Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers
Closed Construction & Civil Engineering Works Open

Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers

Deadline

18 Aug

Experienced diving contractors sought for pile condition surveys at three Donegal piers, including ultrasonic thickness measurements and defect recording.

SME fit: Unknown Bid effort: Medium 📍 Donegal

Pile condition surveys for three piers in County Donegal

Bidder profile

Firms with specialized commercial diving capabilities and experience in structural inspections, particularly of marine infrastructure, and the ability to fulfil the Project Supervisor for Construction Stage role.

Risks & flags

  • Completion deadline before October 2026
  • Diving operations in potentially challenging conditions
  • PSCS role requirement

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Donegal County Council
Title Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers
CPV / category Not specified
Estimated value Not disclosed
Per-year Not stated
Procedure type Request for Quotation (RFQ)
Lots Not stated
Location County Donegal, Ireland
Contract length To be completed before October 2026
Submission deadline 2026-08-18T17:00:00+00:00
Go-live / start Not stated

2. Scope of Work

This procurement seeks experienced diving contractors to conduct pile condition surveys at three specific piers in County Donegal: Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore Island). The primary objective is to assess the current condition of existing steel sheet piles, identify any deterioration, and determine necessary repairs.

The survey will cover the piles from the top of the capping beam down to seabed level. Diving operations are a mandatory component of the work. Key activities and requirements include:

  • Pile Condition Assessment: Surveying all sheet piles within specified extents, marked in an appendix.
  • Thickness Measurement: Using ultrasonic measurement equipment to determine the residual thickness of the piles.
  • Measurement Intervals:
  • Readings at each in-pan and out-pan from capping beam to seabed at maximum 1-meter spacings.
  • Additional readings at the low water splash zone and 500mm above and below this zone for each pile.
  • Defect Identification and Recording:
  • Where holes or defects occur, or where thickness is less than 6mm, the defect or area should be recorded until the thickness exceeds 6mm.
  • All identified defects must be referenced, photographed, and their dimensions recorded in the final report.
  • Cleaning: The dive team must thoroughly clean away all marine growth to allow examination of all elements of the structure, both above and below water.
  • Reporting: Three separate final reports are required, one for each pier. Each report must identify each pile, detail thickness readings as specified, and include all defects with supporting photographs.
  • Project Supervisor (Construction Stage) Role: The successful contractor will be required to accept and carry out the role of Project Supervisor for the Construction Stage (PSCS).
  • Compliance: All diving operations must comply with the Safety, Health and Welfare at Work (Diving) Regulations 2018.
  • Volume Estimates:
  • Machaire Rabhartaigh (Magheroarty): Approximately 564 piles (388 for in/out pans, 176 for out pans only).
  • Ailt an Chorráin (Burtonport): Approximately 143 piles (out pans and in pans) plus 30 double piles supporting the main pier and supports.
  • Árainn Mhór (Arranmore) Island: Approximately 170 piles (out pans and in pans).
  • Completion Deadline: All survey works and final reports must be delivered in advance of October 2026 due to funding constraints.

3. Background & buyer context

Donegal County Council is procuring these pile condition surveys to assess the structural integrity of key maritime infrastructure. The project is driven by the need to identify deterioration and necessary repairs at Machaire Rabhartaigh, Ailt an Chorráin, and Árainn Mhór piers. The urgency is linked to funding constraints, necessitating completion before October 2026. The procurement is being conducted under a Request for Quotation (RFQ) process. Donegal County Council is the Contracting Authority, and it has self-appointed itself as the Project Supervisor for the Design Process (PSDP). The selection of the Project Supervisor for the Construction Stage (PSCS) will be based on prequalification and past experience, with the successful contractor expected to fulfil this role.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Employers Liability: €13,000,000.
  • Public Liability: €6,500,000.
  • Certifications:
  • Compliance with Safety, Health and Welfare at Work (Diving) Regulations 2018 is mandatory.
  • Evidence of carrying out the role of Project Supervisor Construction Stage is required.
  • Past experience:
  • At least two examples of projects with similar works carried out within the past 5 years. Details must include project extent and the bidder's specific role and responsibilities.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Not specified for this tender.

Additionally, bidders must confirm:

  • Tax compliance.
  • Not being bankrupt, guilty of corruption, fraud, money laundering, or membership of a criminal organisation.
  • Not involved in child labour or human trafficking.
  • Full compliance with all statutory obligations.

5. Award criteria & scoring

The evaluation process involves a two-stage assessment:

Criterion

Can you bid?

Required certifications

  • Safety, Health and Welfare at Work (Diving) Regulations 2018 compliance
  • Evidence of carrying out the role of Project Supervisor Construction Stage

Public liability insurance

€6,500,000

Named standards / methodologies

Safety, Health and Welfare at Work (Diving) Regulations 2018

Documents (8)

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

27.7 KB · Form / Declaration / Certificate

PDF

Arranmore Layout.pdf

459.4 KB · Drawing / Plan / Layout

PDF

Burtonport Layout.pdf

1.5 MB · Drawing / Plan / Layout

PDF

Magheroarty Layout.pdf

1009.3 KB · Drawing / Plan / Layout

DOCX

2 Quotation Response Document (QRD) 2025 (1).docx

73.4 KB · Tender Response Template

PDF

AF1 - Pile Survey - CR152945.pdf

34.3 KB

DOCX

Pier Pile Survey 2026 Prelim Safety and Health Plan.docx

268.9 KB

PDF

Pile Condition Survey 2026 RFQ Machaire Rabhartaigh, Ailt an Chorráin and Árrainn Mhór.pdf

535.5 KB

Original notice text

Donegal County Council is seeking to appoint a competent dive contractor to carry out a survey including ultra sonic thickness measure measurements of piles at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór piers in county Donegal.

AI analysis updated 1 month ago

Bid ↗
Details

Deadline

18 Aug

View on eTenders ↗

Location

Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore) Piers, County Donegal, Ireland.

Procedure

Open

eTenders ID

8765925

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender