Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Mary Immaculate College - Summerville Lodge and Small Mount Building Works
Closed Construction & Civil Engineering Works SME Suitable Open

Mary Immaculate College - Summerville Lodge and Small Mount Building Works

Deadline

11 May

Building works at Mary Immaculate College for Summerville Lodge and Small Mount.

SME fit: Medium Bid effort: Medium 📍 Limerick

Building works at Mary Immaculate College for Summerville Lodge and Small Mount.

Bidder profile

This opportunity is suitable for SMEs or mid-market contractors with strong compliance and bid management capabilities.

Risks & flags

  • strict procurement timelines
  • mandatory compliance requirements

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Mary Immaculate College
Title Mary Immaculate College - Summerville Lodge and Small Mount Building Works
CPV / category works
Estimated value not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-10T23:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought works under the title "Mary Immaculate College - Summerville Lodge and Small Mount Building Works" for Mary Immaculate College. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included € 4,500,000, €1.5, 2%, €5,000, € 6,500,000, € 10,000, € 13,000,000, €6,500,000.

Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[14] € 4,500,000 *CA Note: if stating a minimum yearly. * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[16] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m). * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate. Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect. Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing. Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu.

3. Background & buyer context

The process was run by Mary Immaculate College with deadline recorded as 2026-05-10T23:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[14] € 4,500,000 *CA Note: if stating a minimum yearly; * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[16] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value not disclosed (eTenders placeholder). Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction/Civil Engineering category[14] € 4,500,000 *CA Note: if stating a minimum yearly; * The professional insurance indemnity requirements are as follows: The level of cover as stated here: Minimum level of Professional Indemnity Insurance required for € N/A[16] *CA Note: state the minimum cover proportionate to the size of the project (default level is €1.5m); * The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the will bear the cost is the greater amount of 2% of the Tenderer’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the will bear the cost: € 10,000 *No excess is permitted in respect; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing; Minimum indemnity limit for Public liability insurance: €6,500,000[7] for any one event, bu. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-10T23:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: c9ebad88-b558-433b-9576-47560538166b.

Can you bid?

Required certifications

  • Tax Clearance Certificate
  • Enrolment on professional or trade register
  • Employer's Liability insurance certificate
  • Public Liability insurance certificate
  • Professional Indemnity insurance certificate or letter of undertaking

Minimum turnover

€4,500,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Technical Merit

60%

Price

40%

Lots (1)

Lot 1: Decarbonisation Works

Comprehensive refurbishment and decarbonisation of the Small Mount Building.

Documents (63)

PDF

Specification Document.pdf

2.1 MB · Specification

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

59.1 KB · Contract / Agreement / Terms

PDF

2526-X-XXX-DR-QNA-AR-5500 A2.pdf

479.2 KB · Drawing / Plan / Layout

PDF

2526-X-XXX-DR-QNA-AR-5530 A2.pdf

587.5 KB · Drawing / Plan / Layout

PDF

2527-X-XXX-DR-QNA-AR-5501_ A2.pdf

578.9 KB · Drawing / Plan / Layout

PDF

2527-X-XXX-DR-QNA-AR-5502_ A2.pdf

391.3 KB · Drawing / Plan / Layout

PDF

2527-X-XXX-DR-QNA-AR-5503_ A2.pdf

756.2 KB · Drawing / Plan / Layout

PDF

2527-X-XXX-DR-QNA-AR-5505_ A3.pdf

312.2 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-V1-XX-RG-E-6900 (A4) (C01) - Electrical Drawing Register.pdf

306.3 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-V1-XX-RG-M-5900 (A4) (C01) - Mechanical Drawing Register.pdf

307.6 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-6040 (A4) (C01)-A3.pdf

180.6 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-6100 (A4) (C01)-A3.pdf

500.6 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-6200 (A4) (C01)-A3.pdf

492.9 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-6300 (A4) (C01)-A3.pdf

346.0 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-6500 (A4) (C01)-A3.pdf

438.5 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-8000 (A4) (C01)-A3.pdf

368.0 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-8001 (A4) (C01)-A3.pdf

333.3 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-E-8002 (A4) (C01)-A3.pdf

344.8 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-M-5010 (A4) (C01)-A3.pdf

420.1 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-M-5200 (A4) (C01)-A3.pdf

403.8 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-M-5600 (A4) (C01)-A3.pdf

581.6 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-M-5700 (A4) (C01)-A3.pdf

241.2 KB · Drawing / Plan / Layout

PDF

26.3126-MFC-XX-00-DR-M-6000 (A4) (C01)-A3.pdf

346.0 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-00-DR-B-9100 (A4) (C01)-A3.pdf

266.1 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-00-DR-M-5700 (A4) (C01)-A3.pdf

531.3 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-00-DR-M-8000 (A4) (C01)-A3.pdf

434.1 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-XX-RG-B-9200 (A4) (C01) - Builders Work Drawing Register.pdf

305.0 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-XX-RG-E-6900 (A4) (C01) - Electrical Drawing Register.pdf

306.8 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-V1-XX-RG-M-5900 (A2) (C01) - Mechanical Drawing Register.pdf

307.1 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-XX-00-DR-E-6200 (A4) (C01)-A3.pdf

287.2 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-XX-00-DR-E-8000 (A4) (C01)-A3.pdf

544.2 KB · Drawing / Plan / Layout

PDF

26.3127-MFC-XX-00-DR-E-8001 (A4) (C01)-A3.pdf

355.1 KB · Drawing / Plan / Layout

PDF

2526-X-XXX-M2-QNA-AR-5510 A2.pdf

803.7 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-5520 A2.pdf

541.4 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-5540 A2.pdf

680.8 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-5550 A2.pdf

252.8 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-5560 A2.pdf

940.7 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-5570 A2.pdf

547.2 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-6000 A2.pdf

314.3 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-8000 A2.pdf

237.9 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-8001 A2.pdf

238.7 KB · Other

PDF

2526-X-XXX-M2-QNA-AR-8050 A2.pdf

251.3 KB · Other

PDF

2527-X-XXX-IS-QNQ-AR-0001_Document Issue Sheet.pdf

643.0 KB · Other

PDF

26.3126-MFC-V1-XX-BW-B-9200 - Builders Work Document Register.pdf

304.7 KB · Other

PDF

26.3126-MFC-V1-XX-BW-B-9200.pdf

267.9 KB · Other

PDF

26.3126-MFC-V1-XX-SP-E-6900 (A4) (C01).pdf

1.5 MB · Other

PDF

26.3126-MFC-V1-XX-SP-M-5900 (A4) (C01).pdf

1.8 MB · Other

PDF

26.3126-MFC-XX-00-SC-E-6200 (A4) (C01)-A3.pdf

243.1 KB · Other

PDF

26.3127-MFC-V1-XX-SP-E-6900 (A4) (C01).pdf

1.4 MB · Other

PDF

26.3127-MFC-V1-XX-SP-M-5900 (A4) (C01).pdf

1.7 MB · Other

PDF

26024 MIC Small Mount PSHP 27.03.26.pdf

2.0 MB · Other

PDF

26024 MIC Summerville Lodge PSHP 27.03.26.pdf

2.6 MB · Other

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025 (2).docx

55.3 KB · Other

PDF

Architectural Issue Sheet.pdf

645.2 KB · Other

DOCX

FTS-5-v2.7-09-01-2025.docx

107.8 KB · Other

PDF

Ironmongery schedule-Small Mount Building.pdf

87.8 KB · Other

DOCX

ITT-W2-v3.0-18-11-24-23-01-25.docx

82.8 KB · Other

OTHER

plot.log

2.8 KB · Other

DOCX

PRELIMS MIC Summerville Lodge & Small Mount Building.docx

105.3 KB · Other

DOCX

QW2_Part_1_v2.2_25-11-2025 (1).docx

200.1 KB · Other

DOCX

QW_Part_2_v1.1_18-11-2024 (3).docx

71.2 KB · Other

XLSX

Summerville & Small Mount Tender April 2026.xlsX

78.9 KB · Other

OTHER

Summerville Lodge & Small Mount Tender April 2026.e0x

74.3 KB · Other

Original notice text

SUMMERVILLE LODGE - The removal of all loose furniture and fitted furniture to be stored in a container on site (location to be agreed on site). Removal of all plaster to highlighted areas and replaced with a new special dry lining system. Removal and re-fitting of all fitted shelving and storage units then full decorations to all walls and ceiling including re-glossing of all woodwork. All furniture to be reinstalled. SMALL MOUNT - The removal and replacement of all doors and windows both internally and externally. Remove and replace all floor coverings, architraves, skirting boards, remove and re-fit all sanitaryware to facilitate works. Remove all external wall plaster/wall linings and replace with new insulated wall lining system with full redecorations throughout. New insulated walkway system in attic space to facilitate new ME requirements. New ceilings and loft insulation. ME as per Engineers requirements

AI analysis updated 4 months ago

Bid ↗
Details

Deadline

11 May

View on eTenders ↗

Location

Small Mount Building, Mary Immaculate College, Limerick

Procedure

Open

Clarification

11 May 2026

eTenders ID

7883338

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender