Remedial Conservation Works to the Rossmore Memorial Fountain
Deadline
14 Sep
14 Sep 2026
Deadline
14 Sep
Contractor needed for urgent conservation works on the Rossmore Memorial Fountain, a Victorian Gothic Revival protected structure in Monaghan town.
Monaghan County Council seeks contractor for remedial conservation works to Rossmore Memorial Fountain.
Bidder profile
Firms with specialised experience in heritage conservation, stonework repair, and working with protected structures, meeting specific turnover and insurance requirements.
Risks & flags
- Heritage focus required
- Phased funding may impact future work
- Limited information in extracts
- Constrained urban logistics
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Monaghan County Council |
|---|---|
| Title | Remedial Conservation Works to the Rossmore Memorial Fountain |
| CPV / category | not stated |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Monaghan, Ireland |
| Contract length | not stated |
| Submission deadline | 2026-09-14T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This tender seeks a contractor to undertake remedial conservation works to the Rossmore Memorial Fountain, a high-status Victorian Gothic Revival structure located in The Diamond, Monaghan. The monument is a Protected Structure and is included in the National Inventory of Architectural Heritage. The works are prioritised by urgency and available budget, with this phase focusing on urgent repairs, cleaning, and maintenance.
The proposed construction stage works include:
- Erection of scaffolding and edge protection.
- Access and public path control management.
- Establishment of contractor compound, welfare, and access arrangements.
- Interim overhead protection to the internal vault soffit and temporary weatherproofing measures.
- Recording, cataloguing, and secure storage of detached stone fragments.
- Inspection of stonework, including facilitation of the structural engineer’s inspection of the vault soffit.
- Repair of deteriorated stone, removal of defective cementitious repairs, lime-mortar repointing, and conservative cleaning.
- Mortar analysis, petrographic examination, and trial areas.
- Drainage and water-shedding improvements.
- Stone replacement as a last resort.
- Stabilisation of the vault soffit, including localised consolidation and pinning/dowelling of cracked slabs.
- Conservation of heraldic plaques and carved capitals.
- Incorporation of lead flashings and weathering details, if required.
- Removal of waste materials from site.
All works must be undertaken in accordance with planning conditions, conservation best practice, statutory obligations, and the Safety, Health and Welfare at Work (Construction) Regulations 2013. The project involves conservation-led stone repair, focusing on resolving immediate safety hazards such as the stabilization of the internal vault soffit. Works also include intervention on heraldic plaques, internal capitals, and biological and stain cleaning. The monument is a freestanding, openwork memorial fountain constructed between 1875–76. The fountain is no longer in use, and deterioration is significant in localised areas. The proposed construction duration is approximately 5-6 weeks.
3. Background & buyer context
Monaghan County Council is procuring remedial conservation works for the Rossmore Memorial Fountain. This structure is a Protected Structure (Record of Protected Structures Ref. 41001104) and is listed in the National Inventory of Architectural Heritage (NIAH Ref. 41303115). The monument, also known as the Rossmore Memorial Fountain, is a significant example of High Victorian Gothic Revival design, constructed between 1875 and 1876. It is a focal point in The Diamond, Monaghan town. The works are prioritised by urgency and available budget, with the current phase addressing immediate safety hazards, particularly the unstable internal vault soffit. The project aligns with the Council's responsibility for heritage asset management and public safety.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Minimum yearly turnover of €200,000 arising from Heritage Works.
- Insurance:
- Public Liability Insurance: Minimum indemnity limit of €6.5 million for any one accident. Maximum excess of €6,500.
- Employer's Liability Insurance: Minimum indemnity limit of €13.0 million for any one accident. Maximum excess of €6,500.
- Professional Indemnity Insurance: Minimum indemnity limit of €[16] (amount not specified in extract). Maximum permissible excess is the greater of 2% of the Tenderer’s annual turnover or €5,000. Cover is provided on an annual aggregate basis.
- Certifications: Not specified for this tender.
- Past experience: Bidders must provide a list of completed projects similar in nature and complexity to the works required. The specific number of projects, value, and time period are not detailed in the provided extract but will be found in Appendix B1.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria and scoring mechanism are not detailed in the provided extract. Typically, public sector tenders in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which balances price and quality. The specific weighting for price versus quality, and the sub-criteria for evaluating quality (e.g., technical approach, methodology, experience, personnel), would be detailed in the full tender documents.
6. Submission requirements
Bidders are required to submit the following:
- Appendix B1: List of completed works projects, organised by precedence and including project title and certificate of satisfactory execution.
- Appendix C: Bankers Letter on headed paper, confirming banking relationship and facilities.
- Preliminary Health & Safety Plan: This document is provided as part of the tender package, and the contractor will be required to develop a Construction Stage Safety and Health Plan.
- Pricing Schedule: Format and template not specified in the extract.
- Declarations: Not specified in the extract, but typically include ESPD, Bona Fides, Tax Clearance, and Conflict of Interest declarations.
- Mandatory site visit: Not specified in the extract.
- Submission portal: Bids must be submitted via eTenders. Specific format rules are not detailed in the extract.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline | 2026-09-14T15:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
8. Contract terms that matter
- Contract length: The appointment of the Project Supervisor starts on the date of the agreement and continues for as long as required under the Construction Regulations, unless terminated earlier. The construction duration is anticipated to be approximately 5-6 weeks.
- Payment terms: Payment for the Project Supervisor’s services is provided for under the Contract. The Client is not liable for the Project Supervisor’s fees or expenses under the Project Supervisor Agreement.
- Key SLAs/KPIs: Not specified in the extract.
- Liquidated damages or penalty regimes: Not specified in the extract.
- Termination clauses: The Client may terminate the Project Supervisor’s appointment if the Project Supervisor breaches its obligations or warranties, or if the Contractor’s duty to complete the Works is terminated under the Contract.
- IP ownership: Ownership of and copyright in Project Supervisor’s Documents become the Client’s upon delivery or termination.
- Sub-contracting rules: Not specified in the extract.
- Parent-company guarantee or bond requirements: Not specified in the extract.
9. Risks, red flags & unusuals
- Heritage focus: The tender specifically targets "Heritage Works" for the turnover requirement, indicating a need for specialised experience in conservation.
- Phased funding: The Preliminary Health & Safety Plan mentions that works have been prioritised by urgency to phase them to accommodate "funding restrictions," suggesting that future phases may be subject to separate procurement or funding availability.
- Limited Information: Several key documents and details (e.g., specific value, full award criteria, detailed submission requirements, contract length, start date) are not explicitly stated in the provided metadata and extracts, requiring bidders to consult the full tender package.
- Project Supervisor Role: The tender documents include a Project Supervisor Agreement, indicating a formal appointment structure for health and safety oversight during construction, which is standard for public works but requires specific attention from bidders.
- Urban Logistics: The site is in a constrained urban environment, necessitating careful planning for access, deliveries, public interface, and waste management.
10. SME fit assessment
This tender is likely suitable for small to medium-sized enterprises (SMEs) with demonstrable experience in heritage conservation and stonework. The turnover requirement of €200,000 specifically for Heritage Works suggests that firms with a focused specialisation in this area, rather than general construction, are being sought.
- Credible bidders: Firms with a proven track record in the conservation of historic buildings, monuments, and public structures, possessing the necessary accreditations and expertise in lime mortars, stone repair, and working with protected structures, would be well-positioned.
- Consortium/sub-contracting: The extract does not explicitly state whether consortium bids or subcontracting are permitted. However, given the specialised nature of heritage conservation, it is common for such tenders to allow for collaboration. Bidders should verify this in the full tender documents.
- Indicative bid-prep effort: Preparing a compliant bid for a heritage conservation project typically requires significant effort. This would involve detailed review of conservation specifications, historical research, development of a technical proposal, health and safety plan, and accurate pricing. An estimate of 10-20 days of dedicated effort for a small team is plausible, depending on the complexity and the bidder's existing documentation.
- Pwin signal: The specific heritage focus and the turnover requirement suggest that the buyer is looking for specialist contractors. The absence of an incumbent name in the provided text means it is difficult to assess incumbent strength. The tender appears open to new entrants with the right qualifications.
11. Where to dig deeper
- Source RFT filename(s): [260821 Rossmore Fountain - Tender Package.zip]
- eTenders CFT ID: Not surfaced in the provided text.
- Contact email or clarification portal: Not surfaced in the provided text.
- Most important attachments:
- [Appendix_B1_List_of_Previous_Works_Projects Heritage.docx]
- [Appendix_C_Bankers_Letter Heritage.docx]
- [26027_Rossmore M_PHSP.pdf] (Preliminary Health & Safety Plan)
Can you bid?
Minimum turnover
€200,000
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (19)
260821 Specification Document.pdf
478.1 KB · Specification
260821 Rossmore Fountain - Schedule of Works & Pricing.xlsx
13.0 KB · Pricing / BOQ / Schedule of Rates
Appendix_A_Applicants_Self-Declaration_Regulation_57 Heritage.docx
40.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services Heritage.docx
25.6 KB · Form / Declaration / Certificate
26027_Rossmore_Elevations_260817-2001.pdf
518.4 KB · Drawing / Plan / Layout
260205 Condition Report.pdf
7.4 MB
26027_Rossmore M_PHSP.pdf
913.5 KB
260821 Project Background Information.pdf
433.5 KB
260821 Rossmore Fountain - Tender Package.zip
10.9 MB
260824 Rossmore Monument Research.pdf
1.3 MB
Appendix_B1_List_of_Previous_Works_Projects Heritage.docx
31.3 KB · Appendix / Annex
Appendix_C_Bankers_Letter Heritage.docx
29.9 KB · Appendix / Annex
FTS-6_v1.7_06-11-2025 Heritage.docx
61.2 KB
ITTW4_Open_Heritage Monument v2.docx
58.1 KB
JobNumber_CRG_IS_00001_LIVE.xlsx
22.4 KB
MF_1.22_Project_Supervisor Heritage Project.docx
35.9 KB
QW2_Part_1_Heritage Monument.docx
193.4 KB
QW_Part_2_Heritage Monument.docx
58.1 KB
Original notice text
The project involves remedial conservation works to the Rossmore Memorial Fountain, a protected Victorian Gothic Revival monument (built 1875–76 by Robinson and Son of Belfast) located in The Diamond, Monaghan. The fountain is a significant architectural and historical landmark, originally erected to commemorate Henry Robert Westenra, 4th Baron Rossmore, and funded by public subscription. Project Objectives Stabilise and conserve the monument’s historic masonry and carved stonework, focusing on areas of active deterioration and public safety risks. Preserve original materials and craftsmanship using minimal intervention and reversible, lime-based conservation techniques. Maintain the monument’s role as the architectural centrepiece of Monaghan’s main public square, ensuring public safety and accessibility during works.
AI analysis updated 4 days, 13 hours ago
Deadline
14 Sep
Buyer
Monaghan County CouncilLocation
The Diamond, Monaghan town
Procedure
Open
eTenders ID
8911033