Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Pre-qualification to Restricted Tenderer Panel for Howth FHC Dredging Project At Howth Fishery Harbour Centre, Dublin
Closed Construction & Civil Engineering Works Restricted

Pre-qualification to Restricted Tenderer Panel for Howth FHC Dredging Project At Howth Fishery Harbour Centre, Dublin

Value

€34.0m

Deadline

19 Jun

Pre-qualification for dredging project at Howth Fishery Harbour Centre

SME fit: Low Bid effort: Medium 📍 Dublin

Pre-qualification for dredging project at Howth Fishery Harbour Centre

Bidder profile

This tender is suited for larger civil engineering firms with significant experience in dredging and reclamation projects.

Risks & flags

  • High turnover requirement
  • Environmental compliance challenges
  • Limited participation for smaller firms

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Department of Agriculture Food and the Marine
Title Pre-qualification to Restricted Tenderer Panel for Howth FHC Dredging Project At Howth Fishery Harbour Centre, Dublin
CPV / category Not stated
Estimated value €34,000,000.00
Per-year (if multi-year) Not stated
Procedure type Restricted
Lots Not stated
Location Howth Fishery Harbour Centre, Dublin
Contract length Not stated
Submission deadline 2026-06-12T15:00:00+00:00
Go-live / start Not stated

2. Scope of Work

The Howth FHC Dredging Project involves extensive dredging and related civil engineering works at the Howth Fishery Harbour Centre in Dublin. The project aims to enhance the operational capacity of the harbour, which is critical for local fisheries and maritime activities. The contractor will be responsible for executing a series of tasks over an estimated duration of 24 months.

Key activities include:

  • Dredging Operations:

  • Dredging of the Inner Harbour, estimated to take 18 months.

  • Removal of sediment and debris to ensure navigability.

  • Stabilisation Works:

  • Stabilisation of the dredged areas to prevent erosion and ensure structural integrity.

  • Reclamation Activities:

  • Infilling of the reclamation area, with a variable volume of material to be managed, estimated between 500 and 2400 m³/day.

  • Monitoring and Reporting:

  • Dynamic probing at 32 locations and settlement monitoring at 8 locations to assess the impact of dredging.

  • Monitoring of placed material temperature at 4 locations.

  • Finishings:

  • Final touches and landscaping of the dredged and reclaimed areas, expected to take 6 months.

The contractor must adhere to environmental regulations, particularly concerning the proximity to designated Natura 2000 sites within 15 km of the project area.

3. Background & buyer context

This procurement is initiated to support the enhancement of the Howth Fishery Harbour Centre, aligning with national policies aimed at improving local fisheries and maritime infrastructure. The project is part of a broader strategy to bolster the economic viability of coastal communities and ensure sustainable fishing practices. The Department of Agriculture Food and the Marine has a vested interest in the successful execution of this project, which is expected to contribute significantly to the local economy. No incumbent contractor is specified in the documentation.

4. Eligibility & selection criteria

Bidders must meet the following eligibility and selection criteria:

  • Turnover Requirement:

  • Minimum average annual turnover of €20,000,000.00 in civil engineering.

  • Insurance:

  • Public Liability Insurance: Minimum level of €6,500,000.00.

  • Employer’s Liability Insurance: Minimum level of €13,000,000.00.

  • Professional Indemnity Insurance: Not specified for this tender.

  • Certifications:

  • Compliance with EN ISO 9001 and ISO 45001:2018 or equivalent.

  • Past Experience:

  • A minimum of three project examples similar in nature and complexity to the works, with a capital value greater than €10,000,000.00.

  • Personnel:

  • A minimum of 20 years’ post-graduate experience in relevant roles.

  • Geographic Constraints:

  • Not specified for this tender.

5. Award criteria & scoring

Bids will be evaluated based on the following criteria:

Criterion Weight (%) Sub-criteria Pass/Fail Thresholds
Price 40% Competitive pricing Not specified
Quality 60% Technical approach, past experience, personnel qualifications Not specified

The evaluation will follow a Most Economically Advantageous Tender (MEAT) approach, balancing price and quality. No minimum scoring threshold is specified for individual criteria.

6. Submission requirements

Bidders must submit the following documents:

  • Method Statement: A detailed response document following the provided template, with a maximum of 20 pages.
  • CVs: CVs for key personnel, limited to 2 pages each.
  • Pricing Schedule: Completed using the specified template.
  • Case Studies: A minimum of five case studies demonstrating relevant experience, with project values exceeding €10,000,000.00.
  • Declarations: Including ESPD, Bona Fides, Tax Clearance, and Conflict of Interest declarations.
  • Mandatory Site Visit: Not specified for this tender.
  • Submission Portal: All documents must be submitted via eTenders, adhering to specified format rules.

7. Key dates & process

Event Date
RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-06-12 at 15:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

Key contract terms include:

  • Term and Extensions: Not specified.
  • Payment Terms: Not specified.
  • Key SLAs/KPIs: Not specified.
  • Liquidated Damages: Not specified.
  • Termination Clauses: Not specified.
  • IP Ownership: Not specified.
  • Sub-contracting Rules: Not specified.
  • Parent Company Guarantee or Bond Requirements: Not specified.

9. Risks, red flags & unusuals

Potential risks associated with this tender include:

  • The turnover requirement of €20,000,000.00 may limit participation to larger firms, potentially excluding smaller contractors.
  • The absence of specified insurance requirements for Professional Indemnity may raise concerns about liability coverage.
  • The project’s proximity to Natura 2000 sites may introduce environmental compliance challenges, particularly for firms without prior experience in similar contexts.

10. SME fit assessment

This tender is primarily suited for larger civil engineering firms with substantial experience in dredging and reclamation projects.

  • Credible Bidders: Firms with a minimum turnover of €20,000,000.00 in civil engineering and a strong track record in similar projects.
  • Consortium/Sub-contracting: Not specified, but larger firms may consider forming consortia to meet experience and turnover requirements.
  • Indicative Bid-Prep Effort: Estimated at 30-40 days, considering the complexity of the project.
  • Pwin Signal: The absence of an incumbent may provide an opportunity for new entrants, but the high turnover requirement may deter smaller firms.

11. Where to dig deeper

  • Source RFT filename: Not specified.
  • eTenders CFT ID: Not specified.
  • Contact email or clarification portal: Not specified.
  • Important attachments:
  • Appendix B1 — List of Previous Works Projects
  • Appendix B2 — Certificate of Satisfactory Project Execution

This briefing provides a concise overview of the tender process and requirements for the Howth FHC Dredging Project. Interested parties should review the full tender documents for comprehensive details.

Can you bid?

Required certifications

  • EN ISO 9001
  • ISO 45001:2018

Minimum turnover

€20,000,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (27)

PDF

PW-CF3_Contract_v2.9_25-11-2025.pdf

830.3 KB · Contract / Agreement / Terms

PDF

19934-5002-D-Site Layout Plan 1 1000.pdf

931.3 KB · Drawing / Plan / Layout

PDF

19934-5014-C-Lighting Layout 1 1000.pdf

1.4 MB · Drawing / Plan / Layout

PDF

19934-5505-P02-Site Plan-Construction Stage 1 2500.pdf

547.0 KB · Drawing / Plan / Layout

ZIP

01 HowthDrgeWksPrequal SAQDocs.zip

1.7 MB

ZIP

02 HowthDrgeWksPrequal Bkgrndinfo.zip

14.6 MB

PDF

1993 -TD-MWP-CE-6002-P8-S-2-QW1 Part-1.pdf

928.8 KB

PDF

19934 EIAR Chapter 2 Description of Development.pdf

3.0 MB

PDF

19934-5006-C-Reclamation Area Cross Section DD & EE 1 200.pdf

1.4 MB

PDF

19934-5009-B-Road Sections and Details.pdf

383.4 KB

PDF

19934-5017-A-Proposed Bridge.pdf

359.0 KB

PDF

19934-5508-P01-Construction Stage Drainage.pdf

471.7 KB

PDF

19934-MWP-XX-XX-WL-C-6026-P02 (NTS) 2026.pdf

1.5 MB

PDF

19934-MWP-XX-XX-WL-C-6027-P02 (Operational Report).pdf

2.7 MB

DOCX

19934-TD-MWP-CE-6003-P8-S-0-QW Part-2.docx

65.2 KB

PDF

19934-TD-MWP-CE-6004-P8-S-0-3.4.1.pdf

385.7 KB

PDF

19934-TD-MWP-CE-6005-P8-S-0-3.4.2.pdf

437.2 KB

PDF

2026 InstrToApplicantsPrequalHowth Dredge.pdf

479.0 KB

PDF

20260602 DAFM Tender Queries Doc.pdf

181.5 KB

ZIP

Appendices C and D.zip

157.0 KB

DOCX

Appendix A ApplicantsSelfDeclarRegulat57.docx

46.5 KB · Appendix / Annex

DOCX

Appendix-B1-ListOfPrevWrksProjsCEE.docx

34.4 KB · Appendix / Annex

DOCX

Appendix-B2-CertisOfSatisfactProjExecut.docx

29.1 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

34.9 KB · Appendix / Annex

DOCX

Appendix_D1_QW1_Letter_of_Undertaking_Bond.docx

33.2 KB · Appendix / Annex

DOCX

Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx

26.8 KB · Appendix / Annex

DOCX

Forms_of_undertaking.docx

91.3 KB

Original notice text

The Howth FHC Dredging Project is a €30m+ project to dredge the harbour involves the dredging, stabilisation and beneficial reuse of circa 240,000 cubic metres of contaminated but non-hazardous bed material. This material is located within the confines of the West and East piers of Howth harbour in four main zones known as: * the fishing basin between West and Middle Piers * the channel which provides access from sea * the outer swing mooring area to the north of the inner break water * the inner Marina basin which is adjacent to the public slipway and channel It is proposed that this material is treated and stabilised using a pumped liquid mixing method in a location on the Middle Pier and pumped to a location to the West of the West Pier where it is to be used as the core infill of a new reclaimed multi use land area. In order to minimise delays and to give potential tenderers the best opportunity to tender for the overall project, the Department of Agriculture, Food and the Marine are undertaking a pre-qualification process to assess the suitability of prospective tenderers for the main construction and dredging contract relating to the Howth FHC Dredging works. The Department are proposing to prequalify the top 6 ranked applicants, with a minimum number of 3. Submissions are sought from suitably experienced applicants who can demonstrate experience relevant to the required works and who can mobilise sufficient plant and labour resources to undertake and complete the project. The works contract will be tendered in a two-stage format, with pre-qualification and suitability questionnaire stage commencing in May 2026 in order to generate a shortlist for the restricted final tender process to be undertaken. Prequal stage is expected to be complete in June/July 2026, with the restricted follow on stage to follow on shortly after.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Value

€34.0m

Deadline

19 Jun

View on eTenders ↗

Location

Howth Fishery Harbour Centre, Dublin

Procedure

Restricted

eTenders ID

8198820

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender