Cliff Protection at Dunmore East Fishery Harbour Centre, Co. Waterford
Deadline
13 Oct
13 Oct 2026
Deadline
13 Oct
Original notice text
The proposed Cliff Protection at Dunmore East Fishery Harbour Centre will include the following: • Site clearance, vegetation clearance and dentition (removal of weak rock) to the rock face. • Provision of approx. 126 meters of 1-meter concrete buttress along base of cliff face. • Removal and rebuild of approx. 126 metres of stone masonry wall along the Dock Road at top of the cliff. • Installation of rock bolts to approx. 100 metres of cliff face, to include for head plates and appropriate erosion protection rock netting. • Improvements to strength of cliff face by shotcrete and concrete infill where identified. • Installation of approx. 12 metres high retaining wall, approx. 45 metres long with concrete and soil infill as specified. Façade on retaining wall to match existing cliff face. • Installation of drainage system to cliff face and connection to existing on-site drainage network. • All associated ancillary works. • Installation of artificial bird nesting ledges for biodiversity enhancement.
AI analysis updated 13 hours, 31 minutes ago
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender