Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers
Deadline
18 Aug
18 Aug 2026
Deadline
18 Aug
Experienced diving contractors sought for pile condition surveys at three Donegal piers, including ultrasonic thickness measurements and defect recording.
Pile condition surveys for three piers in County Donegal
Bidder profile
Firms with specialized commercial diving capabilities and experience in structural inspections, particularly of marine infrastructure, and the ability to fulfil the Project Supervisor for Construction Stage role.
Risks & flags
- Completion deadline before October 2026
- Diving operations in potentially challenging conditions
- PSCS role requirement
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Donegal County Council |
|---|---|
| Title | Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers |
| CPV / category | Not specified |
| Estimated value | Not disclosed |
| Per-year | Not stated |
| Procedure type | Request for Quotation (RFQ) |
| Lots | Not stated |
| Location | County Donegal, Ireland |
| Contract length | To be completed before October 2026 |
| Submission deadline | 2026-08-18T17:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
This procurement seeks experienced diving contractors to conduct pile condition surveys at three specific piers in County Donegal: Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore Island). The primary objective is to assess the current condition of existing steel sheet piles, identify any deterioration, and determine necessary repairs.
The survey will cover the piles from the top of the capping beam down to seabed level. Diving operations are a mandatory component of the work. Key activities and requirements include:
- Pile Condition Assessment: Surveying all sheet piles within specified extents, marked in an appendix.
- Thickness Measurement: Using ultrasonic measurement equipment to determine the residual thickness of the piles.
- Measurement Intervals:
- Readings at each in-pan and out-pan from capping beam to seabed at maximum 1-meter spacings.
- Additional readings at the low water splash zone and 500mm above and below this zone for each pile.
- Defect Identification and Recording:
- Where holes or defects occur, or where thickness is less than 6mm, the defect or area should be recorded until the thickness exceeds 6mm.
- All identified defects must be referenced, photographed, and their dimensions recorded in the final report.
- Cleaning: The dive team must thoroughly clean away all marine growth to allow examination of all elements of the structure, both above and below water.
- Reporting: Three separate final reports are required, one for each pier. Each report must identify each pile, detail thickness readings as specified, and include all defects with supporting photographs.
- Project Supervisor (Construction Stage) Role: The successful contractor will be required to accept and carry out the role of Project Supervisor for the Construction Stage (PSCS).
- Compliance: All diving operations must comply with the Safety, Health and Welfare at Work (Diving) Regulations 2018.
- Volume Estimates:
- Machaire Rabhartaigh (Magheroarty): Approximately 564 piles (388 for in/out pans, 176 for out pans only).
- Ailt an Chorráin (Burtonport): Approximately 143 piles (out pans and in pans) plus 30 double piles supporting the main pier and supports.
- Árainn Mhór (Arranmore) Island: Approximately 170 piles (out pans and in pans).
- Completion Deadline: All survey works and final reports must be delivered in advance of October 2026 due to funding constraints.
3. Background & buyer context
Donegal County Council is procuring these pile condition surveys to assess the structural integrity of key maritime infrastructure. The project is driven by the need to identify deterioration and necessary repairs at Machaire Rabhartaigh, Ailt an Chorráin, and Árainn Mhór piers. The urgency is linked to funding constraints, necessitating completion before October 2026. The procurement is being conducted under a Request for Quotation (RFQ) process. Donegal County Council is the Contracting Authority, and it has self-appointed itself as the Project Supervisor for the Design Process (PSDP). The selection of the Project Supervisor for the Construction Stage (PSCS) will be based on prequalification and past experience, with the successful contractor expected to fulfil this role.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Employers Liability: €13,000,000.
- Public Liability: €6,500,000.
- Certifications:
- Compliance with Safety, Health and Welfare at Work (Diving) Regulations 2018 is mandatory.
- Evidence of carrying out the role of Project Supervisor Construction Stage is required.
- Past experience:
- At least two examples of projects with similar works carried out within the past 5 years. Details must include project extent and the bidder's specific role and responsibilities.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
Additionally, bidders must confirm:
- Tax compliance.
- Not being bankrupt, guilty of corruption, fraud, money laundering, or membership of a criminal organisation.
- Not involved in child labour or human trafficking.
- Full compliance with all statutory obligations.
5. Award criteria & scoring
The evaluation process involves a two-stage assessment:
Criterion
Can you bid?
Required certifications
- Safety, Health and Welfare at Work (Diving) Regulations 2018 compliance
- Evidence of carrying out the role of Project Supervisor Construction Stage
Public liability insurance
€6,500,000
Named standards / methodologies
Documents (8)
Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
27.7 KB · Form / Declaration / Certificate
Arranmore Layout.pdf
459.4 KB · Drawing / Plan / Layout
Burtonport Layout.pdf
1.5 MB · Drawing / Plan / Layout
Magheroarty Layout.pdf
1009.3 KB · Drawing / Plan / Layout
2 Quotation Response Document (QRD) 2025 (1).docx
73.4 KB · Tender Response Template
AF1 - Pile Survey - CR152945.pdf
34.3 KB
Pier Pile Survey 2026 Prelim Safety and Health Plan.docx
268.9 KB
Pile Condition Survey 2026 RFQ Machaire Rabhartaigh, Ailt an Chorráin and Árrainn Mhór.pdf
535.5 KB
Original notice text
Donegal County Council is seeking to appoint a competent dive contractor to carry out a survey including ultra sonic thickness measure measurements of piles at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór piers in county Donegal.
AI analysis updated 1 month ago
Deadline
18 Aug
Buyer
Donegal County CouncilLocation
Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore) Piers, County Donegal, Ireland.
Procedure
Open
eTenders ID
8765925
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender