Mechanical Services Installations for Multi-Tertiary Education Building
Value
€7.9m
Deadline
31 Aug
31 Aug 2026
Value
€7.9m
Deadline
31 Aug
Tender for mechanical services installations including supply, installation, testing, and commissioning of various systems for a new multi-tertiary education building.
Mechanical services installation tender for Drogheda Institute of Further Education
Bidder profile
Established mechanical services contractors with significant experience in educational or institutional building projects, capable of managing complex installations and extensive certification requirements.
Risks & flags
- Extensive and specific certification requirements
- Detailed product and installation specifications
- High turnover and insurance requirements
- Lack of stated contract value
- Lack of explicit award criteria detail
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Drogheda Institute of Further Education (DIFE) |
|---|---|
| Title | Unknown |
| CPV / category | Not specified |
| Estimated value | Not disclosed |
| Per-year (if multi-year) | Not specified |
| Procedure type | Not specified |
| Lots | Not specified |
| Location | Drogheda, Co. Louth |
| Contract length | Not specified |
| Submission deadline | Not stated |
| Go-live / start | Not stated |
2. Scope of Work
This tender concerns the provision of mechanical services installations for a multi-tertiary education building at DIFE in Drogheda, Co. Louth. The scope encompasses the supply, installation, testing, and commissioning of various mechanical systems, along with the provision of all necessary ancillary certificates and documentation.
The contractor will be responsible for:
- Ancillary Certificates: Providing a comprehensive schedule of ancillary certificates for mechanical services. This includes:
- Ancillary Certificate of Compliance on Completion from the Mechanical Sub-Contractor (CIF-01).
- Ancillary Certificates of Compliance from specialist sub-sub-contractors for:
- Flue Specialist (Design commencement, Design completion, Inspection, and on Completion - RIAI ACD 02, RIAI ACCD 02, RIAI ACI 02, CIF-02).
- Air Source Heat Pump Specialist Installer (on Completion - CIF-02).
- Underfloor Heating Specialist Installer (on Completion - CIF-02).
- Mechanical Heat Recovery Ventilator Specialist (on Completion - CIF-02).
- Ductwork/Ventilation Installer (on Completion - CIF-02).
- Fire / Smoke Damper Installer Specialist (on Completion - CIF-02).
- Fire Fighting Equipment Specialist (on Completion).
- Registered Gas Installer (on Completion - CIF-02).
- BEMS Specialist (on Completion - CIF-02).
- Testing and Commissioning: Executing and documenting all required testing and commissioning for the installed mechanical systems. This includes:
- Air Source Heat Pumps Commissioning Certificates.
- LPHW Heating Boilers commissioning certificate.
- LPHW Heating Pressurisation Unit commissioning certificate.
- LPHW Heating Circulating Pumps commissioning certificate.
- LPHW Heating system pipework pressure test certificate.
- LPHW Heating system hydraulic balancing commissioning certificate.
- LPHW Heating system inhibitor chemical dosing certificate.
- Underfloor Heating Specialists Installation commissioning certificates.
- UFH wiring stations commissioning certificate.
- Domestic Hot Water Generator commissioning certificate.
- Domestic Hot Water Return Pump commissioning certificate.
- Cold Water Booster Set commissioning certificate.
- Plumbing system pipework pressure test certificate (Mains/Cold/Hot Water).
- Plumbing systems sterilisation/chlorination certificates.
- Hot water return system thermal balancing commissioning certificate.
- Thermostatic mixing valves commissioning certificate (Fail safe).
- Gas pipework pressure test certificate.
- Gas Leak Detection commissioning certificate.
- Gas Pressure Proving commissioning certificate.
- Gas Installation Declaration of Conformance Certificate.
- Sign off of gas installation by Registered Gas Installer (RGI).
- Mechanical Heat Recovery Ventilators commissioning certificates.
- General ventilation air balancing commissioning certificates.
- Fire / Smoke Damper commissioning certificates.
- Fire Extinguisher report in accordance with IS291:2015.
- BEMS test and commissioning certificates.
- Mechanical Contractor’s Opinion on Compliance: Providing a letter from the Mechanical Contractor confirming installation in accordance with drawings, specifications, and Building Regulations.
- Operation and Maintenance Manuals: Supplying comprehensive O&M manuals, including as-built drawings and test certificates for the mechanical services installation.
The project involves detailed specifications for various components, including sanitaryware, doors, and screens, indicating a requirement for precise installation and adherence to standards.
3. Background & buyer context
This procurement is for the Drogheda Institute of Further Education (DIFE), a facility operated by Louth & Meath Education & Training Board. The project involves the extension and fit-out of the existing DIFE campus to provide multi-tertiary education facilities. The tender documents, including door and sanitaryware schedules, indicate a focus on modern educational and practical training spaces, such as changing rooms, showers, WCs, offices, classrooms, and specialised practice areas like nursing and dental studies. The project requires adherence to current Building Regulations, Irish Standards (IS), British Standards (BS), and relevant Technical Guidance Documents (TGDs), including those related to fire safety and disability access. The documentation suggests a project timeline culminating in 2026, with specific dates for product certification and certificate issuance.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement:
- Average annual turnover of €6,000,000 in General Construction over the last three years.
- Evidence of existence for a minimum of 3 years with effective turnover over the last 3 years not less than the required amount.
- Insurance:
- Public Liability Insurance: Minimum €6,500,000 per accident.
- Employer’s Liability Insurance: Minimum €13,000,000 per accident.
- Professional Indemnity Insurance: Minimum €1,500,000 in the annual aggregate limit.
- Sub-contractor Professional Indemnity Insurance: Minimum €6,500,000.
- Certifications:
- Not specified for this tender.
- Past experience:
- A list of at least 20 completed projects similar in nature and complexity to the works required, organised in order of precedence.
- Personnel:
- Contracts Manager: Minimum 10 years' experience in the Building Trade, including at least 5 years in a management role, or equivalent qualifications/training.
- Health and Safety Manager: Minimum 5 years' experience in the Building Trade, with a Degree/diploma or equivalent H&S training, or at least 3 years acting as H&S Manager on building projects.
- Foreman: Minimum 7 years' experience in the Building Trade, including at least 3 years as a Foreman.
- Site Safety Officer: Minimum 5 years' experience in the Building Trade and formal H&S training (minimum 4 hours externally accredited CPD).
- Sufficient staff to carry out the project, considering turnover and workload.
- Geographic / facility constraints:
- Not specified for this tender.
5. Award criteria & scoring
The award criteria are not explicitly detailed with scoring percentages in the provided extract. However, the tender process will likely follow a standard public procurement model, typically involving a Most Economically Advantageous Tender (MEAT) approach, balancing price and quality. The selection criteria, particularly regarding experience and insurance, suggest that quality and demonstrated capability will be significant factors. Bidders must meet all mandatory requirements to be considered for evaluation.
6. Submission requirements
Bidders are required to submit the following:
- List of Previous Works Projects: A completed Appendix B1 detailing at least 20 previous projects similar in nature and complexity, organised in order of precedence and matching certificate details.
- Banker's Letter: A letter from the applicant's principal banker confirming banking history and facilities, as per Appendix C.
- Ancillary Certificates: A comprehensive schedule of ancillary and commissioning certificates for mechanical services, as detailed in the "Schedule of Mechanical Certs 2999.pdf".
- Declarations:
- Bona Fides declarations.
- Tax clearance certificates.
- Evidence of sub-contractor's Professional Indemnity Insurance (€6.5 million minimum).
- Pricing Schedule: Not explicitly detailed in the provided text, but a standard requirement.
- Method Statement / Response Document: Not explicitly detailed in the provided text.
- CVs: Not explicitly detailed in the provided text.
- Case Studies: Not explicitly detailed in the provided text.
- Mandatory Site Visit: Not specified in the provided text.
- Submission Portal: Bids are to be submitted via eTenders.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | Not stated |
| Clarification deadline | Not stated |
| Tender deadline | Not stated |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
- Contract Length & Extensions: Not specified in the provided text.
- Payment Terms: Not specified in the provided text.
- SLAs/KPIs: Not specified in the provided text.
- Liquidated Damages: Not specified in the provided text.
- Termination Clauses: Not specified in the provided text.
- IP Ownership: Not specified in the provided text.
- Sub-contracting Rules: Sub-contractors must hold minimum €6.5 million Professional Indemnity Insurance.
- Parent Company Guarantee/Bond: Not specified in the provided text.
9. Risks, red flags & unusuals
- Extensive Certification Requirements: The sheer volume and specificity of required ancillary and commissioning certificates for mechanical services present a significant administrative and compliance burden. Failure to provide any of these could lead to disqualification.
- Detailed Product Specifications: The detailed schedules for sanitaryware, doors, and screens indicate a high level of specification. Bidders must ensure their proposed materials and installations precisely match these requirements, leaving little room for deviation.
- Implicit Quality Focus: While not explicitly detailed, the stringent experience and insurance requirements, combined with the detailed certification schedule, suggest a strong emphasis on quality and proven capability over price alone.
- Lack of Tender Value: The absence of an estimated contract value makes it difficult for bidders to gauge the scale of the project and assess the proportionality of the requirements.
10. SME fit assessment
This tender is likely best suited for established mechanical services contractors with a proven track record in educational or institutional building projects. The requirement for a minimum of 20 previous similar projects, coupled with the significant turnover and insurance requirements, suggests that very small or newly formed businesses may find it challenging to meet the eligibility criteria.
- Credible Bidders: Firms with substantial experience in managing complex mechanical installations, particularly in public sector or educational environments, and who can demonstrate robust H&S management systems and a strong supply chain for specialist sub-contractors, are well-positioned.
- Consortium/Sub-contracting: While sub-contracting is permitted for specific elements (e.g., flue specialists, heat pumps), the primary bidder must meet the main turnover and experience criteria. Consortium bids are not explicitly mentioned but would likely need to demonstrate how the combined entity meets all requirements.
- Indicative Bid-Prep Effort: Preparing a compliant bid, particularly gathering all necessary certification evidence and detailing the experience of key personnel, would require significant effort, likely several weeks of dedicated work for a small team.
- Pwin Signal: The extensive documentation and detailed requirements suggest a well-defined project. The lack of a stated value and the absence of a clear award matrix make it difficult to assess the Pwin. However, the emphasis on certification and experience points towards a preference for established, compliant providers.
11. Where to dig deeper
- Source RFT Filename(s): "2026-07-08 Schedule of Mechanical Certs 2999.pdf", "Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx", "23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf", "23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf", "Appendix-C-Bankers-Letter.docx", "23-16 - Sanitaryware Schedule Rev B.pdf".
- eTenders CFT ID: Not specified in the provided text.
- Contact Email/Clarification Portal: Not specified in the provided text.
- Most Important Attachments:
- "2026-07-08 Schedule of Mechanical Certs 2999.pdf" (Details all required certifications).
- "Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx" (Details past experience requirements).
- "23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf" and "23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf" (Detail specific installation requirements for doors and screens).
Can you bid?
Minimum turnover
€6,000,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (238)
23-16_TD-6101_External Window + Rooflight Schedule.pdf
259.2 KB · Specification
23-16_TD-6301_Building Signage 01.pdf
858.0 KB · Specification
23-16_TD-6402_External Ironmongery Schedule.pdf
435.1 KB · Specification
23-16_TD-6501_Finishes Schedule.pdf
152.2 KB · Specification
2316-23-16 Architectural Specification 2026-04-28.pdf
679.2 KB · Specification
Lift Specification_2999.pdf
475.6 KB · Specification
Vol A.2.3 Elec Spec Part 1 Project Particulars - 2999.pdf
2.3 MB · Specification
Vol A.2.3 Elec Spec Part 2 - General Responsibilities_2999.pdf
553.2 KB · Specification
Vol A.2.3 Elec Spec Part 3 - Standard Clauses_2999.pdf
782.5 KB · Specification
Vol A.2.3 Elec Spec Part 4 - Equipment Schedules_2999.pdf
2.8 MB · Specification
Volume A Works Requirements.zip
183.0 MB · Specification
Volume A.2.3 Mech Spec Part 1 - Project Particulars 2999.pdf
1.0 MB · Specification
Volume A.2.3 Mech Spec Part 2 - General Responsibilities 2999.pdf
568.4 KB · Specification
Volume A.2.3 Mech Spec Part 3 - Standard Clauses 2999.pdf
1.6 MB · Specification
Volume A.2.3 Mech Spec Part 4 - Equipment Schedules 2999.pdf
1.7 MB · Specification
Buildsoft E0X Files.zip
965.3 KB · Pricing / BOQ / Schedule of Rates
CITE Files.zip
483.0 KB · Pricing / BOQ / Schedule of Rates
Excel Files.zip
675.1 KB · Pricing / BOQ / Schedule of Rates
Volume B FOT & Schedule.pdf
517.8 KB · Pricing / BOQ / Schedule of Rates
Volume C - Pricing Document.pdf
2.0 MB · Pricing / BOQ / Schedule of Rates
Volume C Pricing Document.zip
4.1 MB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.3 KB · Contract / Agreement / Terms
Appendix B2 Certificate of Satisfactory Execution – Main Contractors.docx
54.3 KB · Contract / Agreement / Terms
Appendix L CV Template (Main Contractors).doc
112.5 KB · Contract / Agreement / Terms
Appendix_A_Applicants_Self-Declaration__Regulation_57 .docx
40.7 KB · Form / Declaration / Certificate
MF-1.32-Declaration-re-Regulation-57-28-07-2023.docx
32.0 KB · Form / Declaration / Certificate
MF-1.33-Declaration-Oath-still-Valid-28-07-2023.docx
25.3 KB · Form / Declaration / Certificate
2026-07-08 DIFE - Elec Tender Doc Issue Sheet - 2999.pdf
290.5 KB · Drawing / Plan / Layout
2026-07-08 DIFE - Mech Doc Issue Sheet - 2999.pdf
304.5 KB · Drawing / Plan / Layout
23-16 - DIFE - Drawing Register 14.07.26.pdf
494.7 KB · Drawing / Plan / Layout
23-16_TD-1001_PROPOSED GROUND FLOOR PLAN.pdf
484.7 KB · Drawing / Plan / Layout
23-16_TD-1002_PROPOSED GROUND FLOOR PLAN Part 1.pdf
579.5 KB · Drawing / Plan / Layout
23-16_TD-1003_PROPOSED GROUND FLOOR PLAN Part 2.pdf
740.5 KB · Drawing / Plan / Layout
23-16_TD-1004_PROPOSED FIRST FLOOR PLAN.pdf
411.6 KB · Drawing / Plan / Layout
23-16_TD-1005_PROPOSED FIRST FLOOR PLAN Part 1.pdf
462.6 KB · Drawing / Plan / Layout
23-16_TD-1006_PROPOSED FIRST FLOOR PLAN Part 2.pdf
469.4 KB · Drawing / Plan / Layout
23-16_TD-1010_PHASING DRAWING.pdf
405.3 KB · Drawing / Plan / Layout
23-16_TD-2001_PROPOSED ELEVATIONS.pdf
1.2 MB · Drawing / Plan / Layout
23-16_TD-4014_RLS 18 - General Store 1.pdf
290.2 KB · Drawing / Plan / Layout
23-16_TD-4015_RLS 19 - Social Space.pdf
1.1 MB · Drawing / Plan / Layout
23-16_TD-4016_RLS 20 - Circulation 2.pdf
326.4 KB · Drawing / Plan / Layout
23-16_TD-4017_RLS 21 - Nursing Practise.pdf
1.8 MB · Drawing / Plan / Layout
23-16_TD-4018_RLS 22 - Nursing Store.pdf
326.7 KB · Drawing / Plan / Layout
23-16_TD-4019_RLS 23 - Changes Place Toilet.pdf
1.1 MB · Drawing / Plan / Layout
23-16_TD-4020_RLS 25 - Staff Office.pdf
314.2 KB · Drawing / Plan / Layout
23-16_TD-4021_RLS 26 - Servery.pdf
632.4 KB · Drawing / Plan / Layout
23-16_TD-4022_RLS 27 - Multi Purpose Room.pdf
1.5 MB · Drawing / Plan / Layout
23-16_TD-4023_RLS 28 - Circulation 3.pdf
319.2 KB · Drawing / Plan / Layout
23-16_TD-4024_RLS 31 - UA Shower WC 2.pdf
1.1 MB · Drawing / Plan / Layout
23-16_TD-4025_RLS 32 - Unisex WCS.pdf
775.4 KB · Drawing / Plan / Layout
23-16_TD-4026_RLS 33 - General Classroom 1.pdf
603.7 KB · Drawing / Plan / Layout
23-16_TD-4027_RLS 35 - General Classroom 2.pdf
737.0 KB · Drawing / Plan / Layout
23-16_TD-4028_RLS 37 - Admin Office.pdf
369.6 KB · Drawing / Plan / Layout
23-16_TD-4029_RLS 38 - Circulation 04.pdf
363.0 KB · Drawing / Plan / Layout
23-16_TD-4030_RLS 39 - Dental Studies Practise.pdf
1.4 MB · Drawing / Plan / Layout
23-16_TD-4031_RLS 40-41 - Dental Studies 1 + 2.pdf
280.4 KB · Drawing / Plan / Layout
23-16_TD-4032_RLS 42 - Pharmacy Tech.pdf
1.3 MB · Drawing / Plan / Layout
23-16_TD-4501_RLS 12 Computer Room - FF12.1 - TWU.pdf
373.9 KB · Drawing / Plan / Layout
23-16_TD-4505_RLS 25 Offcie - FF25.1 - Office Storage.pdf
163.4 KB · Drawing / Plan / Layout
23-16_TD-4506_RLS 26 Servery - Layout.pdf
340.1 KB · Drawing / Plan / Layout
23-16_TD-4510_RLS 39 DP Studies - FF39.1 - Storage Units.pdf
275.7 KB · Drawing / Plan / Layout
23-16_TD-4511_RLS 40-41 Dental Studies - Storage.pdf
419.2 KB · Drawing / Plan / Layout
23-16_TD-4512_RLS 42 Pharmacy Tech - Storage.pdf
239.0 KB · Drawing / Plan / Layout
23-16_TD-4513_FF - Changing Room Benches.pdf
132.1 KB · Drawing / Plan / Layout
23-16_TD-5001_GF Floor Finishes.pdf
945.0 KB · Drawing / Plan / Layout
23-16_TD-5002_FF Floor Finishes.pdf
781.9 KB · Drawing / Plan / Layout
23-16_TD-5101_GF RCP.pdf
367.1 KB · Drawing / Plan / Layout
23-16_TD-5102_FF RCP.pdf
671.6 KB · Drawing / Plan / Layout
23-16_TD-6001_GF + FF - Tags & Blinds.pdf
393.6 KB · Drawing / Plan / Layout
23-16_TD-7001_Stairs 1.pdf
1.0 MB · Drawing / Plan / Layout
23-16_TD-7002_Stairs 2.pdf
809.8 KB · Drawing / Plan / Layout
23-16_TD-7003_Construction Details - Stairs.pdf
340.6 KB · Drawing / Plan / Layout
23-16_TD-8004_Construction Details 04 - Terrace Details.pdf
360.0 KB · Drawing / Plan / Layout
23-16_TD-8005_Construction Details 05 - Canopy Details.pdf
464.5 KB · Drawing / Plan / Layout
23-16_TD-8006_Construction Details 06 - Ext. Opes 01.pdf
468.5 KB · Drawing / Plan / Layout
23-16_TD-8007_Construction Details 07 - Ext Opes 02.pdf
466.0 KB · Drawing / Plan / Layout
23-16_TD-8008_Construction Details 08 - Roof Details 01.pdf
486.4 KB · Drawing / Plan / Layout
23-16_TD-8009_Construction Details 09 - Roof Details 02.pdf
483.0 KB · Drawing / Plan / Layout
23-16_TD-8010_Construction Details 10 - Roof Details 03.pdf
406.2 KB · Drawing / Plan / Layout
23-16_TD-8011_Construction Details 11 - Roof Details 04.pdf
423.8 KB · Drawing / Plan / Layout
23-16_TD-8012_Construction Details 12 - Wall Plan Details.pdf
513.3 KB · Drawing / Plan / Layout
23-16_TD-8016_Construction Details 16 - Roof Details 05.pdf
291.3 KB · Drawing / Plan / Layout
230079-X-91-Z00-DTM-DR-DBFL-CE-5301.pdf
764.5 KB · Drawing / Plan / Layout
230079-X-91-Z00-DTM-DR-DBFL-CE-5302.pdf
356.0 KB · Drawing / Plan / Layout
230079-X-95-X-F01-DR-SE-7000.pdf
214.6 KB · Drawing / Plan / Layout
230079-X-95-X-F01-SH-SE-7000.pdf
161.7 KB · Drawing / Plan / Layout
230079-X-95-X-L01-DR-SE-7001.pdf
224.0 KB · Drawing / Plan / Layout
230079-X-95-X-L01-SH-SE-7001.pdf
282.4 KB · Drawing / Plan / Layout
230079-X-95-X-L02-DR-SE-7002.pdf
223.8 KB · Drawing / Plan / Layout
230079-X-95-X-L02-DR-SE-7003.pdf
267.5 KB · Drawing / Plan / Layout
230079-X-95-X-L02-SH-SE-7002.pdf
281.4 KB · Drawing / Plan / Layout
230079-X-95-X-L02-SH-SE-7003.pdf
281.7 KB · Drawing / Plan / Layout
230079-X-X-X-F01-DR-DBFL-SE-1000.pdf
200.2 KB · Drawing / Plan / Layout
230079-X-X-X-L00-DR-DBFL-SE-1002.pdf
254.7 KB · Drawing / Plan / Layout
230079-X-X-X-L00-DR-DBFL-SE-5000.pdf
217.9 KB · Drawing / Plan / Layout
230079-X-X-X-L01-DR-DBFL-SE-1003.pdf
369.9 KB · Drawing / Plan / Layout
230079-X-X-X-L01-DR-DBFL-SE-5020.pdf
220.2 KB · Drawing / Plan / Layout
230079-X-X-X-RF-DR-DBFL-SE-1004.pdf
266.0 KB · Drawing / Plan / Layout
230079-X-X-X-RF-DR-DBFL-SE-1005.pdf
496.1 KB · Drawing / Plan / Layout
230079-X-X-X-RF-DR-DBFL-SE-5021.pdf
138.7 KB · Drawing / Plan / Layout
230079-X-X-X-XXX-DR-DBFL-SE-1001.pdf
103.2 KB · Drawing / Plan / Layout
230079-X-X-X-ZZ-DR-DBFL-SE-2000.pdf
463.8 KB · Drawing / Plan / Layout
230079-X-X-X-ZZ-DR-DBFL-SE-3000.pdf
279.5 KB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5101.pdf
512.3 KB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5102.pdf
647.3 KB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5201.pdf
1.5 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5301.pdf
1.6 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5401.pdf
1.5 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5601.pdf
1.5 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5603.pdf
1.9 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5701.pdf
1.7 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-M-5801.pdf
1.8 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L0-DR-ME-8001.pdf
1.7 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5202.pdf
3.2 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5302.pdf
3.3 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5402.pdf
3.2 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5602.pdf
3.2 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5604.pdf
3.6 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5702.pdf
3.4 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-M-5802.pdf
3.3 MB · Drawing / Plan / Layout
2999-SMK-ZZ-L1-DR-ME-8002.pdf
3.3 MB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5150.pdf
548.8 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5151.pdf
559.8 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5350.pdf
748.8 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5351.pdf
745.1 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5450.pdf
396.9 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5451.pdf
407.3 KB · Drawing / Plan / Layout
2999-SMK-ZZ-LL-DR-M-5850.pdf
983.3 KB · Drawing / Plan / Layout
2999-SMK-ZZ-RF-DR-M-5203.pdf
314.1 KB · Drawing / Plan / Layout
2999-SMK-ZZ-RF-DR-M-5303.pdf
365.4 KB · Drawing / Plan / Layout
2999-SMK-ZZ-RF-DR-M-5403.pdf
367.9 KB · Drawing / Plan / Layout
2999-SMK-ZZ-RF-DR-ME-8003.pdf
443.7 KB · Drawing / Plan / Layout
2999-SMK-ZZ-XX-DR-M-5001.pdf
1.4 MB · Drawing / Plan / Layout
2999-SMK-ZZ-XX-DR-M-5103.pdf
611.9 KB · Drawing / Plan / Layout
2999-SMK-ZZ-XX-DR-ME-5060.pdf
1.3 MB · Drawing / Plan / Layout
61 POWER DIST - 2999-SMK-ZZ-LL-DR-E-6101.pdf
5.3 MB · Drawing / Plan / Layout
61 POWER DIST - 2999-SMK-ZZ-XX-DR-E-6100.pdf
668.4 KB · Drawing / Plan / Layout
62 PV- 2999-SMK-ZZ-LR-DR-E-6200.pdf
510.8 KB · Drawing / Plan / Layout
62 SMALL POWER & DATA - 2999-SMK-Z1-00-DR-E-6201.pdf
1.9 MB · Drawing / Plan / Layout
62 SMALL POWER & DATA - 2999-SMK-Z2-01-DR-E-6202.pdf
4.1 MB · Drawing / Plan / Layout
63 Lighting - 2999-SMK-ZZ-00-DR-E-6301.pdf
1.7 MB · Drawing / Plan / Layout
63 Lighting - 2999-SMK-ZZ-01-DR-E-6302.pdf
3.4 MB · Drawing / Plan / Layout
65 PA & SECURITY - 2999-SMK--Z1-00-DR-E-6500.pdf
1.8 MB · Drawing / Plan / Layout
65 PA & SECURITY - 2999-SMK--Z2-01-DR-E-6501.pdf
4.2 MB · Drawing / Plan / Layout
67 Fire Alarm-2999-SMK-ZZ-00-DR-E-6701.pdf
1.6 MB · Drawing / Plan / Layout
67 Fire Alarm-2999-SMK-ZZ-01-DR-E-6702.pdf
3.3 MB · Drawing / Plan / Layout
69 Lightning Protection - 2999-SMK--ZZ-LR-DR-E-6900.pdf
505.5 KB · Drawing / Plan / Layout
Existing Site Services-2999-SMK-ZZ-XX-DR-ME-5060.pdf
1.7 MB · Drawing / Plan / Layout
Fire Schematics-2999-SMK-ZZ-LL-DR-E-6700.pdf
848.4 KB · Drawing / Plan / Layout
ICT Schematic-2999-SMK-ZZ-XX-SC-E-6400.pdf
875.9 KB · Drawing / Plan / Layout
IP.04.01 - Topo Survey.pdf
248.9 KB · Drawing / Plan / Layout
IP.04.02 - Topo Survey.pdf
133.9 KB · Drawing / Plan / Layout
IP.06 - 01 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 01.pdf
1.4 MB · Drawing / Plan / Layout
IP.06 - 02 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 02.pdf
1.6 MB · Drawing / Plan / Layout
IP.06 - 03 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 03.pdf
1.7 MB · Drawing / Plan / Layout
IP.06 - 04 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 04.pdf
1.6 MB · Drawing / Plan / Layout
IP.06 - 05 -1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 05.pdf
1.6 MB · Drawing / Plan / Layout
IP.06 - 06 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 06.pdf
1.6 MB · Drawing / Plan / Layout
IP.06 - 07 - 1352D-23-003 - DBFL DIFE Changing Rooms, Drogheda - GPR - R03 - Sheet 07.pdf
1.5 MB · Drawing / Plan / Layout
LV Schematic-2999-SMK-ZZ-XX-SC-E-6200.pdf
698.0 KB · Drawing / Plan / Layout
LV Schematic-2999-SMK-ZZ-XX-SC-E-6201.pdf
884.6 KB · Drawing / Plan / Layout
PA & Security Schematics-2999-SMK-ZZ-XX-SC-E-6500.pdf
425.6 KB · Drawing / Plan / Layout
PA & Security Schematics-2999-SMK-ZZ-XX-SC-E-6501.pdf
639.2 KB · Drawing / Plan / Layout
Site Electrical-2999-SMK-ZZ-XX-DR-E-6001.pdf
1.7 MB · Drawing / Plan / Layout
Site EV Car Charging-2999-SMK-ZZ-LX-DR-E-6003.pdf
2.5 MB · Drawing / Plan / Layout
Site Heating Centre-2999-SMK-ZZ-XX-DR-M-5001.pdf
1.8 MB · Drawing / Plan / Layout
Site Lighting-2999-SMK-ZZ-XX-DR-E-6002.pdf
2.4 MB · Drawing / Plan / Layout
MGS Volume C Cover Note.pdf
77.9 KB · Other
2026-07-08 BCAR M&E PIP 2999.pdf
297.1 KB
2026-07-08 Schedule of Mechanical Certs 2999.pdf
401.6 KB · Appendix / Annex
23-16 - Sanitaryware Schedule Rev B.pdf
1.4 MB · Appendix / Annex
23-16 - Volume A-1 - Project Particulars.pdf
583.2 KB
23-16 TD 0101 Existing Site.pdf
258.9 KB
23-16 TD 0102 Proposed Site.pdf
2.7 MB
23-16 TD 0103 Site Details 01.pdf
945.1 KB
23-16 TD 0104 Site Details 02.pdf
698.4 KB
23-16_TD-1007_PROPOSED ROOF PLAN.pdf
1.2 MB
23-16_TD-1008_RADON AND BRANCH DRAINAGE GF.pdf
680.4 KB
23-16_TD-1009_RADON AND BRANCH DRAINAGE FF.pdf
2.3 MB
23-16_TD-3001_PROPOSED SECTIONS.pdf
523.9 KB
23-16_TD-3002_PROPOSED SECTIONS.pdf
406.7 KB
23-16_TD-3003_PROPOSED SECTIONS.pdf
398.5 KB
23-16_TD-3004_PROPOSED SECTIONS.pdf
412.8 KB
23-16_TD-3005_PROPOSED SECTIONS.pdf
406.4 KB
23-16_TD-4001_RLS 01 - Entrance Lobby.pdf
351.4 KB
23-16_TD-4002_RLS 02 - Circulation 1.pdf
373.3 KB
23-16_TD-4003_RLS 03 - Male ChangingShower Room 1.pdf
856.8 KB
23-16_TD-4004_RLS 04 - UA Accessible Shower.pdf
1.2 MB
23-16_TD-4005_RLS 05 - Referees Room.pdf
894.0 KB
23-16_TD-4006_RLS 06 - Plant Room.pdf
558.5 KB
23-16_TD-4007_RLS 07 - Female ChangingShower Room 1.pdf
1.2 MB
23-16_TD-4008_RLS 10 - Female ChangingShower Room 2.pdf
693.4 KB
23-16_TD-4009_RLS 11 - Computer Room.pdf
1.8 MB
23-16_TD-4010_RLS 13 - Hotdesk Room.pdf
1.0 MB
23-16_TD-4011_RLS 14 - Comms Room.pdf
315.3 KB
23-16_TD-4012_RLS 15 - Switch Room.pdf
263.9 KB
23-16_TD-4013_RLS 17 - General Store 2.pdf
302.4 KB
23-16_TD-6102_Ext. Doors & CW Schedule Rev A.pdf
456.6 KB · Appendix / Annex
23-16_TD-6201_Int Door & Screen Schedule 1 of 2.pdf
351.5 KB · Appendix / Annex
23-16_TD-6202_Int Door & Screen Schedule 2 of 2.pdf
139.9 KB · Appendix / Annex
23-16_TD-6401_Internal Ironmongery Schedule 01.pdf
386.7 KB · Appendix / Annex
230079-X-X-X-XX-SP-DBFL-SE-0001.pdf
1.4 MB
230079-X-X-X-XXX-SP-DBFL-CE-0001.pdf
1.3 MB
230079-X-X-XXX-X-RG-DBFL-CS-0001.pdf
78.9 KB · Appendix / Annex
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.2 KB
A.2.5 Preliminaries Text Version.pdf
949.1 KB
Appendix-B1-List-of-Previous-Works-Projects-which-is-CEE.docx
31.3 KB · Appendix / Annex
Appendix-C-Bankers-Letter.docx
29.9 KB · Appendix / Annex
Appendix-D2-QW2-Letter-of-Undertaking-re.-Bond.docx
28.7 KB · Appendix / Annex
Electrical.zip
6.9 MB
Instruction to Tenderers.pdf
625.0 KB
Instruction to Tenderers.zip
625.2 KB
IP.01 - NOTIFICATION OF DECISION TO GRANT.pdf
212.5 KB · Appendix / Annex
IP.05 - 6169 DIFE Changing Rooms Draft SI Report.pdf
8.5 MB · Appendix / Annex
IP.11 - 23-060 H&S Plan.pdf
1.3 MB · Appendix / Annex
Mechanical.zip
4.9 MB
MF-1.11-09-04-2020.docx
46.6 KB
MF-1.13-09-04-2020.docx
46.0 KB
MF-1.14-09-04-2020.docx
54.9 KB
MF-1.29-17-02-2022.docx
26.8 KB
MF-1.30-Reliance-Warranty-18-07-2022.docx
54.1 KB
MF-1.31-Site-Closure-Costs-Supplement-29-07-2021.docx
39.1 KB
MF-1.6-09-04-2020.docx
55.6 KB
MF-1.7-Reliance-Guarantee-18-07-2023.docx
59.4 KB
MF1.16_Model_Form_21-03-2016.docx
54.1 KB
MF_1.10_v1.3_25-11-2025.docx
53.7 KB
PW-CF1-A2-09-12-2019.docx
31.9 KB
PW-CF1_v2.10_16-06-2026.pdf
980.1 KB
QW-Part-2-v1.1-18-11-2024.docx
58.6 KB
QW2_Part_1_v2.2_25-11-2025.docx
195.1 KB
QW2_Part_1_v2.2_25-11-2025.pdf
715.8 KB
Suitability Assessment Questionnaire.zip
1.3 MB
Tender Addendum 01.zip
443.6 KB · Clarification / Addendum
Volume B FOT & Schedule - REV A.pdf
517.8 KB · Appendix / Annex
Volume B Tender and Schedule.zip
518.0 KB
Volume D Works Proposals (Reponse to Technical Merit Criteria).pdf
78.8 KB · Tender Response Template
Volume D Works Proposals.zip
79.1 KB
Volume E.zip
25.0 MB
Original notice text
The project involves the Construction of a new two-storey multi-purpose tertiary education building extension to the North-East of the existing Drogheda Institute of Further Education school building, phased construction over two phases including all associated services, drainage, landscaping and siteworks as detailed in Volume A Works Requirements.
AI analysis updated 2 weeks, 4 days ago
Value
€7.9m
Deadline
31 Aug
Location
Drogheda, Co. Louth
Procedure
Open
eTenders ID
8642316
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender