Construction project to upgrade water services within Finner Camp Dining Hall, Co. Donegal.
Water services upgrade at Finner Camp Dining Hall for Department of Defence
Bidder profile
SMEs with proven experience in water services upgrades and construction, capable of meeting substantial insurance and turnover requirements.
Risks & flags
- Tight 112-day completion time
- Potential security/access restrictions in military camp
- Contractors All Risk Insurance calculation complexity
- PW-CF6 contract specificities
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Department of Defence |
|---|---|
| Title | Upgrade of Finner Camp Dining Hall to include Water Services Upgrade |
| CPV / category | Not specified |
| Estimated value | Not disclosed |
| Per-year | Not stated |
| Procedure type | Not stated |
| Lots | Not stated |
| Location | Finner Camp, Ballyshannon, Co. Donegal |
| Contract length | Not stated |
| Submission deadline | 2026-10-22T11:00:00+00:00 |
| Go-live / start | Not stated |
2. Scope of Work
The contract involves the upgrade of water services within the Finner Camp Dining Hall. This is a construction project requiring the contractor to undertake works to improve the existing water infrastructure. The scope encompasses the physical execution of the upgrade, ensuring compliance with all relevant regulations and standards.
Key activities and requirements include:
- Water Services Upgrade: This is the primary objective, focusing on the enhancement and modernisation of the water supply and distribution systems within the dining hall. Specific details of the required upgrades are not detailed in the provided metadata but will be elaborated in the full tender documents.
- Construction Works: The contractor will be responsible for all aspects of the construction, including any necessary demolition, installation, and finishing works associated with the water services upgrade.
- Site Management: The contractor must manage the worksite at Finner Camp, ensuring safety, security, and order. This includes keeping the site free from unnecessary obstructions and securing it against unauthorised access.
- Health and Safety: The contractor must ensure the safety of all personnel on site and protect the public and nearby areas from hazards arising from the works. This includes compliance with the role of Project Supervisor for the Construction Stage (PSCS) if required by the Building Control Regulations.
- Materials and Goods: The contractor must use goods and materials of good quality and ensure their suitability for the intended purpose. Certification for compliance with the Building Control Regulations will be required.
- Compliance: All works must be carried out in accordance with the contract, the Employer’s Representative’s written instructions, and applicable law. This includes adherence to the Short Public Works Contract conditions.
- Access and Services: The contractor is responsible for the suitability and availability of access routes to and through the site, and for obtaining all required facilities, power, water, and other services, unless the Employer is specified to provide them.
- Reporting and Certification: The contractor must provide necessary information and certifications to the Employer’s Representative and Assigned Certifier, including timely notification before works are covered and opportunities for inspection.
The contract is based on the PW-CF6 Short Public Works Contract conditions.
3. Background & buyer context
This procurement is being undertaken by the Department of Defence. The project, the "Upgrade of Finner Camp Dining Hall to include Water Services Upgrade," is a capital works project. While specific policy drivers are not detailed, such upgrades are typically undertaken to maintain and improve military infrastructure, ensuring operational readiness and the welfare of personnel. Finner Camp is a military installation, and the dining hall is a critical facility. The procurement follows standard public sector tendering procedures for works contracts.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover requirement:
- Average annual turnover of €1.5 million arising from construction work.
- Insurance:
- Public Liability Insurance: Minimum €6,500,000 per accident. Maximum excess of €10,000 for property damage only. No excess permitted for death, injury, or illness.
- Employer’s Liability Insurance: Minimum €13,000,000 per accident. No permitted excess.
- Professional Indemnity Insurance: Minimum cover level to be confirmed, but the maximum permissible excess is the greater of 2% of annual turnover or €5,000. Cover is on an annual aggregate basis.
- Contractors All Risk Insurance: Minimum cover not less than the Contract Sum plus a minimum of 30%.
- Certifications:
- Safety Management System: Must be in accordance with ISO 45001:2018 or equivalent.
- Past experience:
- Must have satisfactorily completed a minimum of 3 individual separate projects similar in nature and complexity to the works required.
- These projects must have been completed within the period stated in the qualification criteria (period not specified in metadata).
- Projects costing in excess of €250,000 each are referenced in relation to experience, and projects in excess of €500,000 completed in a live campus or secure environment are also mentioned.
- Personnel:
- Contracts Manager: If no formal qualifications, must have at least 10 years’ experience in the Building Trade, including at least 5 years in a management role.
- Foreman (Site Manager): If no formal qualifications, must have at least 10 years’ experience in the Building Trade, including at least 5 years as a Foreman.
- Health and Safety Manager/Site Safety Officer: Must have a Degree/diploma or equivalent H&S training, or at least 3 years acting in the capacity of Health and Safety Manager/Site Safety Officer on building construction projects.
- Geographic / facility constraints: Not specified for this tender.
5. Award criteria & scoring
The award criteria are not detailed in the provided metadata. Typically, public works contracts in Ireland are awarded based on the Most Economically Advantageous Tender (MEAT), which considers both price and quality. The specific weighting and sub-criteria for this tender would be detailed in the full tender documentation.
6. Submission requirements
Bidders are required to submit the following:
- List of Previous Works Projects: Completed using Appendix B1, detailing at least 3 projects similar in nature and complexity. Certificates of Satisfactory Execution are required.
- Banker's Letter: Using Appendix C, confirming the contractor's banking relationship and facilities.
- Insurance Details: Confirmation of insurance cover meeting the specified minimum levels and maximum excesses. This may include a broker's confirmation of ability to procure cover if not already in place.
- Safety Management System: Proof of compliance with ISO 45001:2018 or equivalent.
- Pricing Schedule: Format and template to be specified in the tender documents.
- Declarations:
- European Single Procurement Document (ESPD) or equivalent.
- Bona Fide Tenders declaration.
- Tax clearance information.
- Conflict of Interest declaration.
- Method Statement / Response Document: Specific format and page limits will be detailed in the tender documents.
- CVs: For named personnel, with specified page limits and roles.
- Case Studies: Number and value range to be specified.
- Submission Portal: Tenders must be submitted via the eTenders platform. Specific formatting rules for electronic submissions will be provided.
- Mandatory Site Visit: If required, details of the date and contact person will be provided in the tender documents.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | Not stated |
| Clarification deadline | Not stated |
| Mandatory site visit | Not stated |
| Tender deadline | 2026-10-22T11:00:00+00:00 |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
The contract will be governed by the PW-CF6 Short Public Works Contract v1.15 (25th November 2025). Key terms include:
- Contract Term: The contract duration is not explicitly stated but is linked to the Time for Completion, which is 112 days. Extensions to the Time for Completion are possible for specific reasons outlined in clause 2.7.
- Payment Terms: Interim payments are made on account as scheduled. A final payment is made after the Defects Certificate is issued. Payment claims and responses follow a defined process, with payment due within the period stated in the Schedule. Late payments incur interest as per the European Communities (Late Payment in Commercial Transactions) Regulations 2012.
- Key SLAs/KPIs: Not explicitly detailed in the metadata, but performance is measured against the Time for Completion and the quality of works.
- Liquidated Damages: A liquidated damages rate of €200 per day applies if the Contractor fails to substantially complete the Works within the Time for Completion.
- Termination: The contract can be terminated under specific circumstances, including prolonged suspension of works (clause 3.12) or breach of contract.
- IP Ownership: Not specified in the metadata.
- Sub-contracting: The Contractor may not assign the Contract or any part of it without the Employer’s consent (clause 1.7). Sub-processors for Personal Data processing require prior written notice to the Employer (clause 1.9).
- Performance Bond: If required by the Schedule, a performance bond must be provided within 7 days of tender acceptance.
9. Risks, red flags & unusuals
- Insurance Cover Confirmation: While minimum levels are stated, the requirement for Contractors All Risk Insurance to be "No less than Contract Sum amount plus a minimum of 30%" necessitates careful calculation and potential broker engagement to confirm this level can be procured.
- Short Time for Completion: A Time for Completion of 112 days is specified. For an upgrade project, this may be tight depending on the complexity of the water services upgrade and potential site access or unforeseen issues.
- Department of Defence Context: Working within a military camp environment may involve specific security protocols, access restrictions, and operational considerations that differ from standard civilian construction sites.
- PW-CF6 Contract: This is a "Short" Public Works Contract, which implies a streamlined set of conditions. Bidders should familiarise themselves with its specific clauses, particularly regarding payment, variations, and dispute resolution.
10. SME fit assessment
This tender is likely suitable for small to medium-sized enterprises (SMEs) with a proven track record in construction, specifically in mechanical or water services upgrades.
- Credible Bidders: SMEs with an annual turnover of €1.5 million and experience in completing at least three similar projects valued over €250,000 each are well-positioned. The insurance requirements, particularly Public Liability (€6.5m), are substantial but achievable for established SMEs.
- Consortium/Sub-contracting: The contract states the Contractor may not assign the contract or any part of it without the Employer’s consent. However, sub-contracting for specific elements of the works is generally permissible in construction contracts, provided it is managed appropriately and disclosed if required. The formation of a consortium to meet experience or capacity requirements is also a possibility, with the lead member typically submitting the tender.
- Indicative Bid-Prep Effort: Preparing a compliant tender, including gathering project references, insurance confirmations, and developing pricing, could require 10-20 days of effort for an experienced SME.
- Pwin Signal: The tender does not explicitly indicate an incumbent. The use of a standard public works contract and the clear, albeit substantial, eligibility criteria suggest a competitive process. The primary challenge for SMEs will be meeting the insurance and past experience requirements.
11. Where to dig deeper
- Source RFT Filename(s): Not specified in metadata.
- eTenders CFT ID: Not specified in metadata.
- Contact Email / Clarification Portal: Not specified in metadata.
- Most Important Attachments:
- Appendix B1: List of Previous Works Projects
- Appendix C: Banker's Letter
- Schedule of Insurance Requirements
- PW-CF6_Contract_v1.15_25-11-2025.pdf (Short Public Works Contract Conditions)
Can you bid?
Required certifications
- ISO 45001:2018
Minimum turnover
€1,500,000
Public liability insurance
€6,500,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (35)
HAUL-JCA-08-ZZ-SP-AR-9000_Specification and Conservation Scope of Works.pdf
2.6 MB · Specification
Preliminary S&H Plan.pdf
280.7 KB · Specification
Volume A - Works Requirements.pdf
312.2 KB · Specification
~$25_CK_23_WR_0001 Volume A_1_General Specification.doc
162 bytes · Specification
~$lume A_1_General Specification.doc
162 bytes · Specification
Instruction to Tenderers.pdf
372.8 KB · RFT / Invitation to Tender
Volume C - Pricing Document.pdf
264.4 KB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.3 KB · Contract / Agreement / Terms
Declaration of Competence as Contractor & PSCS.pdf
15.5 KB · Contract / Agreement / Terms
PW-CF6_Contract_v1.15_25-11-2025.pdf
431.0 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.5 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
40.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
QW-Part-2-v1.1-18-11-2024.docx
58.0 KB · Form / Declaration / Certificate
QW2_Part_1_v2.2_25-11-2025.docx
192.1 KB · Form / Declaration / Certificate
Volume B - Tender & Schedule.pdf
472.7 KB · Form / Declaration / Certificate
HAUL-JCA-08-ZZ-DR-A-3000.pdf
1.1 MB · Drawing / Plan / Layout
HAUL-JCA-08-ZZ-DR-A-3001.pdf
916.0 KB · Drawing / Plan / Layout
HAUL-JCA-08-ZZ-DR-A-3002.pdf
885.3 KB · Drawing / Plan / Layout
~$2-Part-1-v2.1-18-11-2024-09-01-2025.docx
162 bytes · Other
~$2_Part_1_v2.2_25-11-2025.docx
162 bytes · Other
~$struction to Tenderers.docx
162 bytes · Other
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
32.6 KB · Appendix / Annex
Appendix_C_Bankers_Letter.docx
29.9 KB · Appendix / Annex
Appointment of PSCS.pdf
187.1 KB
Block 8 Repointing - Tender Pack.zip
8.0 MB
Electronic Funds Transfer.pdf
94.5 KB
Freedom of Information.pdf
91.5 KB
Garda Vetting.pdf
7.4 KB
Pay and Conditions of Employment Cert.pdf
163.5 KB
Revenue Info on VAT.pdf
192.3 KB · Appendix / Annex
Schedule of Insurance Requirements.pdf
121.0 KB · Appendix / Annex
~$elim S&H Plan.docx
162 bytes
~$eliminary S&H Plan.docx
162 bytes
Original notice text
This is a Call for Tender in respect of Construction Works/Services”. Please note that: Tenderers must associate themselves with this Competition in order to access the tender documents, ask and receive clarifications and submit a tender response. To do so you must ensure you click “Proceed with Association”. This can only be done via login. All responses must be submitted in a zipped file format and must be accurately named. The Contracting Authority are not in a position to answer queries marked “confidential “. Late tenders will not be accepted. Tenderers experiencing any difficulties should contact the e-tenders helpdesk at [email protected] or by phone on +353 818001459
AI analysis updated 22 minutes ago
Value
€1
Deadline
22 Oct
Buyer
Department of DefenceLocation
Finner Camp, Ballyshannon, Co. Donegal
Procedure
Open
eTenders ID
9053573
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender