Cleeves Riverside Quarter - Engineer Led Design Team Services - Site Activation Works
Deadline
31 Jul
31 Jul 2026
Deadline
31 Jul
Engineer led design team services for Cleeves Riverside Quarter site activation in Limerick.
Engineer led design team services for Cleeves Riverside Quarter site activation in Limerick.
Bidder profile
Firms with experience in engineering design and project management, particularly in urban development.
Risks & flags
- Minimum turnover requirement
- Geographic constraints
- Tight timelines
- Incumbent advantage
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Limerick Twenty Thirty DAC |
|---|---|
| Title | Cleeves Riverside Quarter - Engineer Led Design Team Services - Site Activation Works |
| CPV / category | not stated |
| Estimated value | not disclosed |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | Limerick, Ireland |
| Contract length | 43 months (including 12 months defects liability period) |
| Submission deadline | 24 July 2026, 11:00 AM |
| Go-live / start | not stated |
2. Scope of Work
The contract involves the provision of Engineer Led Single Point Design Team (SPDT) Services for the Cleeves Riverside Quarter - Phase II(a) Site Activation Works. The contractor will be responsible for a range of activities that ensure the successful activation of the site, which is part of a larger urban regeneration project in Limerick.
Key activities include:
- Design Development: The contractor must develop detailed designs in compliance with relevant standards, including ISO 19650.
- Project Management: Overseeing the project timeline, budget, and resources to ensure timely completion.
- Stakeholder Engagement: Coordinating with various stakeholders, including local authorities and community groups.
- Site Surveys: Conducting geotechnical and environmental surveys to inform design decisions.
- BIM Execution Plans: Developing and implementing Building Information Modeling (BIM) strategies to enhance project delivery.
- Regulatory Compliance: Ensuring all designs meet local planning and building regulations.
- Construction Documentation: Preparing detailed construction documents and specifications for contractors.
- Quality Assurance: Implementing quality control measures throughout the design and construction phases.
- Site Supervision: Providing oversight during construction to ensure adherence to design specifications and safety standards.
The contractor will also be required to manage risks associated with the project, including potential delays and budget overruns, and to provide regular updates to the client.
3. Background & buyer context
This procurement aligns with the Limerick Twenty Thirty DAC's strategic objectives to regenerate urban areas and enhance local infrastructure. The Cleeves Riverside Quarter project is part of a broader initiative funded by the Government of Ireland to stimulate economic growth and improve public amenities. The urgency of this procurement reflects the need to advance the project timeline, with construction expected to commence in late 2027 and reach practical completion by December 2028.
4. Eligibility & selection criteria
Bidders must meet the following eligibility and selection criteria:
- Turnover requirement: Minimum average annual turnover of €1,500,000 over the last three financial years.
- Insurance:
- Public Liability Insurance: €6,500,000
- Employers’ Liability Insurance: €13,000,000
- Professional Indemnity Insurance: €6,000,000 (Each and Every claim basis) / €6,500,000 (Annual Aggregate basis)
- Certifications: Compliance with ISO 19650 standards and other relevant certifications.
- Past experience: Evidence of at least five comparable projects completed in the last five years, each with a minimum value of €1,000,000.
- Personnel: Key team members must include a Chartered Engineer with at least 15 years of experience and a Senior Civil Engineer with at least 10 years of experience.
- Geographic constraints: Bidders must be located within the EU/EEA.
5. Award criteria & scoring
Bids will be evaluated based on the following criteria:
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Threshold |
|---|---|---|---|
| Quality of Proposal | 70% | Technical approach, team qualifications, project management strategy | Minimum score of 60% |
| Price | 30% | Total cost, breakdown of fees | No minimum threshold |
The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, balancing quality and price.
6. Submission requirements
Bidders must submit the following documents:
- Method statement: A detailed response document following the provided template, with a maximum of 20 pages.
- CVs: Curriculum Vitae for key personnel, limited to 2 pages each.
- Pricing schedule: A completed pricing schedule using the specified template.
- Case studies: At least three case studies of relevant projects, each valued between €1,000,000 and €5,000,000.
- Declarations: Completed European Single Procurement Document (ESPD), Bona Fides, Tax clearance certificate, and Conflict of Interest declaration.
- Mandatory site visit: Attendance at a site visit is required; details will be provided upon request.
- Submission portal: All submissions must be made through the eTenders platform, adhering to specified format rules.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | Not specified |
| Clarification deadline | 10 July 2026 |
| Mandatory site visit | Not specified |
| Tender deadline | 24 July 2026, 11:00 AM |
| Expected award | Not specified |
| Contract start | Not specified |
| Go-live / mobilisation | Not specified |
8. Contract terms that matter
Key contract terms include:
- Contract duration: 43 months, including a 12-month defects liability period.
- Payment terms: Payments will be made based on milestones achieved, as outlined in the pricing schedule.
- Key SLAs/KPIs: Specific performance indicators will be established to monitor project progress and quality.
- Liquidated damages: Penalties may apply for delays beyond agreed timelines.
- Termination clauses: The client reserves the right to terminate the contract with appropriate notice under specified conditions.
- IP ownership: All intellectual property rights generated during the project will belong to the client.
- Sub-contracting rules: Sub-contracting is permitted but must be disclosed and approved by the client.
9. Risks, red flags & unusuals
Potential risks and concerns include:
- Turnover threshold: The minimum turnover requirement of €1,500,000 may limit participation from smaller firms.
- Geographic constraints: The requirement for bidders to be located within the EU/EEA could restrict competition.
- Tight timelines: The expected construction start date in late 2027 may pose challenges for bidders in terms of resource allocation and project planning.
- Incumbent advantage: Previous experience with the client or similar projects may provide an advantage to incumbent firms.
10. SME fit assessment
Small and medium-sized enterprises (SMEs) that can credibly bid for this tender should possess:
- Size and specialism: Firms with experience in engineering design and project management, particularly in urban development.
- Certifications: Relevant ISO certifications and professional memberships are essential.
- Consortium or sub-contracting: Bidders may form consortia, but the combined turnover must meet the minimum requirement.
- Indicative bid-prep effort: Approximately 15-20 days may be required to prepare a competitive bid.
- Pwin signal: The presence of incumbents and previous winners may indicate a competitive landscape, suggesting a moderate to high probability of winning for well-prepared bidders.
11. Where to dig deeper
- Source RFT filename: App D_FTS9_Site Activation Works.docx
- eTenders CFT ID: Not specified
- Contact email: [email protected]
- Important attachments:
- Appendix B1: List of Previous Projects/Certificate of Satisfactory Execution
- Pricing Schedule
- Method Statement Template
Can you bid?
Required certifications
- ISO 19650
Minimum turnover
€1,500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€6,000,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (21)
CRQ-SA-X-X-XXX-PZ-ADX-IM-0001-AppointingPartyEIR-P1-D-0.pdf
886.8 KB · Specification
CRQ-SA-X-X-XXX-PZ-ADX-IM-0002-InformationProtocol6-P1-D-0.pdf
689.1 KB · Specification
CRQ-SA-X-X-XXX-RP-LTT-PM-0001 (Project Information Memorandum).pdf
16.4 MB · Specification
CRQ-SA-X-X-XXX-RP-LTT-PM-0002 (Services Requirement Document).pdf
418.2 KB · Specification
App C_ITT_S2b_Site Activation Works.docx
102.0 KB · RFT / Invitation to Tender
App E_Fee Build Up Schedule_Site Activation Works.xlsx
32.5 KB · Pricing / BOQ / Schedule of Rates
App F_COE1_v2.j_Consultancy_Technical - Site Activation.docx
89.1 KB · Contract / Agreement / Terms
App G_MF_2.3_Collateral_Warranty.docx
53.0 KB · Contract / Agreement / Terms
App H_MF_2.4_H&S Compliance Declaration.docx
37.1 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
29.6 KB · Form / Declaration / Certificate
CRQ-SA-X-X-XXX-TE-ADX-IM-0002-BIMCapabilityAssessmentTemplate-P1-D-0.pdf
200.7 KB · Form / Declaration / Certificate
SPDT_QC-Part-2.docx
70.6 KB · Form / Declaration / Certificate
SPDT_QC2-Part-1.docx
160.6 KB · Form / Declaration / Certificate
Tender Documents.zip
15.3 MB · Other
App C_ITT_S2b_Site Activation Works_REV A.docx
103.0 KB
App D_FTS9_Site Activation Works.docx
194.4 KB · Tender Response Template
Appendix_B1_QC1_and_QC2_09-02-2022.docx
24.3 KB · Appendix / Annex
CRQ-SA-X-X-XXX-PZ-ADX-IM-0003-InformationManagementAssignmentMatrix-P1-D-0.pdf
159.1 KB · Appendix / Annex
CRQ-SA-X-X-XXX-PZ-ADX-IM-0004-HighLevelResponsibilityMatrix-P1-D-0.pdf
373.7 KB · Appendix / Annex
CRQ-SA-X-X-XXX-TE-ADX-IM-0003-BEPWorkedExample-P1-D-0.pdf
281.3 KB · Appendix / Annex
ESPD.docx
78.5 KB · ESPD (European Single Procurement Document)
Original notice text
Limerick Twenty Thirty DAC are seeking submissions for the provision of Engineer Led Single Point Design Team Services for the delivery of the Phase II (a) - Site Activation Works as part of the overall Cleeves Riverside Quarter development. The Site Activation Works is an infrastructure focused project aimed to unlock development with particular focus on expediting delivery of the designated housing development zones at Salesians, Stonetown Terrace, Quarry PBSA, and O’Callaghan Strand. The project consists of a coordinated package of demolitions, public realm and critical infrastructure pertaining to water supply, wastewater and surface water, utilities, flood protection, and transport infrastructure. There are also a number of listed buildings within the curtilage of the site.
AI analysis updated 1 month, 2 weeks ago
Deadline
31 Jul
Location
Cleeves Riverside Quarter, Limerick, Ireland
Procedure
Open
Clarification
10 Jul 2026
eTenders ID
8186700
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender