Skip to content
TenderMatch
← Tenders / Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers
Open Construction & Civil Engineering Services SME Suitable Open

Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers

Deadline

22 Sep

Procurement for a diving contractor to conduct pile condition surveys at three piers in County Donegal, assessing steel sheet pile integrity and required repairs using ultrasonic measurements.

SME fit: High Bid effort: Medium 📍 Donegal

Donegal County Council seeks pile condition surveys for three piers

Bidder profile

This tender is suitable for specialist diving contractors with experience in structural surveys and project supervision, capable of operating in coastal environments and meeting stringent insurance and safety requirements.

Risks & flags

  • Coastal tidal water operations
  • Diving safety compliance
  • Tight deadline (Mid-October 2026)

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Donegal County Council
Title Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers
CPV / category Not specified
Estimated value Not disclosed
Per-year Not stated
Procedure type Request for Quotation (RFQ)
Lots Not stated
Location County Donegal, Ireland
Contract length Not stated
Submission deadline 2026-09-22T17:00:00+00:00
Go-live / start Not stated

2. Scope of Work

This procurement seeks a qualified diving contractor to conduct pile condition surveys at three specific piers in County Donegal: Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore Island). The primary objective is to determine the current condition of existing steel sheet piles, identify any deteriorating sections, and assess required repairs. The survey will involve ultrasonic measurement equipment to determine the residual thickness of the piles.

The scope of work includes:

  • Pile Condition Surveys:
  • Surveying steel sheet piled quay walls above and below water level.
  • Cleaning growth from the piles to enable examination of all elements from the high water level to the seabed.
  • Taking readings at a maximum of 1-meter spacings from high water level to seabed.
  • Taking additional readings at the low water splash zone, 500mm above and below each pile.
  • Recording any holes or defects, or areas where thickness is less than 6mm, detailing the extent of the defect or thickness.
  • Reporting:
  • Providing a detailed report for each of the three sites, resulting in three separate reports.
  • Each report must identify each pile surveyed and detail thickness readings as specified.
  • Including photographs of the condition of existing piles and each defect identified, clearly referenced on a plan drawing of the piles/pier.
  • The final report must be delivered in advance of Mid-October 2026.
  • Project Supervisor (Construction Stage) Role: The successful contractor will be required to accept and carry out the role of Project Supervisor Construction Stage (PSCS).
  • Compliance: All diving operations must comply with the Safety, Health and Welfare at Work (Diving) Regulations 2018.
  • Estimated Survey Volumes:
  • Machaire Rabhartaigh (Magheroarty): 64 piles to be surveyed (from 388 total).
  • Ailt an Chorráin (Burtonport): 39 piles to be surveyed (from 143 total, plus 10 double piles from 30).
  • Árainn Mhór (Arranmore) Island: 34 piles to be surveyed (from 170 total).

The work will require operations over, beside, and in coastal tidal water. A Traffic Management Plan will be required where necessary.

3. Background & buyer context

Donegal County Council is procuring these pile condition surveys due to funding constraints that necessitate completion before Mid-October 2026. The project is part of the Council's ongoing management and maintenance of its harbour infrastructure. The surveys are intended to assess the structural integrity of the piers and inform future maintenance or repair strategies. The procurement is being conducted via a Request for Quotation (RFQ) process, indicating a need for a focused, potentially shorter-term engagement for a specific technical service. The Council encourages participation by Small and Medium Enterprises (SMEs) and suggests exploring collaborations if capacity requirements are a concern.

4. Eligibility & selection criteria

Bidders must meet the following criteria to be considered:

  • Turnover requirement: Not specified for this tender.
  • Insurance:
  • Employers Liability: €13,000,000
  • Public Liability: €6,500,000
  • Certifications:
  • Compliance with Safety, Health and Welfare at Work (Diving) Regulations 2018 is mandatory.
  • Evidence of carrying out the role of Project Supervisor Construction Stage (PSCS) is required.
  • Past experience:
  • At least two examples of similar works carried out in the past 5 years, detailing the extent of the project and the bidder's specific role and responsibilities.
  • Personnel:
  • A dedicated account manager must be nominated with authority to deal with all contract matters.
  • All diving operations must be completed by a competent and trained dive team.
  • Geographic / facility constraints: Not specified for this tender.
  • Other:
  • Bidders must complete a Quotation Response Document (QRD) and a pricing schedule without alteration.
  • Confirmation of tax compliance is required.
  • Declaration of no bankruptcy, corruption, fraud, money laundering, involvement in child labour or human trafficking, and full compliance with statutory obligations.
  • A quotation validity period of 180 days is required.

5. Award criteria & scoring

Criterion

until submission deadline — 22 Sep 2026 at 18:00 Deadline passed

Can you bid?

Required certifications

  • Safety, Health and Welfare at Work (Diving) Regulations 2018 compliance
  • PSCS experience

Public liability insurance

€6,500,000

Named standards / methodologies

Safety, Health and Welfare at Work (Diving) Regulations 2018

Documents (9)

DOCX

Pier Pile Survey 2026 Prelim Safety and Health Plan.docx

268.9 KB · Specification

PDF

Pile Condition Surveys 2026 (RFQ) Magheroarty, Burtonport & Arranmore Island Reduced Scope.pdf

518.5 KB · RFT / Invitation to Tender

PDF

AF1 - Pile Survey - CR152945.pdf

34.3 KB · Form / Declaration / Certificate

DOCX

Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

27.7 KB · Form / Declaration / Certificate

PDF

Arranmore Layout.pdf

459.4 KB · Drawing / Plan / Layout

PDF

Burtonport Layout.pdf

1.5 MB · Drawing / Plan / Layout

PDF

Magheroarty Layout.pdf

1009.3 KB · Drawing / Plan / Layout

ZIP

Tender Upload Reduced scope.zip

3.6 MB · Other

DOCX

2 Quotation Response Document (QRD) 2025 (1).docx

73.4 KB · Tender Response Template

Original notice text

Donegal County Council is seeking to appoint a competent dive contractor to carry out a survey including ultra sonic thickness measure measurements of piles at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór piers in county Donegal. This tender is a reduced scope pf the orignal tender - "Pile condition Survey at Machaire Rabhartaigh, Ailt an Chorráin and Árainn Mhór Piers - Donegal County Council"

AI analysis updated 22 minutes ago

Bid ↗
Details

Deadline

22 Sep

View on eTenders ↗

Location

Machaire Rabhartaigh (Magheroarty), Ailt an Chorráin (Burtonport), and Árainn Mhór (Arranmore) Piers, County Donegal, Ireland.

Procedure

Open

eTenders ID

9083789

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender