TII Open Research Call 2026
Value
€315k
Deadline
18 Jun
18 Jun 2026
Value
€315k
Deadline
18 Jun
Research projects to enhance environmental considerations in transport infrastructure.
Research projects to enhance environmental considerations in transport infrastructure.
Bidder profile
Firms with expertise in environmental assessments and transport infrastructure projects.
Risks & flags
- Absence of turnover requirements
- Potential for high bids
- Remote team management challenges
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Transport Infrastructure Ireland (TII) |
|---|---|
| Title | TII Open Research Call 2026 |
| CPV / category | Environmental & Ecology |
| Estimated value | €315,000.00 |
| Per-year | not stated |
| Procedure type | Open procedure |
| Lots | 2 |
| Location | not stated |
| Contract length | Up to 24 months |
| Submission deadline | 2026-06-18T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The TII Open Research Call 2026 encompasses two distinct research projects aimed at enhancing environmental considerations in transport infrastructure. The contractor will engage in research activities that are critical for informing future transport projects and ensuring sustainability.
Deliverables:
- Lot 1: Research on the total cost and value of environmental factors in transport infrastructure projects.
- Lot 2: Assessment of the lifespan of timber posts used in road boundary fencing.
Activities:
- Conduct a national survey of in-service timber fence posts from five different motorway locations.
- Analyze environmental factors impacting transport infrastructure, including lifecycle assessments and sustainability metrics.
- Produce comprehensive reports detailing findings, methodologies, and recommendations for future projects.
Volume:
- The research is expected to span a contract length of up to 24 months, with a focus on delivering actionable insights that can be integrated into TII's ongoing and future projects.
3. Background & buyer context
This procurement aligns with TII's strategic objectives to enhance environmental sustainability in transport infrastructure. The call for research is timely, as TII seeks to integrate more robust environmental assessments into its project planning and execution processes. The initiative is part of a broader governmental push towards sustainable infrastructure development, reflecting current policy trends and public expectations regarding environmental stewardship.
4. Eligibility & selection criteria
Bidders must meet the following criteria to be considered for evaluation:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Employers Liability: €13m each and every claim.
- Professional Indemnity: €500k in the aggregate.
- Certifications: Not specified for this tender.
- Past experience: Not specified for this tender.
- Personnel: At least one economist with a minimum of 15 years’ post-graduate experience.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
Bids will be evaluated based on the following criteria:
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| Quality of Research Proposal | 60% | Methodology, relevance, and innovation | Minimum score of 50% required |
| Cost | 40% | Total cost of the proposal | No specific pass/fail threshold |
The evaluation will follow a Most Economically Advantageous Tender (MEAT) approach, balancing quality and cost.
6. Submission requirements
Bidders must submit the following documentation:
- Method statement / response document: Adhere to the provided template with a maximum of 20 pages.
- CVs: Include CVs for key personnel, limited to 2 pages each.
- Pricing schedule: Complete the pricing schedule as per Appendix 2.
- Case studies: Provide 2 relevant case studies, each valued at a minimum of €50,000.
- Declarations: Include ESPD, Bona Fides, Tax clearance, and Conflict of Interest declarations.
- Mandatory site visit: Not specified for this tender.
- Submission portal: All documents must be submitted via the eTenders platform.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | 2026-04-16 |
| Clarification deadline | 2026-05-30 |
| Tender deadline | 2026-06-18 11:00 |
| Expected award | 2026-07-01 |
| Contract start | 2026-07-15 |
| Go-live / mobilisation | 2026-08-01 |
8. Contract terms that matter
Key contract terms include:
- Term: The contract will last for up to 24 months, with potential extensions based on project needs.
- Payment terms: Payments will be made in accordance with the Services Contract at Appendix 5.
- Key SLAs/KPIs: Specific performance indicators will be established to measure the success of the research.
- Termination clauses: Either party may terminate the contract with 30 days' written notice.
- IP ownership: All intellectual property generated during the contract will belong to TII.
- Sub-contracting rules: Sub-contracting is permitted but must be disclosed in the tender submission.
9. Risks, red flags & unusuals
Potential concerns include:
- The absence of specified turnover and past experience requirements may lead to a wider range of bidders, but could also dilute the quality of submissions.
- The contract's estimated value of €315,000 may attract bids that exceed the budget, particularly for Lot 1, which has a higher allocation.
- The lack of geographic constraints may encourage participation from a broader pool of firms, but could also result in challenges in managing remote teams.
10. SME fit assessment
This tender is suitable for small to medium-sized enterprises (SMEs) with expertise in environmental research and infrastructure projects.
- Credible bidders: Firms with experience in environmental assessments, particularly those with a background in transport infrastructure, will be well-positioned to bid.
- Consortium/sub-contracting: Bidders are encouraged to form consortia to enhance their capabilities, particularly for Lot 1.
- Indicative bid-prep effort: Approximately 10-15 days may be required to prepare a competitive bid.
- Pwin signal: The absence of an incumbent may provide an opportunity for new entrants, but the complexity of the research may favor established firms.
11. Where to dig deeper
- Source RFT filename: TII523 Open Call for Research 2026 RFT.pdf
- eTenders CFT ID: not specified
- Contact email: not specified
- Important attachments:
- Appendix 1 — Requirements and Specifications
- Appendix 2 — Pricing Schedule
- Appendix 5 — Services Contract
Can you bid?
Required certifications
- ISO 14001
Professional indemnity insurance
€500,000
Scoring
Most Economically Advantageous Tender
Lots (2)
Documents (11)
TII523_Lot_2_Service Requirements_Lifespan of Timber Posts Used in Road Boundary Fencing.pdf
745.4 KB · Specification
TII_523_Lot 1_Service Requierments_Total Cost and Total Value of Environmental Factors in Transport Infrastructure Projects.pdf
1.1 MB · Specification
TII523 Open Call for Research 2026 RFT.pdf
1.4 MB · RFT / Invitation to Tender
TII 523 Pricing Submission Template.xlsx
68.6 KB · Pricing / BOQ / Schedule of Rates
TII523_AI Tools Declaration.docx
62.6 KB · Form / Declaration / Certificate
TII523 Cover Note.pdf
582.0 KB · Other
TII523 TII Open Call for Research Tender Documents.zip
3.7 MB · Other
ESPD_2025 version_V2.8.docx
57.8 KB · ESPD (European Single Procurement Document)
Insurance Checklist_Updated.docx
23.8 KB · Insurance / Indemnity
TII523 Research Programme Submission Template.docx
61.1 KB · Tender Response Template
TII523 TII Open Call for Research Clarification Circular 3.pdf
465.0 KB · Clarification / Addendum
Original notice text
The main aim of the TII Research Programme is to enable TII to carry out its purpose “to deliver and maintain transport infrastructure and services enabling connectivity and regional development”. Research is one of the key ways that TII informs operational policy and sets standards. Emphasis is on: What is likely to be TII needs, Ensuring state-of-the art materials and techniques are used, Filling knowledge gaps where they exist, and Implementing the research conclusions and integrating the research outputs in a timely and effective way. The research program covers all areas of TII responsibility including planning, design, construction, maintenance and operations. TII523: Open Research Call 2026 consists of two lots: Lot 1: Consideration of total cost and total value of environmental factors in transport infrastructure projects. Lot 2: Research on the Assessment of the Lifespan of timber posts used in road boundary fencing. Refer to Project Specification for complete details on each lot. Estimated amount of €315,000 is for both lots; €255,000 for Lot 1 and €60,000 for Lot 2.
AI analysis updated 2 months, 2 weeks ago
Value
€315k
Deadline
18 Jun
Location
Not specified.
Procedure
Open
Clarification
30 May 2026
eTenders ID
7925324
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender