← Tenders / University College Dublin (UCD) Multi-Operator Framework Agreement for Construction Works and Projects
Closed Construction & Civil Engineering Works Framework Open

University College Dublin (UCD) Multi-Operator Framework Agreement for Construction Works and Projects

Value

€16.0m

Deadline

12 Aug

Framework agreement for construction and mechanical/electrical (M&E) installation services at University College Dublin's Belfield Campus.

SME fit: Low Bid effort: High 📍 Dublin

UCD framework for construction and M&E works at Belfield Campus

Bidder profile

Established construction and M&E firms with significant turnover and experience in complex campus infrastructure projects, capable of meeting detailed technical and sustainability requirements.

Risks & flags

  • Broad scope across construction and M&E
  • Extensive technical guidelines to adhere to
  • Strong emphasis on energy efficiency and carbon reduction
  • Complexity of existing campus infrastructure
  • Lack of specific details in extract (contract length, award criteria)

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer University College Dublin (UCD)
Title Unknown
CPV / category Not specified
Estimated value €16,000,000
Per-year (if multi-year) Not specified
Procedure type Not specified
Lots Not specified
Location Belfield Campus, Dublin
Contract length Not specified
Submission deadline 2026-08-12T11:00:00+00:00
Go-live / start Not specified

2. Scope of Work

This tender concerns a multi-operator framework agreement for construction works and projects at University College Dublin's Belfield Campus. The estimated value of the contract is €16,000,000. The scope encompasses a broad range of construction and mechanical/electrical (M&E) installation services, detailed within the UCD Estate Services Technical Guidelines for Designers and Specifiers.

The contractor will be responsible for:

  • Design and Specification: Developing detailed M&E designs and specifications in accordance with UCD's technical guidelines. This includes providing comprehensive drawings and specifications detailing all project aspects, connections to existing services, and any necessary interruptions or shutdowns. Electronic (AutoCAD) and hard copy formats are required.
  • Project Supervision: Acting as Project Supervisor for the Design Process (PSDP) in their area of expertise, adhering to the Safety, Health and Welfare at Work (Construction Regulations 2013). This involves integrating health and safety considerations into work programmes, preparing preliminary safety plans, and coordinating specialist sub-contractors.
  • Asbestos Management: Addressing potential asbestos presence in retrofits, reviewing UCD's asbestos register, and ensuring compliance with refurbishment and demolition survey requirements. Asbestos removal must be conducted by certified contractors with disposal certificates issued to UCD.
  • Energy Efficiency and Carbon Emissions: Implementing energy-saving measures justified on a life-cycle cost basis, including energy and carbon costs. Projects will undergo Energy Efficiency Design (EED) reviews and full life-cycle costing, incorporating shadow carbon prices. Direct electric heating is permitted only in exceptional circumstances.
  • Mechanical and Electrical Installations: Designing and installing systems for heating, ventilation, air conditioning (HVAC), water, gas, electrical power, lighting, and telecommunications. This includes:
  • Ventilation: Designing systems to minimise energy consumption, potentially using heat recovery devices and return air systems. Mechanical cooling and humidity control are generally not permitted. Ventilation rates must be balanced per fire compartment, and designs must prevent draughts and minimise noise.
  • Heating: Designing for low-temperature heat emitters, wide delta T's, and low return water temperatures, utilising low-carbon heat generation sources like heat pumps where feasible.
  • Building Management Systems (BMS): Integrating all controls through the Cylon BMS; no stand-alone systems are permitted. Detailed BMS requirements are specified, including controller architecture, cabling, programming, and field devices.
  • Water Systems: Designing potable and white water systems, including mains water, fire water, and domestic hot water distribution.
  • Gas Systems: Installing natural gas distribution networks and check meters for independent heating elements.
  • Electrical Systems: Designing medium voltage (10kV) and low voltage (400/230V) distribution, including switchgear, transformers, and UPS systems. Lighting design includes general, theatre, classroom, office, laboratory, workshop, and external lighting, with a policy favouring LED installations.
  • Alarm and Security Systems: Integrating fire alarm, intruder alarm, access control, and CCTV systems.
  • Existing Services Management: Ascertaining the full extent of existing site services through surveys and ensuring their protection and continuous operation during works. Any necessary diversions must be managed under a signed-off RAMS, generally outside normal working hours.
  • Metering: Specifying and installing electricity, heat, gas, and water meters at various points, ensuring accuracy, visibility, and maintainability. Meters must comply with specified accuracy classes and communication protocols (e.g., Modbus 485 RTU).
  • Documentation: Providing a full set of as-installed drawings, maintenance manuals, safety information, and commissioning/test records upon project completion.

The scope applies to both new buildings and refurbishment work within existing buildings on the Belfield Campus.

3. Background & buyer context

University College Dublin (UCD) is procuring these services to establish a framework for ongoing construction and mechanical/electrical (M&E) works across its Belfield Campus. The tender aligns with UCD's commitment to maintaining and developing its campus infrastructure. The UCD Estate Services Technical Guidelines for Designers and Specifiers (Draft Ver. D2.0) form the basis of the technical requirements, reflecting operational experience and a need for consistency and uniformity in M&E installations. UCD is certified to ISO50001 and utilises an Energy Management System (EMS) to manage energy and water consumption, indicating a strategic focus on sustainability and efficiency in campus development. The guidelines also address health and safety, including asbestos management, and promote energy efficiency and carbon emission reduction in all projects.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered:

  • Turnover Requirement:
  • Construction Works: €1 million average annual turnover from construction works.
  • Electrical Installation: €2,000,000 average annual turnover from electrical installations.
  • Mechanical Installation: €2 million average annual turnover from mechanical installations.
  • Insurance:
  • Professional Indemnity Insurance: Minimum €1.5m cover. Maximum excess is the greater of 2% of annual turnover or €5,000.
  • Public Liability Insurance: Minimum €6.6m cover in respect of any one accident.
  • Employer's Liability Insurance: Minimum €13m cover in respect of any one accident.
  • Certifications:
  • Safety Management System: In accordance with ISO 45001:2018 or equivalent.
  • Past Experience: Bidders must demonstrate experience delivering:
  • One (1) contract of approximately €50k value.
  • One (1) contract of approximately €400k value.
  • One (1) contract of approximately €1m value.
  • (For Electrical Installation): One (1) contract of approximately €500k value, one (1) contract of approximately €200k value, and one (1) contract of approximately €100k value.
  • Personnel: Not specified for this tender.
  • Geographic / Facility Constraints: Not specified for this tender.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided extract. Typically, public sector tenders in Ireland follow a Most Economically Advantageous Tender (MEAT) approach, balancing price and quality. The specific weighting for technical merit, price, and any sub-criteria would be detailed in the full tender documentation.

6. Submission requirements

Bidders are required to submit the following:

  • Method Statement / Response Document: Not specified for this tender.
  • CVs: Not specified for this tender.
  • Pricing Schedule: Not specified for this tender.
  • Case Studies:
  • For general construction: One contract of approx. €50k, one of approx. €400k, and one of approx. €1m.
  • For Electrical Installation: One contract of approx. €500k, one of approx. €200k, and one of approx. €100k.
  • Declarations:
  • Economic and Financial Standing information (likely via ESPD).
  • Bona Fides declarations.
  • Tax clearance.
  • Conflict of Interest declarations.
  • Mandatory Site Visit: Not specified for this tender.
  • Submission Portal: Bids must be submitted via the eTenders platform. Specific formatting rules for electronic submissions are not detailed here.

7. Key dates & process

Event Date/Time
RFT issued Not specified
Clarification deadline Not specified
Mandatory site visit Not specified
Tender deadline 2026-08-12T11:00:00+00:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

  • Contract Length: Not specified in the provided documentation.
  • Extension Structure: Not specified.
  • Payment Terms: Not specified, but standard public sector prompt payment directives will apply.
  • SLAs/KPIs: Not specified, but will likely be detailed in the full contract documents, particularly concerning project delivery, safety, and quality.
  • Liquidated Damages: Not specified.
  • Termination Clauses: Not specified.
  • IP Ownership: Not specified.
  • Sub-contracting: Not specified, but typically requires prior approval.
  • Parent Company Guarantee/Bond: Not specified.

9. Risks, red flags & unusuals

  • Broad Scope: The tender covers a wide range of construction and M&E services under a single framework. This could favour larger, diversified contractors or necessitate consortia/sub-contracting arrangements for smaller, specialised firms.
  • Technical Guidelines: The extensive "UCD Estate Services Technical Guidelines for Designers and Specifiers" (Draft Ver. D2.0) represent a significant body of detailed technical requirements. Bidders must demonstrate a thorough understanding and ability to comply with these specific standards, which are integral to the contract.
  • Energy/Carbon Focus: UCD's strong emphasis on energy efficiency, ISO50001 certification, and the use of shadow carbon prices indicates a strategic driver that bidders must integrate into their design and execution approaches.
  • Existing Infrastructure: The complexity of UCD's Belfield Campus infrastructure, including underground utilities and a medium voltage electrical network, presents a significant challenge. Thorough site investigation and careful planning for connections and diversions are critical.
  • Lack of Specifics: Key details such as contract length, specific award criteria, and submission format are not provided in the extract, requiring bidders to consult the full tender documents.

10. SME fit assessment

This tender is structured as a framework agreement with an estimated value of €16,000,000. The broad scope encompassing general construction works and detailed mechanical and electrical installations suggests it is primarily aimed at medium to large construction and M&E firms.

  • Credible Bidders: Viable bidders would typically be established construction companies with a proven track record in managing multi-disciplinary projects, and/or specialist M&E contractors with expertise in building services, BMS, and energy management systems. The turnover requirements (€1m-€2m depending on the specific work area) indicate a need for businesses with substantial annual revenue.
  • Consortium/Sub-contracting: While not explicitly stated, framework agreements of this nature often allow for consortia or sub-contracting to meet the diverse requirements. Small and Medium Enterprises (SMEs) might find opportunities as sub-contractors to larger framework members, particularly in specialised areas like electrical, mechanical, or BMS installations.
  • Indicative Bid-Prep Effort: Given the detailed technical guidelines and the need to demonstrate compliance across various work streams, bid preparation would likely require significant effort, potentially several weeks, involving technical specialists, estimators, and health and safety officers.
  • Pwin Signal: The tender is for a framework agreement, which implies a competitive process. The specific value and broad scope suggest it is open to a range of established players. Without information on previous framework awards or incumbent suppliers, it is difficult to assess the "Pwin" (probability of winning) signal definitively. However, the detailed technical specifications and experience requirements suggest a focus on established capability rather than new market entrants unless they can demonstrate equivalent experience.

11. Where to dig deeper

  • Source RFT Filename(s): [Appendix 10 - UCD Design Guidelines Draft Issue D2.0.pdf]
  • eTenders CFT ID: Not specified.
  • Contact Email / Clarification Portal: Not specified.
  • Most Important Attachments:
  • Appendix 10 - UCD Design Guidelines Draft Issue D2.0.pdf
  • (Likely other appendices detailing specific technical requirements, pricing schedules, and contract conditions will be provided with the full RFT).

Can you bid?

Required certifications

  • ISO 45001:2018

Minimum turnover

€1,000,000

Public liability insurance

€6,600,000

Professional indemnity insurance

€1,500,000

Named standards / methodologies

ISO 45001ISO 50001AutoCADCylon BMS

Documents (56)

PDF

22526-Architects Specification-2026-06-17.pdf

109.9 KB · Specification

PDF

Appendix 2 - Mechancial Specification.pdf

1.1 MB · Specification

PDF

UCDOPP5545 Minor Works Framework ITT.pdf

598.6 KB · RFT / Invitation to Tender

PDF

202659 UCD JHN - Tender - June 2026.pdf

409.7 KB · Pricing / BOQ / Schedule of Rates

XLSX

202659 UCD JHN - Tender - June 2026.xlsx

2.2 MB · Pricing / BOQ / Schedule of Rates

PDF

Approximate Builders Work Schedule.pdf

318.8 KB · Pricing / BOQ / Schedule of Rates

XLSX

UCDOPP5545 Lot 2. Pricing Schedule v.02.xlsx

210.3 KB · Pricing / BOQ / Schedule of Rates

XLSX

UCDOPP5545 Lot 2. Pricing Schedule.xlsx

210.2 KB · Pricing / BOQ / Schedule of Rates

XLSX

UCDOPP5545 Lot 1. Pricing Schedule.xlsx

69.4 KB · Pricing / BOQ / Schedule of Rates

XLSX

UCDOPP5545 Lot 3. Pricing Schedule.xlsx

141.4 KB · Pricing / BOQ / Schedule of Rates

DOCX

3.4.1-HS-Works-Contractor Lot 1. Construction.docx

59.4 KB · Contract / Agreement / Terms

PDF

PW-CF6-v1.13-29-07-2021.pdf

434.3 KB · Contract / Agreement / Terms

DOCX

UCDOPP5545 Minor Works PW-CF9 Framework Agreement.docx

55.6 KB · Contract / Agreement / Terms

DOCX

UCDOPP5545 Section 3.4.1-HS-Works-Contractor Lot 2. Electrical Works.docx

3.8 MB · Contract / Agreement / Terms

DOCX

UCDOPP5545 Section 3.4.1-HS-Works-Contractor Lot 3. Mechanical Works.docx

59.8 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS Lot 1. Construction.docx

43.4 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

27.6 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW2-Part-1 Lot 2. Electrical Works.docx

200.9 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW2-Part-1 Lot 3. Mechanical Works.docx

196.2 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW_Part_1_ Lot 1 Construction Works.docx

200.4 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW_Part_2_ Lot 1 Construction Works.docx

61.0 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW_Part_2_ Lot 2 Electrical Works.docx

61.1 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 QW_Part_2_ Lot 3. Mechanical Works.docx

61.0 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 Section 3.4.2-HS-PSCS Lot 2. Electrical Works.docx

53.9 KB · Form / Declaration / Certificate

DOCX

UCDOPP5545 Section 3.4.2-HS-PSCS Lot 3. Mechanical Works.docx

44.5 KB · Form / Declaration / Certificate

PDF

22526 JHN Roof Phase-2 Roof upgrade BDE - Tender Drawings 11 06 2026.pdf

8.6 MB · Drawing / Plan / Layout

PDF

BW001_BUILDERS WORK-BW001.pdf

2.6 MB · Drawing / Plan / Layout

PDF

DM100_DEMOLITION_HEATING-DM100.pdf

2.4 MB · Drawing / Plan / Layout

PDF

DM200_WATER-DM200.pdf

1.6 MB · Drawing / Plan / Layout

PDF

DM300_DEMOLITION_VENTILATION-DM300.pdf

2.3 MB · Drawing / Plan / Layout

PDF

Drawing Register.pdf

299.3 KB · Drawing / Plan / Layout

PDF

E600 Controls-E600.pdf

326.2 KB · Drawing / Plan / Layout

ZIP

Electrical Drawings CAD.zip

2.1 MB · Drawing / Plan / Layout

PDF

M100_HEATING-M100.pdf

303.7 KB · Drawing / Plan / Layout

PDF

M2000_HEATING_WATER_SCHEMATIC-ME2000.pdf

1.2 MB · Drawing / Plan / Layout

PDF

M200_WATER-M200.pdf

296.7 KB · Drawing / Plan / Layout

PDF

M300_VENTILATION-M300.pdf

281.9 KB · Drawing / Plan / Layout

PDF

M400_SOIL&WASTE-M400.pdf

455.0 KB · Drawing / Plan / Layout

PDF

22526 Preliminary H&S Plan John Henry Newman Building Roofs 17 06 26.pdf

178.7 KB · Other

DOCX

Design Risk Assessment for Science Hub and Science Plantroom Lighting Upgrades.docx

1.1 MB · Other

PDF

GN-1.5-v2.1-28-06-2016.pdf

1.1 MB · Other

OTHER

plot.log

209 bytes · Other

ZIP

Published Documents.zip

41.7 MB · Other

PDF

Risk Assesment.pdf

1.9 MB · Other

PDF

UCD Induction.pdf

1.4 MB · Other

DOCX

~$_Part_2_v1.1_18-11-2024.docx

162 bytes · Other

PDF

AF1.pdf

470.0 KB

PDF

Appendix 1 - Preliminaries.pdf

680.5 KB · Appendix / Annex

PDF

Appendix 10 - UCD Design Guidelines Draft Issue D2.0.pdf

3.3 MB · Appendix / Annex

DOCX

Appendix_B1_QC1_and_QC2_09-02-2022.docx

16.6 KB · Appendix / Annex

PDF

DR A D06A Proposed Detail Section 1 17 07 2026.pdf

1.4 MB

DOCX

FTS-6-v1.5-07-01-2022 (2).docx

49.0 KB · Tender Response Template

PDF

UCD Campus Map.pdf

4.1 MB · Appendix / Annex

DOCX

UCDOPP5545 Tender Response Document.docx

117.2 KB · Tender Response Template

Original notice text

University College Dublin or any wholly owned subsidiaries thereof (the “Contracting Authority”) invites tenders (“Tenders”) to this Invitation to Tender (“ITT”) from economic operators (“Tenderers”) for the supply of the works as described in the published documents over three Lots: Lot 1: Construction Works up to €1,000,000 Lot 2: Electrical Works up to €1,000,000 Lot 3. Mechanical Works up to €1,000,000

AI analysis updated 1 month ago

Bid ↗
Details

Value

€16.0m

Deadline

12 Aug

View on eTenders ↗

Location

Belfield Campus, Dublin

Procedure

Open

eTenders ID

8314722

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender