Works to the East of Pedestrian Crossing - Durrow, Co. Laois
Value
€140k
Deadline
08 May
08 May 2026
Value
€140k
Deadline
08 May
Construction works for pedestrian crossing improvements in Durrow, Co. Laois
Construction works for pedestrian crossing improvements in Durrow, Co. Laois
Bidder profile
This opportunity is suitable for SMEs or lower-mid-market contractors with strong compliance capabilities.
Risks & flags
- Compliance risks
- Submission deadlines
- Quality control requirements
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | Laois County Council |
| Title | Works to the East of Pedestrian Crossing - Durrow, Co. Laois |
| CPV / category | Construction & Civil Engineering |
| Estimated value | €140,000.00 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-05-08T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The contracting authority sought construction & civil engineering under the title "Works to the East of Pedestrian Crossing - Durrow, Co. Laois" for Laois County Council. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included €250,000, €200,000, 10 days, 60 days.
Less than €250,000. Projects in excess of €200,000 must be advertised on eTenders. New D400 Chamber Cover and Frame to be provided on existing gully pot. Clearance Access Number and Tax Reference Number to facilitate online verification of their tax. Delivery by hand, Tenders must include the number and type of paper and/or electronic copies. Number and type of Electronic. To be fitted with draw rope terminated securely in each chamber and terminal point.
3. Background & buyer context
The process was run by Laois County Council with deadline recorded as 2026-05-08T15:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.
4. Eligibility & selection criteria
Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: less than €250,000. Projects in excess of €200,000 must be advertised on eTenders; New D400 Chamber Cover and Frame to be provided on existing gully pot; Clearance Access Number and Tax Reference Number to facilitate online verification of their tax; delivery by hand, Tenders must include the number and type of paper and/or electronic copies; Number and type of Electronic. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.
5. Award criteria & scoring
Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.
6. Submission requirements
Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.
7. Key dates & process
Commercial baseline in metadata showed estimated value €140,000.00. Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.
8. Contract terms that matter
Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included less than €250,000. Projects in excess of €200,000 must be advertised on eTenders; New D400 Chamber Cover and Frame to be provided on existing gully pot; Clearance Access Number and Tax Reference Number to facilitate online verification of their tax; delivery by hand, Tenders must include the number and type of paper and/or electronic copies; Number and type of Electronic; to be fitted with draw rope terminated securely in each chamber and terminal point. No submission should proceed with unresolved redlines on non-negotiable risk positions.
9. Risks, red flags & unusuals
Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-08T15:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.
10. SME fit assessment
- Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
- Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
- Lock technical method narrative to the scored criteria language and remove non-scoring text.
- Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
- Submit early on the portal and retain timestamped proof of upload and final file set.
11. Where to dig deeper
This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: dfb398f6-06db-43bf-8d9f-60c44e5be695.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Scoring
Most Economically Advantageous Tender
Documents (10)
25185-01-603_ITTW4_Open_Procedure_Short_Form_v2.0_18-11-2024.pdf
1.4 MB · RFT / Invitation to Tender
24016-01-0102 General Layout - Rev C.pdf
492.5 KB · Drawing / Plan / Layout
24016-01-0103 General Layout - Rev C.pdf
429.2 KB · Drawing / Plan / Layout
24016-01-1101 Kerbs, Footpaths and Paved Areas - Rev D.pdf
446.3 KB · Drawing / Plan / Layout
24016-01-2712 EIR Service Diversions - Rev C.pdf
334.2 KB · Drawing / Plan / Layout
25185-01 Tender Drawings.pdf
5.9 MB · Drawing / Plan / Layout
25185-01-0005 Existing Services.pdf
584.9 KB · Drawing / Plan / Layout
2025-25185-01-005_QA.pdf
1.7 MB · Other
2025-25185-02-001_RSA2.pdf
2.3 MB · Other
25185-01-602 ITTW4_Invitation_to_Tender_Letter.doc
31.5 KB
Original notice text
Laois County Council require road upgrade works to the East of Pedestrian Crossing, Durrow
AI analysis updated 2 months, 3 weeks ago
Value
€140k
Deadline
08 May
Buyer
Laois County CouncilLocation
Durrow, Co. Laois
Procedure
Open
Clarification
08 May 2026
eTenders ID
7694883
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender