Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Re-Tender for Single Supplier Framework Agreement for the Supply of Building and Construction Materials and Supplies
Closed Engineering Consultancy Supplies Open

Re-Tender for Single Supplier Framework Agreement for the Supply of Building and Construction Materials and Supplies

Value

€180k

Deadline

22 May

Framework agreement for supply of building and construction materials for TUSMM

SME fit: High Bid effort: Medium 📍 Westmeath

Framework agreement for supply of building and construction materials for TUSMM

Bidder profile

This opportunity is suitable for SMEs or lower-mid-market contractors with strong compliance and delivery capabilities.

Risks & flags

  • Compliance with mandatory obligations
  • Insurance requirements
  • Turnover thresholds

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Technological University of the Shannon: Midlands Midwest (TUSMM)
Title Re-Tender for Single Supplier Framework Agreement for the Supply of Building and Construction Materials and Supplies
CPV / category Engineering Consultancy
Estimated value €180,000.00
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-22T16:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought engineering consultancy under the title "Re-Tender for Single Supplier Framework Agreement for the Supply of Building and Construction Materials and Supplies" for Technological University of the Shannon: Midlands Midwest (TUSMM). The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included €13,000,000, €6,500,000, €240,000, €180,000, €0.00, €2.00, €100, €100.00.

Ll be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Professional Indemnity [Click. Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years. G Authority estimates that the expenditure on the Goods to be covered by the proposed Goods Contract may amount to some €180,000 (excl. Ract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Profes. Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years. If an item unit cost is left blank, or priced at €0.00, the highest applicable submitted rate will be applied and used in the calculati.

3. Background & buyer context

The process was run by Technological University of the Shannon: Midlands Midwest (TUSMM) with deadline recorded as 2026-05-22T16:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: ll be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Professional Indemnity [Click; Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years; g Authority estimates that the expenditure on the Goods to be covered by the proposed Goods Contract may amount to some €180,000 (excl; ract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Profes; Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value €180,000.00. Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included ll be required to hold for the term of the Goods Contract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Professional Indemnity [Click; Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years; g Authority estimates that the expenditure on the Goods to be covered by the proposed Goods Contract may amount to some €180,000 (excl; ract the following insurances: Type of Insurance Indemnity Limit Employer’s Liability €13,000,000 Public Liability €6,500,000 Product Liability €6,500,000 Profes; Turnover; the applicant must demonstrate it has achieved a minimum average turnover of €240,000 per annum for the past three years; If an item unit cost is left blank, or priced at €0.00, the highest applicable submitted rate will be applied and used in the calculati. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-22T16:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: 97de605f-d1de-4855-88b8-a7060cc468d4.

Can you bid?

Minimum turnover

€240,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (4)

DOCX

Appendix 1 Tender Specification- Building and construction material and supplies for TUS -Athlone campus.docx

209.5 KB · Specification

DOCX

RFT for the Supply of Building and Construction Materials and Supplies to TUS Athlone campus.docx

151.8 KB · RFT / Invitation to Tender

XLSX

Appendix 2- Pricing schedule- Building and construction material and supplies for TUS -Athlone campus.xlsx

80.3 KB · Pricing / BOQ / Schedule of Rates

DOCX

Tender's Statement of Declarations -Building and construction material and supplies for TUS -Athlone campus.docx

25.8 KB · Form / Declaration / Certificate

Original notice text

TUS wishes to establish a Single Supplier Framework Agreement for the supply of various building and construction materials and supplies e.g. consumables and supplies including timbers, plumbing, paints, general construction, and garden supplies materials to include other miscellaneous items for use in general maintenance in Technological University of the Shannon – Midlands Campus, Athlone.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Value

€180k

Deadline

22 May

View on eTenders ↗

Location

Technological University of the Shannon, Athlone campus

Procedure

Open

eTenders ID

7985504

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender