WCCC26 510 Tramore Inclusion Park Play Equipment Works
Deadline
14 Oct
14 Oct 2026
Deadline
14 Oct
Tender for refurbishment and installation of play equipment at Tramore Inclusion Park, Waterford, focusing on safety standards and material compliance.
Waterford City and County Council seeks contractors for Tramore Inclusion Park play equipment refurbishment.
Bidder profile
SMEs with specialised experience in playground equipment installation and refurbishment, possessing strong technical expertise in safety standards and the capacity to manage a short project timeline.
Risks & flags
- Unspecified contract value
- Very short 5-week completion time
- Potential for clarifications on scope
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Waterford City and County Council |
|---|---|
| Title | WCCC26 510 Tramore Inclusion Park Play Equipment Works |
| CPV / category | not stated |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | Open Procedure for Works Contractors |
| Lots | not stated |
| Location | Co. Waterford |
| Contract length | not stated |
| Submission deadline | 2026-10-14T14:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
This tender seeks contractors for refurbishment works at Tramore Inclusion Park, specifically concerning play equipment. The contract involves the supply, installation, and potentially refurbishment of play equipment, ensuring compliance with relevant safety standards.
Key activities and requirements include:
- Play Equipment Installation/Refurbishment: The core of the work involves installing new play equipment or refurbishing existing structures. This includes ensuring all equipment meets the minimum requirements for materials and safety.
- Material Compliance: Minimum requirements for principal materials are specified. This includes ensuring materials are of high quality, free from contaminants, and meet specific standards. For example, rubber mulch must be recycled, cleaned, and within a specified size range (10–20 mm).
- Impact Attenuation: All installations must comply with BS EN 1177 for the required Critical Fall Height (CFH). This ensures the safety surfacing beneath play equipment can adequately absorb impact.
- Swing Seat Specifications: Swing seats must be moulded from high-quality rubber, encasing an inner aluminium frame, and impact tested to BS EN 1176-2.
- Safety Standards Adherence: A primary requirement is strict adherence to European and Irish Standards for playground equipment and surfacing. This includes:
- BS EN 1176 Part 1-7 and EN 1177 by an accredited organisation.
- BS EN 1177:2018 for impact attenuation and CFH.
- BS EN 1176-1 for safety zones, free space, and fall heights.
- IS EN 1176 & IS EN 1177.
- Testing and Inspection: Equipment will need to be inspected, cleaned, and tested to confirm compliance with BS EN 1176.
- Sample Panel: A sample panel (minimum 1 m²) of the proposed polyurethane-bound mulch is required for assessment.
- Curing Time: Installed materials must be allowed to cure for a minimum of 24 hours before use.
- Project Supervisor Role: The contractor may be appointed as the Project Supervisor for the Construction Stage under the Safety, Health and Welfare at Work (Construction) Regulations 2013, if stated in the Schedule.
The contract duration is not explicitly stated, but the "Date for Substantial Completion of the Works" is indicated as 5 weeks.
3. Background & buyer context
This procurement is being conducted by Waterford City and County Council for works at Tramore Inclusion Park. The tender documents are based on templates published by the Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation, indicating adherence to national public procurement guidelines. The project focuses on play equipment refurbishment, suggesting a need to upgrade or replace existing facilities to meet current safety and accessibility standards. No specific programme or policy is explicitly cited as the driver, but the emphasis on "Inclusion Park" suggests a strategic aim to enhance public amenity spaces for all users. The incumbent contractor is not named.
4. Eligibility & selection criteria
Bidders must meet specific criteria to be considered eligible for this tender. These include:
- Turnover requirement: Not specified for this tender.
- Insurance:
- Public Liability Insurance: €6,500,000 for any one event.
- Employer's Liability Insurance: €13,500,000 for any one event.
- Maximum excess for public liability (property damage): €6,500.
- Maximum excess for employer's liability: €6,500.
- No excess for public liability (death, illness or injury).
- Certifications: Compliance with relevant European and Irish Standards is mandatory, including BS EN 1176 and BS EN 1177. Accreditation by organisations such as NPFA or ROSPA may be required for testing.
- Past experience: Not specified for this tender.
- Personnel: Not specified for this tender.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria will determine which tender is selected. The tender will be awarded based on the lowest price or the most economically advantageous tender (MEAT). The specific weighting for price versus quality is not detailed in the provided text. However, the evaluation process will assess tenders against suitability assessment criteria and award criteria. Any tender not complying with the Instructions to Tenderers may be rejected. The Contracting Authority reserves the right to seek clarification on submissions.
6. Submission requirements
Tenderers must submit their bids in accordance with the Instructions to Tenderers. The submission will consist of:
- Form of Tender and Schedule (Volume B): Completed and executed as indicated.
- SAQ Responses: Suitability Assessment Questionnaire responses.
- Pricing Document (Volume C): Completed.
- Works Proposals: Containing information specified in Appendix 1.
- Additional Information: As specified in Appendix 2.
Key submission details:
- Language: Tenders and all accompanying information must be in English. Original documents in other languages require an accurate translation.
- Format: If electronic submission is required, a read-only PDF copy of the Pricing Document must be submitted. The Contracting Authority may request native file and/or .csv formats.
- No Qualifications: Tenders must not be qualified in any way.
- Pricing: All sums must be in euro, to two decimal places, excluding VAT unless otherwise stated. No additional items or alterations to the Pricing Document are permitted, except where specified.
- Specialists: Any required Specialists must be named in the Schedule, Part 2E, and a letter of agreement from each must be provided.
- Project Supervisor: If applicable, the proposed Project Supervisor for the Construction Stage must be named.
- Signatures: The Form of Tender must be signed by authorised individuals and witnessed.
- Copies: If delivery is by hand or registered post, the number and type of paper and electronic copies must be included as stated in the Particulars.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | not stated |
| Clarification deadline | not stated |
| Mandatory site visit | not stated |
| Tender deadline | 2026-10-14T14:00:00+00:00 |
| Expected award | not stated |
| Contract start | not stated |
| Go-live / mobilisation | not stated |
The "Date for Substantial Completion of the Works" is stated as 5 weeks.
8. Contract terms that matter
- Contract Formation: The contract will be formed by the issue of a Letter of Acceptance, followed by the execution of an Agreement.
- Contract Documents: The contract will comprise the Agreement, Letter of Acceptance, Conditions of Contract, Works Requirements (Volume A), Form of Tender and Schedule (Volume B), completed Pricing Document (Volume C), and Works Proposals. Collateral warranties, performance bonds, or reliance guarantees may also be required.
- Payment: Payment terms are not detailed, but interim payments are mentioned, with claims to be submitted within 5 days of an agreed date. Payments are due within 21 days of invoice receipt.
- Liquidated Damages: A rate of €50 per day is specified for liquidated damages.
- Defects Liability: The contractor is required to maintain works in a proper state of repair for 12 months after the final Certificate of Completion.
- Sub-contracting: The use of named Specialists is permitted and required in certain instances.
- Tax Clearance: The successful tenderer must supply Tax Clearance Access Number and Tax Reference Number for online verification.
9. Risks, red flags & unusuals
- Unspecified Value: The estimated value of the contract is not disclosed, making it difficult for bidders to gauge the scale and potential profitability.
- Short Completion Time: The "Date for Substantial Completion of the Works" is stated as 5 weeks. This is a very tight timeframe for play equipment works and may present a significant risk for contractors if not adequately planned for.
- Lack of Specificity on Experience: While insurance requirements are detailed, there is no explicit mention of minimum past experience requirements in terms of project numbers, value, or type. This could lead to a wider range of bidder capabilities being submitted.
- Potential for Clarifications: The Instructions to Tenderers detail a process for queries and supplemental information, indicating that the scope or requirements might be clarified or amended during the tender period.
10. SME fit assessment
This tender is likely suitable for small to medium-sized enterprises (SMEs) with specialised experience in playground equipment installation and refurbishment. The key requirements revolve around technical compliance with safety standards (BS EN 1176, BS EN 1177) and the ability to manage a short, 5-week project timeline.
- Viable Bidders: An SME with a proven track record in installing playground equipment, possessing the necessary certifications and insurance, would be well-positioned. The emphasis on specific European standards suggests a need for technical expertise rather than general construction capability.
- Consortium/Sub-contracting: The documents do not explicitly prohibit consortiums or sub-contracting. However, the requirement to name Specialists suggests that the main contractor will be responsible for overall project delivery and coordination.
- Bid-Prep Effort: The effort to prepare a bid would depend on the SME's existing documentation for safety standards, insurance, and pricing templates. The need to detail Works Proposals and potentially Specialist agreements could add to the preparation time.
- Pwin Signal: There is no clear indication of an incumbent supplier. The short completion time and specific technical standards suggest that firms with direct experience in this niche are likely to be competitive. The absence of a stated value means it's hard to assess if it's a large or small contract in monetary terms.
11. Where to dig deeper
- Source RFT Filename: [4. ITT Tramore Inclusion Park (Play Equipment Contract).docx]
- eTenders CFT ID: Not specified in the provided text.
- Contact Email/Portal: Communications must be in writing via the means stated in the Particulars (not provided). Queries should be raised as soon as possible, no later than the date stated in the Particulars.
- Key Attachments:
- Volume A: Works Requirements
- Volume B: Form of Tender and Schedule
- Volume C: Pricing Document
- Appendix PW -CF11 Appointment of Project Supervisor
Can you bid?
Required certifications
- BS EN 1176
- BS EN 1177
- IS EN 1176
- IS EN 1177
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (12)
1. Volume A Works Requirements_Tramore Inclusive Park_PACK_2.docx
2.5 MB · Specification
DVK_005_LA_TD-12-PLAY EQUIPMENT SCHEDULE.pdf
4.8 MB · Specification
4. ITT Tramore Inclusion Park (Play Equipment Contract).docx
74.0 KB · RFT / Invitation to Tender
3. Volume C Pricing Document_Tramore Inclusive Park_PACK_2.docx
450.9 KB · Pricing / BOQ / Schedule of Rates
8. PW-CF5_Agreement_A1.dot
48.5 KB · Contract / Agreement / Terms
9. PW-CF5-Form of Contract.pdf
887.3 KB · Contract / Agreement / Terms
2. Volume B Form of Tender and Schedule.docx
50.7 KB · Form / Declaration / Certificate
DVK_005_LA_TD-05-PLAY EQUIPMENT DWG.pdf
1.2 MB · Drawing / Plan / Layout
WCCC26 510 Tramore Inclusion Tender Docs.zip
11.1 MB · Other
5. Appendix - WCCC Health Safety Questionnaire.docx
131.3 KB · Appendix / Annex
6. Appendix - Inclusion Park Preliminary HS Plan.docx
1.4 MB · Appendix / Annex
7. Appendix PW-CF11_Appointment_of_Project_Supervisor.doc
72.0 KB · Appendix / Annex
Original notice text
Waterford City and County Council is proposing to refurbish the existing Playground at the Promenade (L4144), Tramore, Co. Waterford. The current playground comprises of a number of solid timber play components and was constructed circa 10 years ago. Much of the equipment has deteriorated in recent years due to the exposed nature of the site and is now beyond its service life.
AI analysis updated 23 minutes ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender