Meath Co Co MH-TRA-26- 07 Tree Survey for the Boyne Greenway: Navan to Oldbridge
Deadline
07 May
07 May 2026
Deadline
07 May
Tree survey for the Boyne Greenway from Navan to Oldbridge by Meath County Council
Tree survey for the Boyne Greenway from Navan to Oldbridge by Meath County Council
Bidder profile
This tender is suitable for SMEs or lower-mid-market contractors with strong compliance and execution capabilities.
Risks & flags
- Compliance requirements
- Insurance thresholds
- Submission deadlines
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Meath County Council |
| Title | Meath Co Co MH-TRA-26- 07 Tree Survey for the Boyne Greenway: Navan to Oldbridge |
| CPV / category | Agriculture & Forestry |
| Estimated value | not disclosed (eTenders placeholder) |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-05-07T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The contracting authority sought agriculture & forestry under the title "Meath Co Co MH-TRA-26- 07 Tree Survey for the Boyne Greenway: Navan to Oldbridge" for Meath County Council. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included € 6,500,000, € 10,000, € 13,000,000, €13, €6.5, €2, € 2.000, € 12.
Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € 10,000 From start to completion of the Service. Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the S. Employers Liability €13m � CC and landowners. Employers Liability €13m Public Liability €6.5m Professional Indemnity €2m ▪ The. (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each and Every claim basis Cover on an Annual Aggregate basis € 2.000.00011 € 12 Maximum level of excess in an. 2 16 Minimum level of Public Liability Insurance required in respect of any one accident: € 6.500.00013 Maximum level of excess for property only.
3. Background & buyer context
The process was run by Meath County Council with deadline recorded as 2026-05-07T11:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.
4. Eligibility & selection criteria
Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € 10,000 From start to completion of the Service; Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the S; Employers Liability €13m � CC and landowners; Employers Liability €13m Public Liability €6.5m Professional Indemnity €2m ▪ The; (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each and Every claim basis Cover on an Annual Aggregate basis € 2.000.00011 € 12 Maximum level of excess in an. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.
5. Award criteria & scoring
Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.
6. Submission requirements
Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.
7. Key dates & process
Commercial baseline in metadata showed estimated value not disclosed (eTenders placeholder). Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.
8. Contract terms that matter
Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Public Liability for death, personal injury [except EL, next type]; loss of, damage to, property; with indemnity to the Client as principal € 6,500,000 € 10,000 From start to completion of the Service; Employers’ Liability for death, injury, to employees € 13,000,000 None From start to completion of the S; Employers Liability €13m � CC and landowners; Employers Liability €13m Public Liability €6.5m Professional Indemnity €2m ▪ The; (i) Level of cover and excess as stated below for the Principal Service Provider: Minimum level of Professional Indemnity Insurance complying with the conditions below: Cover on Each and Every claim basis Cover on an Annual Aggregate basis € 2.000.00011 € 12 Maximum level of excess in an; 2 16 Minimum level of Public Liability Insurance required in respect of any one accident: € 6.500.00013 Maximum level of excess for property only. No submission should proceed with unresolved redlines on non-negotiable risk positions.
9. Risks, red flags & unusuals
Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-07T11:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.
10. SME fit assessment
- Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
- Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
- Lock technical method narrative to the scored criteria language and remove non-scoring text.
- Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
- Submit early on the portal and retain timestamped proof of upload and final file set.
11. Where to dig deeper
This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: ccea7b20-856e-4f2b-80d9-bf7304180205.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€100,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€2,000,000
Scoring
Most Economically Advantageous Tender
Documents (12)
Volume A(i)_Specification and RFQ.pdf
1.6 MB · Specification
Volume B_FTS.pdf
433.4 KB · RFT / Invitation to Tender
Volume D_ITT.pdf
599.1 KB · RFT / Invitation to Tender
Volume C_Pricing Document.pdf
118.3 KB · Pricing / BOQ / Schedule of Rates
Volume A(ii)_Contract.pdf
424.3 KB · Contract / Agreement / Terms
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
Tree Locations Drawings.pdf
159.9 MB · Drawing / Plan / Layout
Appendix_B1_QC1_and_QC2_09-02-2022 (7).docx
16.6 KB · Appendix / Annex
ESPD Template 2026.docx
95.2 KB · ESPD (European Single Procurement Document)
Volume A(i)_Appendix C - MCC Data Protection Policy.pdf
1.6 MB
Volume A(i)_Appendix D - External OSH Prequalification Questionnaire.docx
118.7 KB · Appendix / Annex
Volume E_SAQ.pdf
1.4 MB · ESPD (European Single Procurement Document)
Original notice text
Tree Survey along the preferred route from Andy Brennan Park, Navan to Oldbridge, Drogheda
AI analysis updated 2 months, 3 weeks ago
Deadline
07 May
Buyer
Meath County CouncilLocation
Services to be provided across various agricultural sites in Meath County.
Procedure
Open
Clarification
07 May 2026
eTenders ID
7918920
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender