Main Contractor for The Society of St Vincent de Paul, Community Drop In Centre, Limerick
Deadline
15 May
15 May 2026
Deadline
15 May
Main contractor sought for Community Drop In Centre in Limerick
Main contractor sought for Community Drop In Centre in Limerick
Bidder profile
This opportunity is suitable for SMEs or lower-mid-market contractors with strong compliance and bid management capabilities.
Risks & flags
- strict procurement timelines
- insurance compliance requirements
- quality control obligations
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Field | Detail |
|---|---|
| Buyer | The Society of St Vincent De Paul |
| Title | Main Contractor for The Society of St Vincent de Paul, Community Drop In Centre, Limerick |
| CPV / category | Construction & Civil Engineering |
| Estimated value | not disclosed (eTenders placeholder) |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-05-15T11:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The contracting authority sought construction & civil engineering under the title "Main Contractor for The Society of St Vincent de Paul, Community Drop In Centre, Limerick" for The Society of St Vincent De Paul. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included € 2,500,000, 2%, €5,000, € 6,500,000, € 10,000, €6,500,000, € 13,000,000, €2.5.
Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[14] € 2,500,000 CA SUPPLEMENTARY REQUIREMENTS: Th. Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate. Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect. CA SUPPLEMENTARY REQUIREMENTS: The minimum standard is proof that the contractor has public liability insurance cover for €6,500,000 in place for any one event. Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing. General Construction[14] € 2,500,000 .
3. Background & buyer context
The process was run by The Society of St Vincent De Paul with deadline recorded as 2026-05-15T11:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.
4. Eligibility & selection criteria
Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[14] € 2,500,000 CA SUPPLEMENTARY REQUIREMENTS: Th; Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect; CA SUPPLEMENTARY REQUIREMENTS: The minimum standard is proof that the contractor has public liability insurance cover for €6,500,000 in place for any one event; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.
5. Award criteria & scoring
Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.
6. Submission requirements
Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.
7. Key dates & process
Commercial baseline in metadata showed estimated value not disclosed (eTenders placeholder). Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.
8. Contract terms that matter
Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Turnover Requirement Area of Business/Work: Yearly Turnover arising from the area of work specified: General Construction[14] € 2,500,000 CA SUPPLEMENTARY REQUIREMENTS: Th; Professional Indemnity Insurance required for € N/A[16] The excess as stated here: Maximum permissible excess on Professional Indemnity Insurance in any one claim below which the Contractor will bear the cost is the greater amount of 2% of the Applicant’s annual turnover, or €5,000. Cover provided on an annual aggregate; Minimum level of Public Liability Insurance required in respect of any one accident: € 6,500,000[18] Maximum level of excess for property only* for any one incident below which the Works Contractor will bear the cost: € 10,000 *No excess is permitted in respect; CA SUPPLEMENTARY REQUIREMENTS: The minimum standard is proof that the contractor has public liability insurance cover for €6,500,000 in place for any one event; Minimum level of Employer’s Liability Insurance required in respect of any one accident: € 13,000,000[19] Entitles issuing; General Construction[14] € 2,500,000 . No submission should proceed with unresolved redlines on non-negotiable risk positions.
9. Risks, red flags & unusuals
Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-15T11:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.
10. SME fit assessment
- Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
- Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
- Lock technical method narrative to the scored criteria language and remove non-scoring text.
- Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
- Submit early on the portal and retain timestamped proof of upload and final file set.
11. Where to dig deeper
This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: e3d27fd8-ffa9-484d-b3b8-366875053322.
Can you bid?
Required certifications
- ISO 9001
- Safe-T-Cert
Minimum turnover
€2,500,000
Public liability insurance
€6,500,000
Scoring
Most Economically Advantageous Tender
Documents (13)
3.4.1 HS Works Contractor.docx
51.8 KB · Contract / Agreement / Terms
3.4.2 HS PSCS.docx
43.3 KB · Form / Declaration / Certificate
Appendix A Applicants Self Declaration Regulation 57.docx
41.1 KB · Form / Declaration / Certificate
Appendix B2 Certificate of Satisfactory Project Execution.docx
26.0 KB · Form / Declaration / Certificate
Project Information Memorandum.pdf
713.0 KB · Other
Appendix 1 Forms of Undertaking.docx
91.5 KB · Appendix / Annex
Appendix A - Architectural Heritage Impact Assessment 2018-05-12.pdf
8.5 MB · Appendix / Annex
Appendix B - Site Location Plan.pdf
1.4 MB · Appendix / Annex
Appendix B1 List of Previous WorksProjects.docx
31.3 KB · Appendix / Annex
Appendix D Staff CV.docx
57.7 KB · Appendix / Annex
Appendix D1 Letter of Undertaking re Bond.docx
35.3 KB · Appendix / Annex
QW Part 2.docx
58.3 KB · Tender Response Template
QW1 Part 1.docx
231.1 KB · ESPD (European Single Procurement Document)
Original notice text
Frederic Ozanam Trust are seeking main contractors for the construction of a Community Drop In Centre, Hartstonge Street, Limerick. The project comprises the development of a Community Drop In Centre within the Mechanics Institute Building, Hartstonge Street, Limerick to augment the existing St Vincent de Paul facilities located to the rear of the adjacent Ozanam House. The project also includes the reconfiguration and refurbishment of the ground and first floors of the Coach House located to the rear of Ozanam House. The project will be constructed in phases with the works to the Mechanics Institute Building completed first and the building handed over prior to works commencing on the reconfiguration and refurbishment of the Coach House. The Mechanics Institute Building is included in the Register of Protected Structures in Ireland.
AI analysis updated 3 months ago
Deadline
15 May
Location
Community Drop In Centre, Harstonge St, Limerick
Procedure
Restricted
Clarification
15 May 2026
eTenders ID
7886467
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender