installation.

  • Lighting Services' Installation.

  • Emergency Lighting Services' Installation.

  • Communication Services' Installation.

  • Audio Visual Services' Installation.

  • Security Services' Installation.

  • Fire Protection Services' Installation.

  • Controls Services' Installation.

  • Lighting Protection Installation.

  • External Ducted Services' Installation.

  • General Items.

The works are to be undertaken within and adjacent to a live hospital environment, requiring coordination with other trades and specialists. The contractor will be required to liaise with the lead services' coordinator (Mechanical Services' Contractor) and execute works in line with the Main Contract programme and working hours/conditions.

3. Background & buyer context

This procurement is for refurbishment works at the Cork University Dental School and Hospital (CUDSH) campus, identified as Phase 2a. This project falls within the broader context of University College Cork's (UCC) campus development and operational needs. The Cork University Hospital (CUH) campus is a significant healthcare and educational hub, and refurbishments within its facilities are typically driven by the need to maintain and upgrade infrastructure to support ongoing clinical, research, and educational activities. Specific policy drivers or programme alignments, such as Higher Education 4.0 or specific health service modernization initiatives, are not explicitly stated in the provided metadata. The project's location within a live hospital environment necessitates careful planning and execution to minimise disruption to patient care and hospital operations.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement:
  • Minimum average annual turnover of €3,000,000.00 from general construction work over the last three previous financial years.
  • Insurance:
  • Professional Indemnity Insurance: Minimum level of €1,500,000.00 on an annual aggregate limit. Maximum permissible excess is the greater of 2% of annual turnover or €5,000.
  • Public Liability Insurance: Minimum level of €13,000,000.00 in respect of any one accident. Maximum excess for property only is €10,000.
  • Employer's Liability Insurance: Minimum level of €13,000,000.00 in respect of any one accident.
  • Past experience:
  • A minimum of three construction contracts, similar in nature and complexity to this project, which the Tenderer has directly carried out in the last five years. These must be supported by Certificates of Satisfactory Execution.
  • For Health and Safety competence (management), at least two members of managerial staff must have experience on projects of similar nature, size, and complexity.
  • For Health and Safety competence (personnel), at least one member of personnel must have attended a structured, externally-validated health and safety training course providing at least 8 hours annual training, or have attained a formal health and safety postgraduate qualification. This person cannot be the same as the managerial staff noted in 3.4.1a.
  • Personnel:
  • For Health and Safety competence (management), at least one managerial staff member must have at least 8 hours annual construction health and safety training for each of the past three years.
  • For Health and Safety competence (personnel), at least one personnel member must have at least 8 hours annual construction health and safety training for each of the past three years.
  • Certifications:
  • For Health and Safety competence (quality), third-party certification of a safety management system in accordance with ISO 45001:2018 or equivalent is accepted. Certified membership of Safe-T-Cert may be deemed equivalent.
  • Geographic / facility constraints:
  • Not specified for this tender.

5. Award criteria & scoring

The award criteria are not explicitly detailed with scoring percentages in the provided metadata. However, the tender process will involve evaluating submissions based on technical capability and price. Health and Safety competence criteria are explicitly stated as pass/fail. The overall award will likely follow a Most Economically Advantageous Tender (MEAT) approach, balancing quality and cost.

Criterion Weight (%) Sub-criteria

Can you bid?

Required certifications

  • ISO 45001:2018

Minimum turnover

€3,000,000

Public liability insurance

€13,000,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

ISO 45001:2018

Scoring

Most Economically Advantageous Tender

Documents (92)

PDF

26190-A-BCA-Architectural Specification.pdf

145.8 KB · Specification

PDF

UC48-SP-HLCE-SE-005-0 - PHASE 2 Specification for Demolition.pdf

273.8 KB · Specification

PDF

UC48-SP-HLCE-SE-006-0 PHASE 2 Specification for Structural Steelwork.pdf

506.0 KB · Specification

PDF

UC48-SP-HLCE-SE-007-0 PHASE 2 Specification for blockwork and brickwork.pdf

290.9 KB · Specification

PDF

UCC BEMS Specification.pdf

542.9 KB · Specification

PDF

UCC CCTV & ACCESS Project Specification.pdf

187.7 KB · Specification

PDF

UCC Structured Cabling Specification.pdf

269.8 KB · Specification

ZIP

RFT for CUDSH PH 2 Refurbishment.zip

78.4 MB · RFT / Invitation to Tender

PDF

CUDSH Phase 2A Volume C Pricing Document.pdf

4.8 MB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

54.0 KB · Contract / Agreement / Terms

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

26.0 KB · Form / Declaration / Certificate

PDF

26190_A-BCA-ZZ-00-DR-A-1000-Demolition Plan - G.82 + G.83.pdf

194.6 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-1050-Room Layout - G.82 + G.83.pdf

1.8 MB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-1060-Room Layout M&E Coordinated - Plan.pdf

1014.1 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-1061-Room Layout M&E Coordinated G.83.pdf

212.6 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-1062-Room Layout M&E Coordinated - G.82.pdf

197.3 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-1063-Room Layout M&E Coordinated - G.83 Sections.pdf

445.8 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-2500-Dimensions & Floor Finishes Plans - G.82 + G.83.pdf

938.3 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-3050-Reflected ceiling plans & sections - G.82 & G.83.pdf

927.9 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-00-DR-A-510-Site Possession.pdf

349.4 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-4000-Partition Types - G.82 + G.83.pdf

1.5 MB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-4001-Moveable Wall Details - G.82 + G.83.pdf

136.3 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-4100-Fire Stopping Details.pdf

1.2 MB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-5000-Proposed Doors Schedule.pdf

185.7 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-5001-Proposed Window & Screen Schedule.pdf

307.6 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-6010-Joinery Detail - Digital Workflow Desk.pdf

129.1 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-7000-Sanitaryware Schedule.pdf

132.5 KB · Drawing / Plan / Layout

PDF

26190_A-BCA-ZZ-XX-DR-A-9000-Ironmongery Schedule.pdf

1.0 MB · Drawing / Plan / Layout

PDF

5153322-ATK-ST-ZZ-DR-CE-Fire Tender Route-A1.pdf

820.0 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-E-2000-D2-P01.pdf

1.6 MB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-E-3000-D2-P01.pdf

473.0 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-E-4000-D2-P01.pdf

504.0 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-E-6000-D2-P01.pdf

504.5 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-2000-D2-P01.pdf

561.5 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-3000-D2-P01.pdf

491.0 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-4000-D2-P01.pdf

1.5 MB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-6000-D2-P01.pdf

483.9 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-6850-D2-P01.pdf

484.1 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-6870-D2-P01.pdf

479.7 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-00-DR-M-7000-D2-P01.pdf

582.2 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-RF-DR-M-7001-D2-P01.pdf

341.5 KB · Drawing / Plan / Layout

PDF

U078-OCSC-83-XX-DR-M-1000- D2 -P01.pdf

472.5 KB · Drawing / Plan / Layout

PDF

U078-OCSC-XX-XX-DR-E-1001-D2-P01.pdf

409.6 KB · Drawing / Plan / Layout

PDF

2024 IBA Constractors Questionnaire.pdf

714.2 KB

PDF

26190-A_HS-01_Design Risk Assessment.pdf

2.2 MB

PDF

26190-A_HS_D1_PSHP.pdf

1.3 MB

PDF

26190_A-BCA-XX-XX-RG-A-Document Transmittal.pdf

56.2 KB

PDF

26190_A-BCA-ZZ-XX-DR-A-6000-Joinery schedule - G.82 + G.83.pdf

885.3 KB · Appendix / Annex

ZIP

3.1.1 S5-Handover_DPM.zip

60.0 KB

PDF

3.1.2 UCC Index for Digital Project Manual (DPM).pdf

812.4 KB

PDF

3.1.3 UCC PTW Template.pdf

146.6 KB

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

45.0 KB

PDF

42508 RDAS Survey for CUDSH (CUH Campus).pdf

7.8 MB

DOCX

Appendix-E-QC1 - Curriculum Vitae_ds_v.01.docx

51.9 KB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

31.3 KB · Appendix / Annex

PDF

Aspergillus Guidelines 2018.pdf

627.9 KB

PDF

Cork University Hospital Site Rules - Demolition 2024-10-10 (Issued).pdf

1.6 MB

DOCX

CUDDSH Phase 2A FTS5_v2.10-16-06-2026.docx

94.9 KB

DOCX

CUDSH Phase 2A ITTW2-v3.1-25-11-2025.docx

82.7 KB

DOCX

CUDSH Phase 2A QW2_Part_1_v2.2_25-11-2025.docx

194.2 KB

DOCX

CUDSH Phase 2A QW_Part_2_v1.1_18-11-2024.docx

58.5 KB

DOCX

ESPD.docx

75.4 KB · ESPD (European Single Procurement Document)

DOCX

MF-1.10-09-04-2020.docx

51.1 KB

DOCX

MF-1.12-09-04-2020.docx

67.8 KB

DOCX

MF-1.13-09-04-2020.docx

47.6 KB

DOCX

MF-1.16-21-03-2016-REV.docx

55.7 KB

DOCX

MF-1.6-09-04-2020.docx

57.2 KB

PDF

SOP 08 Electrical Installations Rev B.pdf

349.8 KB

PDF

SOP 14 Mechanical Safe System of Work-Rev B.pdf

601.8 KB

PDF

SOP 18 Movement of Vehicles Rev A.pdf

6.5 MB

PDF

SOP 20 Asbestos Rev A.pdf

549.7 KB

PDF

Transmittal - 00003.pdf

93.3 KB

PDF

U078-OCSC-83-XX-BQ-E-0001-D2-P03.pdf

247.7 KB

PDF

U078-OCSC-83-XX-BQ-M-0001-D2-P03.pdf

177.1 KB

PDF

U078-OCSC-83-XX-DRA-ME-0001-D2-P03.pdf

287.6 KB

PDF

U078-OCSC-83-XX-DRA-ME-0002-D2-P02.pdf

124.0 KB

PDF

U078-OCSC-83-XX-PIP-ME-0001-D2-P02.pdf

68.9 KB

PDF

U078-OCSC-83-XX-RG-M-0001-D2-P01.pdf

147.6 KB

PDF

U078-OCSC-83-XX-SCH-E-0001-D2-P01.pdf

727.4 KB

PDF

U078-OCSC-83-XX-SCH-E-0002-D2-P01.pdf

808.5 KB

PDF

U078-OCSC-83-XX-SCH-E-0003-D2-P01.pdf

481.9 KB

PDF

U078-OCSC-83-XX-SH-BW-0001-D2-P03.pdf

151.4 KB

PDF

U078-OCSC-83-XX-SH-M-0001-D2-P01.pdf

138.6 KB

PDF

U078-OCSC-83-XX-SP-E-0002-D2-P02.pdf

3.3 MB

PDF

U078-OCSC-83-XX-SP-E-0003-D2-P02.pdf

1.2 MB

PDF

U078-OCSC-83-XX-SP-M-0002-D2-P02.pdf

3.5 MB

PDF

U078-OCSC-83-XX-SP-M-0003-D2-P03.pdf

2.5 MB

PDF

U078-OCSC-83-XX-SP-MEP-0001-D2-P03.pdf

1.9 MB

PDF

U078-OCSC-XX-XX-RG-E-0001.pdf

246.8 KB

PDF

UC48-DARrev0-Phase 2.pdf

330.3 KB

PDF

UC48-ParticularRiskRev0-Phase 2.pdf

273.2 KB

PDF

UC48-RP-HLCE-SE-002.pdf

4.5 MB

Original notice text

Demolition, refurbishment and fit out works

AI analysis updated 2 weeks, 4 days ago

Bid ↗
Details

Deadline

31 Aug

View on eTenders ↗

Location

Cork University Dental School and Hospital (CUDSH) campus, within the Cork University Hospital (CUH) campus.

Procedure

Open

eTenders ID

8720090

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender