Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Mechanical Services Installations for Multi-Tertiary Education Building
Closed Construction & Civil Engineering Works Open

Mechanical Services Installations for Multi-Tertiary Education Building

Value

€7.9m

Deadline

31 Aug

Tender for mechanical services installations including supply, installation, testing, and commissioning of various systems for a new multi-tertiary education building.

SME fit: Low Bid effort: High 📍 Louth

Mechanical services installation tender for Drogheda Institute of Further Education

Bidder profile

Established mechanical services contractors with significant experience in educational or institutional building projects, capable of managing complex installations and extensive certification requirements.

Risks & flags

  • Extensive and specific certification requirements
  • Detailed product and installation specifications
  • High turnover and insurance requirements
  • Lack of stated contract value
  • Lack of explicit award criteria detail

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Drogheda Institute of Further Education (DIFE)
Title Unknown
CPV / category Not specified
Estimated value Not disclosed
Per-year (if multi-year) Not specified
Procedure type Not specified
Lots Not specified
Location Drogheda, Co. Louth
Contract length Not specified
Submission deadline Not stated
Go-live / start Not stated

2. Scope of Work

This tender concerns the provision of mechanical services installations for a multi-tertiary education building at DIFE in Drogheda, Co. Louth. The scope encompasses the supply, installation, testing, and commissioning of various mechanical systems, along with the provision of all necessary ancillary certificates and documentation.

The contractor will be responsible for:

  • Ancillary Certificates: Providing a comprehensive schedule of ancillary certificates for mechanical services. This includes:
  • Ancillary Certificate of Compliance on Completion from the Mechanical Sub-Contractor (CIF-01).
  • Ancillary Certificates of Compliance from specialist sub-sub-contractors for:
  • Flue Specialist (Design commencement, Design completion, Inspection, and on Completion - RIAI ACD 02, RIAI ACCD 02, RIAI ACI 02, CIF-02).
  • Air Source Heat Pump Specialist Installer (on Completion - CIF-02).
  • Underfloor Heating Specialist Installer (on Completion - CIF-02).
  • Mechanical Heat Recovery Ventilator Specialist (on Completion - CIF-02).
  • Ductwork/Ventilation Installer (on Completion - CIF-02).
  • Fire / Smoke Damper Installer Specialist (on Completion - CIF-02).
  • Fire Fighting Equipment Specialist (on Completion).
  • Registered Gas Installer (on Completion - CIF-02).
  • BEMS Specialist (on Completion - CIF-02).
  • Testing and Commissioning: Executing and documenting all required testing and commissioning for the installed mechanical systems. This includes:
  • Air Source Heat Pumps Commissioning Certificates.
  • LPHW Heating Boilers commissioning certificate.
  • LPHW Heating Pressurisation Unit commissioning certificate.
  • LPHW Heating Circulating Pumps commissioning certificate.
  • LPHW Heating system pipework pressure test certificate.
  • LPHW Heating system hydraulic balancing commissioning certificate.
  • LPHW Heating system inhibitor chemical dosing certificate.
  • Underfloor Heating Specialists Installation commissioning certificates.
  • UFH wiring stations commissioning certificate.
  • Domestic Hot Water Generator commissioning certificate.
  • Domestic Hot Water Return Pump commissioning certificate.
  • Cold Water Booster Set commissioning certificate.
  • Plumbing system pipework pressure test certificate (Mains/Cold/Hot Water).
  • Plumbing systems sterilisation/chlorination certificates.
  • Hot water return system thermal balancing commissioning certificate.
  • Thermostatic mixing valves commissioning certificate (Fail safe).
  • Gas pipework pressure test certificate.
  • Gas Leak Detection commissioning certificate.
  • Gas Pressure Proving commissioning certificate.
  • Gas Installation Declaration of Conformance Certificate.
  • Sign off of gas installation by Registered Gas Installer (RGI).
  • Mechanical Heat Recovery Ventilators commissioning certificates.
  • General ventilation air balancing commissioning certificates.
  • Fire / Smoke Damper commissioning certificates.
  • Fire Extinguisher report in accordance with IS291:2015.
  • BEMS test and commissioning certificates.
  • Mechanical Contractor’s Opinion on Compliance: Providing a letter from the Mechanical Contractor confirming installation in accordance with drawings, specifications, and Building Regulations.
  • Operation and Maintenance Manuals: Supplying comprehensive O&M manuals, including as-built drawings and test certificates for the mechanical services installation.

The project involves detailed specifications for various components, including sanitaryware, doors, and screens, indicating a requirement for precise installation and adherence to standards.

3. Background & buyer context

This procurement is for the Drogheda Institute of Further Education (DIFE), a facility operated by Louth & Meath Education & Training Board. The project involves the extension and fit-out of the existing DIFE campus to provide multi-tertiary education facilities. The tender documents, including door and sanitaryware schedules, indicate a focus on modern educational and practical training spaces, such as changing rooms, showers, WCs, offices, classrooms, and specialised practice areas like nursing and dental studies. The project requires adherence to current Building Regulations, Irish Standards (IS), British Standards (BS), and relevant Technical Guidance Documents (TGDs), including those related to fire safety and disability access. The documentation suggests a project timeline culminating in 2026, with specific dates for product certification and certificate issuance.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover requirement:
  • Average annual turnover of €6,000,000 in General Construction over the last three years.
  • Evidence of existence for a minimum of 3 years with effective turnover over the last 3 years not less than the required amount.
  • Insurance:
  • Public Liability Insurance: Minimum €6,500,000 per accident.
  • Employer’s Liability Insurance: Minimum €13,000,000 per accident.
  • Professional Indemnity Insurance: Minimum €1,500,000 in the annual aggregate limit.
  • Sub-contractor Professional Indemnity Insurance: Minimum €6,500,000.
  • Certifications:
  • Not specified for this tender.
  • Past experience:
  • A list of at least 20 completed projects similar in nature and complexity to the works required, organised in order of precedence.
  • Personnel:
  • Contracts Manager: Minimum 10 years' experience in the Building Trade, including at least 5 years in a management role, or equivalent qualifications/training.
  • Health and Safety Manager: Minimum 5 years' experience in the Building Trade, with a Degree/diploma or equivalent H&S training, or at least 3 years acting as H&S Manager on building projects.
  • Foreman: Minimum 7 years' experience in the Building Trade, including at least 3 years as a Foreman.
  • Site Safety Officer: Minimum 5 years' experience in the Building Trade and formal H&S training (minimum 4 hours externally accredited CPD).
  • Sufficient staff to carry out the project, considering turnover and workload.
  • Geographic / facility constraints:
  • Not specified for this tender.

5. Award criteria & scoring

The award criteria are not explicitly detailed with scoring percentages in the provided extract. However, the tender process will likely follow a standard public procurement model, typically involving a Most Economically Advantageous Tender (MEAT) approach, balancing price and quality. The selection criteria, particularly regarding experience and insurance, suggest that quality and demonstrated capability will be significant factors. Bidders must meet all mandatory requirements to be considered for evaluation.

6. Submission requirements

Bidders are required to submit the following:

  • List of Previous Works Projects: A completed Appendix B1 detailing at least 20 previous projects similar in nature and complexity, organised in order of precedence and matching certificate details.
  • Banker's Letter: A letter from the applicant's principal banker confirming banking history and facilities, as per Appendix C.
  • Ancillary Certificates: A comprehensive schedule of ancillary and commissioning certificates for mechanical services, as detailed in the "Schedule of Mechanical Certs 2999.pdf".
  • Declarations:
  • Bona Fides declarations.
  • Tax clearance certificates.
  • Evidence of sub-contractor's Professional Indemnity Insurance (€6.5 million minimum).
  • Pricing Schedule: Not explicitly detailed in the provided text, but a standard requirement.
  • Method Statement / Response Document: Not explicitly detailed in the provided text.
  • CVs: Not explicitly detailed in the provided text.
  • Case Studies: Not explicitly detailed in the provided text.
  • Mandatory Site Visit: Not specified in the provided text.
  • Submission Portal: Bids are to be submitted via eTenders.

7. Key dates & process

Event Date/Time
RFT issued Not stated
Clarification deadline Not stated
Tender deadline Not stated
Expected award Not stated
Contract start Not stated
Go-live / mobilisation Not stated

8. Contract terms that matter

  • Contract Length & Extensions: Not specified in the provided text.
  • Payment Terms: Not specified in the provided text.
  • SLAs/KPIs: Not specified in the provided text.
  • Liquidated Damages: Not specified in the provided text.
  • Termination Clauses: Not specified in the provided text.
  • IP Ownership: Not specified in the provided text.
  • Sub-contracting Rules: Sub-contractors must hold minimum €6.5 million Professional Indemnity Insurance.
  • Parent Company Guarantee/Bond: Not specified in the provided text.

9. Risks, red flags & unusuals

  • Extensive Certification Requirements: The sheer volume and specificity of required ancillary and commissioning certificates for mechanical services present a significant administrative and compliance burden. Failure to provide any of these could lead to disqualification.
  • Detailed Product Specifications: The detailed schedules for sanitaryware, doors, and screens indicate a high level of specification. Bidders must ensure their proposed materials and installations precisely match these requirements, leaving little room for deviation.
  • Implicit Quality Focus: While not explicitly detailed, the stringent experience and insurance requirements, combined with the detailed certification schedule, suggest a strong emphasis on quality and proven capability over price alone.
  • Lack of Tender Value: The absence of an estimated contract value makes it difficult for bidders to gauge the scale of the project and assess the proportionality of the requirements.

10. SME fit assessment

This tender is likely best suited for established mechanical services contractors with a proven track record in educational or institutional building projects. The requirement for a minimum of 20 previous similar projects, coupled with the significant turnover and insurance requirements, suggests that very small or newly formed businesses may find it challenging to meet the eligibility criteria.

  • Credible Bidders: Firms with substantial experience in managing complex mechanical installations, particularly in public sector or educational environments, and who can demonstrate robust H&S management systems and a strong supply chain for specialist sub-contractors, are well-positioned.
  • Consortium/Sub-contracting: While sub-contracting is permitted for specific elements (e.g., flue specialists, heat pumps), the primary bidder must meet the main turnover and experience criteria. Consortium bids are not explicitly mentioned but would likely need to demonstrate how the combined entity meets all requirements.
  • Indicative Bid-Prep Effort: Preparing a compliant bid, particularly gathering all necessary certification evidence and detailing the experience of key personnel, would require significant effort, likely several weeks of dedicated work for a small team.
  • Pwin Signal: The extensive documentation and detailed requirements suggest a well-defined project. The lack of a stated value and the absence of a clear award matrix make it difficult to assess the Pwin. However, the emphasis on certification and experience points towards a preference for established, compliant providers.

11. Where to dig deeper

  • Source RFT Filename(s): "2026-07-08 Schedule of Mechanical Certs 2999.pdf", "Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx", "23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf", "23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf", "Appendix-C-Bankers-Letter.docx", "23-16 - Sanitaryware Schedule Rev B.pdf".
  • eTenders CFT ID: Not specified in the provided text.
  • Contact Email/Clarification Portal: Not specified in the provided text.
  • Most Important Attachments:
  • "2026-07-08 Schedule of Mechanical Certs 2999.pdf" (Details all required certifications).
  • "Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx" (Details past experience requirements).
  • "23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf" and "23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf" (Detail specific installation requirements for doors and screens).

Can you bid?

Minimum turnover

€6,000,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

IS291:2015RIAI ACD 02RIAI ACCD 02RIAI ACI 02CIF-01CIF-02

Scoring

Most Economically Advantageous Tender

Documents (238)

PDF

23-16_TD-6101_External Window + Rooflight Schedule.pdf

259.2 KB · Specification

PDF

23-16_TD-6301_Building Signage 01.pdf

858.0 KB · Specification

PDF

23-16_TD-6402_External Ironmongery Schedule.pdf

435.1 KB · Specification

PDF

23-16_TD-6501_Finishes Schedule.pdf

152.2 KB · Specification

PDF

2316-23-16 Architectural Specification 2026-04-28.pdf

679.2 KB · Specification

PDF

Lift Specification_2999.pdf

475.6 KB · Specification

PDF

Vol A.2.3 Elec Spec Part 1 Project Particulars - 2999.pdf

2.3 MB · Specification

PDF

Vol A.2.3 Elec Spec Part 2 - General Responsibilities_2999.pdf

553.2 KB · Specification

PDF

Vol A.2.3 Elec Spec Part 3 - Standard Clauses_2999.pdf

782.5 KB · Specification

PDF

Vol A.2.3 Elec Spec Part 4 - Equipment Schedules_2999.pdf

2.8 MB · Specification

ZIP

Volume A Works Requirements.zip

183.0 MB · Specification

PDF

Volume A.2.3 Mech Spec Part 1 - Project Particulars 2999.pdf

1.0 MB · Specification

PDF

Volume A.2.3 Mech Spec Part 2 - General Responsibilities 2999.pdf

568.4 KB · Specification

PDF

Volume A.2.3 Mech Spec Part 3 - Standard Clauses 2999.pdf

1.6 MB · Specification

PDF

Volume A.2.3 Mech Spec Part 4 - Equipment Schedules 2999.pdf

1.7 MB · Specification

ZIP

Buildsoft E0X Files.zip

965.3 KB · Pricing / BOQ / Schedule of Rates

ZIP

CITE Files.zip

483.0 KB · Pricing / BOQ / Schedule of Rates

ZIP

Excel Files.zip

675.1 KB · Pricing / BOQ / Schedule of Rates

PDF

Volume B FOT & Schedule.pdf

517.8 KB · Pricing / BOQ / Schedule of Rates

PDF

Volume C - Pricing Document.pdf

2.0 MB · Pricing / BOQ / Schedule of Rates

ZIP

Volume C Pricing Document.zip

4.1 MB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.3 KB · Contract / Agreement / Terms

DOCX

Appendix B2 Certificate of Satisfactory Execution – Main Contractors.docx

54.3 KB · Contract / Agreement / Terms

DOC

Appendix L CV Template (Main Contractors).doc

112.5 KB · Contract / Agreement / Terms

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57 .docx

40.7 KB · Form / Declaration / Certificate

DOCX

MF-1.32-Declaration-re-Regulation-57-28-07-2023.docx

32.0 KB · Form / Declaration / Certificate

DOCX

MF-1.33-Declaration-Oath-still-Valid-28-07-2023.docx

25.3 KB · Form / Declaration / Certificate

PDF

2026-07-08 DIFE - Elec Tender Doc Issue Sheet - 2999.pdf

290.5 KB · Drawing / Plan / Layout

PDF

2026-07-08 DIFE - Mech Doc Issue Sheet - 2999.pdf

304.5 KB · Drawing / Plan / Layout

PDF

23-16 - DIFE - Drawing Register 14.07.26.pdf

494.7 KB · Drawing / Plan / Layout

PDF

23-16_TD-1001_PROPOSED GROUND FLOOR PLAN.pdf

484.7 KB · Drawing / Plan / Layout

PDF

23-16_TD-1002_PROPOSED GROUND FLOOR PLAN Part 1.pdf

579.5 KB · Drawing / Plan / Layout

PDF

23-16_TD-1003_PROPOSED GROUND FLOOR PLAN Part 2.pdf

740.5 KB · Drawing / Plan / Layout

PDF

23-16_TD-1004_PROPOSED FIRST FLOOR PLAN.pdf

411.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-1005_PROPOSED FIRST FLOOR PLAN Part 1.pdf

462.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-1006_PROPOSED FIRST FLOOR PLAN Part 2.pdf

469.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-1010_PHASING DRAWING.pdf

405.3 KB · Drawing / Plan / Layout

PDF

23-16_TD-2001_PROPOSED ELEVATIONS.pdf

1.2 MB · Drawing / Plan / Layout

PDF

23-16_TD-4014_RLS 18 - General Store 1.pdf

290.2 KB · Drawing / Plan / Layout

PDF

23-16_TD-4015_RLS 19 - Social Space.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23-16_TD-4016_RLS 20 - Circulation 2.pdf

326.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-4017_RLS 21 - Nursing Practise.pdf

1.8 MB · Drawing / Plan / Layout

PDF

23-16_TD-4018_RLS 22 - Nursing Store.pdf

326.7 KB · Drawing / Plan / Layout

PDF

23-16_TD-4019_RLS 23 - Changes Place Toilet.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23-16_TD-4020_RLS 25 - Staff Office.pdf

314.2 KB · Drawing / Plan / Layout

PDF

23-16_TD-4021_RLS 26 - Servery.pdf

632.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-4022_RLS 27 - Multi Purpose Room.pdf

1.5 MB · Drawing / Plan / Layout

PDF

23-16_TD-4023_RLS 28 - Circulation 3.pdf

319.2 KB · Drawing / Plan / Layout

PDF

23-16_TD-4024_RLS 31 - UA Shower WC 2.pdf

1.1 MB · Drawing / Plan / Layout

PDF

23-16_TD-4025_RLS 32 - Unisex WCS.pdf

775.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-4026_RLS 33 - General Classroom 1.pdf

603.7 KB · Drawing / Plan / Layout

PDF

23-16_TD-4027_RLS 35 - General Classroom 2.pdf

737.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-4028_RLS 37 - Admin Office.pdf

369.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-4029_RLS 38 - Circulation 04.pdf

363.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-4030_RLS 39 - Dental Studies Practise.pdf

1.4 MB · Drawing / Plan / Layout

PDF

23-16_TD-4031_RLS 40-41 - Dental Studies 1 + 2.pdf

280.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-4032_RLS 42 - Pharmacy Tech.pdf

1.3 MB · Drawing / Plan / Layout

PDF

23-16_TD-4501_RLS 12 Computer Room - FF12.1 - TWU.pdf

373.9 KB · Drawing / Plan / Layout

PDF

23-16_TD-4505_RLS 25 Offcie - FF25.1 - Office Storage.pdf

163.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-4506_RLS 26 Servery - Layout.pdf

340.1 KB · Drawing / Plan / Layout

PDF

23-16_TD-4510_RLS 39 DP Studies - FF39.1 - Storage Units.pdf

275.7 KB · Drawing / Plan / Layout

PDF

23-16_TD-4511_RLS 40-41 Dental Studies - Storage.pdf

419.2 KB · Drawing / Plan / Layout

PDF

23-16_TD-4512_RLS 42 Pharmacy Tech - Storage.pdf

239.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-4513_FF - Changing Room Benches.pdf

132.1 KB · Drawing / Plan / Layout

PDF

23-16_TD-5001_GF Floor Finishes.pdf

945.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-5002_FF Floor Finishes.pdf

781.9 KB · Drawing / Plan / Layout

PDF

23-16_TD-5101_GF RCP.pdf

367.1 KB · Drawing / Plan / Layout

PDF

23-16_TD-5102_FF RCP.pdf

671.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-6001_GF + FF - Tags & Blinds.pdf

393.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-7001_Stairs 1.pdf

1.0 MB · Drawing / Plan / Layout

PDF

23-16_TD-7002_Stairs 2.pdf

809.8 KB · Drawing / Plan / Layout

PDF

23-16_TD-7003_Construction Details - Stairs.pdf

340.6 KB · Drawing / Plan / Layout

PDF

23-16_TD-8004_Construction Details 04 - Terrace Details.pdf

360.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-8005_Construction Details 05 - Canopy Details.pdf

464.5 KB · Drawing / Plan / Layout

PDF

23-16_TD-8006_Construction Details 06 - Ext. Opes 01.pdf

468.5 KB · Drawing / Plan / Layout

PDF

23-16_TD-8007_Construction Details 07 - Ext Opes 02.pdf

466.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-8008_Construction Details 08 - Roof Details 01.pdf

486.4 KB · Drawing / Plan / Layout

PDF

23-16_TD-8009_Construction Details 09 - Roof Details 02.pdf

483.0 KB · Drawing / Plan / Layout

PDF

23-16_TD-8010_Construction Details 10 - Roof Details 03.pdf

406.2 KB · Drawing / Plan / Layout

PDF

23-16_TD-8011_Construction Details 11 - Roof Details 04.pdf

423.8 KB · Drawing / Plan / Layout

PDF

23-16_TD-8012_Construction Details 12 - Wall Plan Details.pdf

513.3 KB · Drawing / Plan / Layout

PDF

23-16_TD-8016_Construction Details 16 - Roof Details 05.pdf

291.3 KB · Drawing / Plan / Layout

PDF

230079-X-91-Z00-DTM-DR-DBFL-CE-5301.pdf

764.5 KB · Drawing / Plan / Layout

PDF

230079-X-91-Z00-DTM-DR-DBFL-CE-5302.pdf

356.0 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-F01-DR-SE-7000.pdf

214.6 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-F01-SH-SE-7000.pdf

161.7 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L01-DR-SE-7001.pdf

224.0 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L01-SH-SE-7001.pdf

282.4 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L02-DR-SE-7002.pdf

223.8 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L02-DR-SE-7003.pdf

267.5 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L02-SH-SE-7002.pdf

281.4 KB · Drawing / Plan / Layout

PDF

230079-X-95-X-L02-SH-SE-7003.pdf

281.7 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-F01-DR-DBFL-SE-1000.pdf

200.2 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-L00-DR-DBFL-SE-1002.pdf

254.7 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-L00-DR-DBFL-SE-5000.pdf

217.9 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-L01-DR-DBFL-SE-1003.pdf

369.9 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-L01-DR-DBFL-SE-5020.pdf

220.2 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-RF-DR-DBFL-SE-1004.pdf

266.0 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-RF-DR-DBFL-SE-1005.pdf

496.1 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-RF-DR-DBFL-SE-5021.pdf

138.7 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-XXX-DR-DBFL-SE-1001.pdf

103.2 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-ZZ-DR-DBFL-SE-2000.pdf

463.8 KB · Drawing / Plan / Layout

PDF

230079-X-X-X-ZZ-DR-DBFL-SE-3000.pdf

279.5 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5101.pdf

512.3 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5102.pdf

647.3 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5201.pdf

1.5 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5301.pdf

1.6 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5401.pdf

1.5 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5601.pdf

1.5 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5603.pdf

1.9 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5701.pdf

1.7 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-M-5801.pdf

1.8 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L0-DR-ME-8001.pdf

1.7 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5202.pdf

3.2 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5302.pdf

3.3 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5402.pdf

3.2 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5602.pdf

3.2 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5604.pdf

3.6 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5702.pdf

3.4 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-M-5802.pdf

3.3 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-L1-DR-ME-8002.pdf

3.3 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5150.pdf

548.8 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5151.pdf

559.8 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5350.pdf

748.8 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5351.pdf

745.1 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5450.pdf

396.9 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5451.pdf

407.3 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-LL-DR-M-5850.pdf

983.3 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-RF-DR-M-5203.pdf

314.1 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-RF-DR-M-5303.pdf

365.4 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-RF-DR-M-5403.pdf

367.9 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-RF-DR-ME-8003.pdf

443.7 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-XX-DR-M-5001.pdf

1.4 MB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-XX-DR-M-5103.pdf

611.9 KB · Drawing / Plan / Layout

PDF

2999-SMK-ZZ-XX-DR-ME-5060.pdf

1.3 MB · Drawing / Plan / Layout

PDF

61 POWER DIST - 2999-SMK-ZZ-LL-DR-E-6101.pdf

5.3 MB · Drawing / Plan / Layout

PDF

61 POWER DIST - 2999-SMK-ZZ-XX-DR-E-6100.pdf

668.4 KB · Drawing / Plan / Layout

PDF

62 PV- 2999-SMK-ZZ-LR-DR-E-6200.pdf

510.8 KB · Drawing / Plan / Layout

PDF

62 SMALL POWER & DATA - 2999-SMK-Z1-00-DR-E-6201.pdf

1.9 MB · Drawing / Plan / Layout

PDF

62 SMALL POWER & DATA - 2999-SMK-Z2-01-DR-E-6202.pdf

4.1 MB · Drawing / Plan / Layout

PDF

63 Lighting - 2999-SMK-ZZ-00-DR-E-6301.pdf

1.7 MB · Drawing / Plan / Layout

PDF

63 Lighting - 2999-SMK-ZZ-01-DR-E-6302.pdf

3.4 MB · Drawing / Plan / Layout

PDF

65 PA & SECURITY - 2999-SMK--Z1-00-DR-E-6500.pdf

1.8 MB · Drawing / Plan / Layout

PDF

65 PA & SECURITY - 2999-SMK--Z2-01-DR-E-6501.pdf

4.2 MB · Drawing / Plan / Layout

PDF

67 Fire Alarm-2999-SMK-ZZ-00-DR-E-6701.pdf

1.6 MB · Drawing / Plan / Layout

PDF

67 Fire Alarm-2999-SMK-ZZ-01-DR-E-6702.pdf

3.3 MB · Drawing / Plan / Layout

PDF

69 Lightning Protection - 2999-SMK--ZZ-LR-DR-E-6900.pdf

505.5 KB · Drawing / Plan / Layout

PDF

Existing Site Services-2999-SMK-ZZ-XX-DR-ME-5060.pdf

1.7 MB · Drawing / Plan / Layout

PDF

Fire Schematics-2999-SMK-ZZ-LL-DR-E-6700.pdf

848.4 KB · Drawing / Plan / Layout

PDF

ICT Schematic-2999-SMK-ZZ-XX-SC-E-6400.pdf

875.9 KB · Drawing / Plan / Layout

PDF

IP.04.01 - Topo Survey.pdf

248.9 KB · Drawing / Plan / Layout

PDF

IP.04.02 - Topo Survey.pdf

133.9 KB · Drawing / Plan / Layout

PDF

IP.06 - 01 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 01.pdf

1.4 MB · Drawing / Plan / Layout

PDF

IP.06 - 02 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 02.pdf

1.6 MB · Drawing / Plan / Layout

PDF

IP.06 - 03 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 03.pdf

1.7 MB · Drawing / Plan / Layout

PDF

IP.06 - 04 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 04.pdf

1.6 MB · Drawing / Plan / Layout

PDF

IP.06 - 05 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 05.pdf

1.6 MB · Drawing / Plan / Layout

PDF

IP.06 - 06 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 06.pdf

1.6 MB · Drawing / Plan / Layout

PDF

IP.06 - 07 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 07.pdf

1.5 MB · Drawing / Plan / Layout

PDF

LV Schematic-2999-SMK-ZZ-XX-SC-E-6200.pdf

698.0 KB · Drawing / Plan / Layout

PDF

LV Schematic-2999-SMK-ZZ-XX-SC-E-6201.pdf

884.6 KB · Drawing / Plan / Layout

PDF

PA & Security Schematics-2999-SMK-ZZ-XX-SC-E-6500.pdf

425.6 KB · Drawing / Plan / Layout

PDF

PA & Security Schematics-2999-SMK-ZZ-XX-SC-E-6501.pdf

639.2 KB · Drawing / Plan / Layout

PDF

Site Electrical-2999-SMK-ZZ-XX-DR-E-6001.pdf

1.7 MB · Drawing / Plan / Layout

PDF

Site EV Car Charging-2999-SMK-ZZ-LX-DR-E-6003.pdf

2.5 MB · Drawing / Plan / Layout

PDF

Site Heating Centre-2999-SMK-ZZ-XX-DR-M-5001.pdf

1.8 MB · Drawing / Plan / Layout

PDF

Site Lighting-2999-SMK-ZZ-XX-DR-E-6002.pdf

2.4 MB · Drawing / Plan / Layout

PDF

MGS Volume C Cover Note.pdf

77.9 KB · Other

PDF

2026-07-08 BCAR M&E PIP 2999.pdf

297.1 KB

PDF

2026-07-08 Schedule of Mechanical Certs 2999.pdf

401.6 KB · Appendix / Annex

PDF

23-16 - Sanitaryware Schedule Rev B.pdf

1.4 MB · Appendix / Annex

PDF

23-16 - Volume A-1 - Project Particulars.pdf

583.2 KB

PDF

23-16 TD 0101 Existing Site.pdf

258.9 KB

PDF

23-16 TD 0102 Proposed Site.pdf

2.7 MB

PDF

23-16 TD 0103 Site Details 01.pdf

945.1 KB

PDF

23-16 TD 0104 Site Details 02.pdf

698.4 KB

PDF

23-16_TD-1007_PROPOSED ROOF PLAN.pdf

1.2 MB

PDF

23-16_TD-1008_RADON AND BRANCH DRAINAGE GF.pdf

680.4 KB

PDF

23-16_TD-1009_RADON AND BRANCH DRAINAGE FF.pdf

2.3 MB

PDF

23-16_TD-3001_PROPOSED SECTIONS.pdf

523.9 KB

PDF

23-16_TD-3002_PROPOSED SECTIONS.pdf

406.7 KB

PDF

23-16_TD-3003_PROPOSED SECTIONS.pdf

398.5 KB

PDF

23-16_TD-3004_PROPOSED SECTIONS.pdf

412.8 KB

PDF

23-16_TD-3005_PROPOSED SECTIONS.pdf

406.4 KB

PDF

23-16_TD-4001_RLS 01 - Entrance Lobby.pdf

351.4 KB

PDF

23-16_TD-4002_RLS 02 - Circulation 1.pdf

373.3 KB

PDF

23-16_TD-4003_RLS 03 - Male ChangingShower Room 1.pdf

856.8 KB

PDF

23-16_TD-4004_RLS 04 - UA Accessible Shower.pdf

1.2 MB

PDF

23-16_TD-4005_RLS 05 - Referees Room.pdf

894.0 KB

PDF

23-16_TD-4006_RLS 06 - Plant Room.pdf

558.5 KB

PDF

23-16_TD-4007_RLS 07 - Female ChangingShower Room 1.pdf

1.2 MB

PDF

23-16_TD-4008_RLS 10 - Female ChangingShower Room 2.pdf

693.4 KB

PDF

23-16_TD-4009_RLS 11 - Computer Room.pdf

1.8 MB

PDF

23-16_TD-4010_RLS 13 - Hotdesk Room.pdf

1.0 MB

PDF

23-16_TD-4011_RLS 14 - Comms Room.pdf

315.3 KB

PDF

23-16_TD-4012_RLS 15 - Switch Room.pdf

263.9 KB

PDF

23-16_TD-4013_RLS 17 - General Store 2.pdf

302.4 KB

PDF

23-16_TD-6102_Ext. Doors & CW Schedule Rev A.pdf

456.6 KB · Appendix / Annex

PDF

23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf

351.5 KB · Appendix / Annex

PDF

23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf

139.9 KB · Appendix / Annex

PDF

23-16_TD-6401_Internal Ironmongery Schedule 01.pdf

386.7 KB · Appendix / Annex

PDF

230079-X-X-X-XX-SP-DBFL-SE-0001.pdf

1.4 MB

PDF

230079-X-X-X-XXX-SP-DBFL-CE-0001.pdf

1.3 MB

PDF

230079-X-X-XXX-X-RG-DBFL-CS-0001.pdf

78.9 KB · Appendix / Annex

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.2 KB

PDF

A.2.5 Preliminaries Text Version.pdf

949.1 KB

DOCX

Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix-C-Bankers-Letter.docx

29.9 KB · Appendix / Annex

DOCX

Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx

28.7 KB · Appendix / Annex

ZIP

Electrical.zip

6.9 MB

PDF

Instruction to Tenderers.pdf

625.0 KB

ZIP

Instruction to Tenderers.zip

625.2 KB

PDF

IP.01 - NOTIFICATION OF DECISION TO GRANT.pdf

212.5 KB · Appendix / Annex

PDF

IP.05 - 6169 DIFE Changing Rooms Draft SI Report.pdf

8.5 MB · Appendix / Annex

PDF

IP.11 - 23-060 H&S Plan.pdf

1.3 MB · Appendix / Annex

ZIP

Mechanical.zip

4.9 MB

DOCX

MF-1.11-09-04-2020.docx

46.6 KB

DOCX

MF-1.13-09-04-2020.docx

46.0 KB

DOCX

MF-1.14-09-04-2020.docx

54.9 KB

DOCX

MF-1.29-17-02-2022.docx

26.8 KB

DOCX

MF-1.30-Reliance-Warranty-18-07-2022.docx

54.1 KB

DOCX

MF-1.31-Site-Closure-Costs-Supplement-29-07-2021.docx

39.1 KB

DOCX

MF-1.6-09-04-2020.docx

55.6 KB

DOCX

MF-1.7-Reliance-Guarantee-18-07-2023.docx

59.4 KB

DOCX

MF1.16_Model_Form_21-03-2016.docx

54.1 KB

DOCX

MF_1.10_v1.3_25-11-2025.docx

53.7 KB

DOCX

PW-CF1-A2-09-12-2019.docx

31.9 KB

PDF

PW-CF1_v2.10_16-06-2026.pdf

980.1 KB

DOCX

QW-Part-2-v1.1-18-11-2024.docx

58.6 KB

DOCX

QW2_Part_1_v2.2_25-11-2025.docx

195.1 KB

PDF

QW2_Part_1_v2.2_25-11-2025.pdf

715.8 KB

ZIP

Suitability Assessment Questionnaire.zip

1.3 MB

ZIP

Tender Addendum 01.zip

443.6 KB · Clarification / Addendum

PDF

Volume B FOT & Schedule - REV A.pdf

517.8 KB · Appendix / Annex

ZIP

Volume B Tender and Schedule.zip

518.0 KB

PDF

Volume D Works Proposals (Reponse to Technical Merit Criteria).pdf

78.8 KB · Tender Response Template

ZIP

Volume D Works Proposals.zip

79.1 KB

ZIP

Volume E.zip

25.0 MB

Original notice text

The project involves the Construction of a new two-storey multi-purpose tertiary education building extension to the North-East of the existing Drogheda Institute of Further Education school building, phased construction over two phases including all associated services, drainage, landscaping and siteworks as detailed in Volume A Works Requirements.

AI analysis updated 2 weeks, 4 days ago

Bid ↗
Details

Value

€7.9m

Deadline

31 Aug

View on eTenders ↗

Location

Drogheda, Co. Louth

Procedure

Open

eTenders ID

8642316

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender