Supply of Electrical stock items to Dublin airport
Deadline
30 Aug
30 Aug 2026
Deadline
30 Aug
RFI for a strategic partnership to supply electrical stock and non-stock items for Dublin Airport, focusing on MRO consumables with responsive ordering and short lead times.
daa plc seeks supplier for electrical stock and non-stock items for Dublin Airport
Bidder profile
Suppliers with experience in electrical MRO, robust inventory management, logistics, and system integration capabilities, potentially operating within large-scale or airport environments. SMEs may need to form consortia or leverage parent company resources.
Risks & flags
- Dual turnover requirements need clarification
- RFI is a prequalification step, not full tender
- Potential e-Auction in RFT stage
- Mandatory use of specific customs clearance supplier
- Indicative dates subject to change
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | daa plc |
|---|---|
| Title | Supply of Electrical stock items to Dublin airport |
| CPV / category | 31000000-6 (Electrical machinery, apparatus, equipment and consumables; lighting) |
| Estimated value | not disclosed |
| Per-year | not stated |
| Procedure type | Request for Information (RFI) leading to RFT |
| Lots | 1 |
| Location | Dublin Airport |
| Contract length | not stated |
| Submission deadline | 30/08/2026 at 14:00 |
| Go-live / start | December 2026 |
2. Scope of Work
This procurement seeks a supplier for the provision of electrical stock and non-stock items for Dublin Airport. The core objective is to establish a strategic partnership for a consistent, high-quality, and cost-effective supply of consumables and electrical stock items to support operational and maintenance needs. The supplier must ensure the availability of essential Maintenance, Repair and Operations (MRO) items through responsive ordering and short lead times.
Key activities and deliverables include:
- Supply of Consumables and Electrical Stock Items: Provision of a wide range of predefined stock items, with the flexibility to add, amend, or discontinue items as operational needs evolve. The supplier must offer a percentage discount off standard catalogue pricing.
- Delivery and Logistics: Delivery of stock items to the central store between 09:00 and 12:00. Fulfilment of both scheduled min/max-generated orders and ad hoc requisitions. Weekly operational meetings with the stores team are required to review performance, open orders, and invoice queries.
- Catalogue and Systems Integration: Provision of an electronic catalogue compatible with Maximo 7.6/Oracle ERP. Timely updates to catalogue data are required, subject to approval by daa. The supplier must be able to receive purchase orders via a centrally monitored email address and acknowledge receipt where possible.
- Inventory Management Support: Holding up to 10% of high-usage items in the supplier’s warehouse. Demonstrating capability to manage stock levels, respond to changes in high-usage items, and support daa’s central and satellite stores. Supporting barcoding accuracy and future enhancements to scanning processes.
- Compliance with Service Level Agreement (SLA): Meeting or exceeding SLA requirements across on-time and in-full delivery, lead times, helpdesk responsiveness, product quality, customer satisfaction, continuous improvement initiatives, and reporting accuracy and timeliness.
- Reporting and Performance Monitoring: Provision of monthly management information, including items supplied, returns, price variances, SLA performance metrics, and additional bespoke reports as required.
- Continuous Improvement and Innovation: Delivery of at least six Continuous Improvement (CI) initiatives annually, focusing on cost reduction, process efficiency, error reduction, sustainability, and improved reporting.
- Sustainability Objectives: Minimising environmental impact through recyclable packaging, reducing unnecessary packaging, consolidating deliveries, promoting sustainable product choices, strengthening logistics to reduce carbon emissions, minimising inventory waste and obsolescence, and enhancing circularity and responsible disposal. The Contracting Authority implements ISO 50001 for energy management.
3. Background & buyer context
daa plc, formerly Dublin Airport Authority and Aer Rianta, is the contracting authority. It is a major international airport company employing over 3,000 people, with principal activities in airport development, operation, and management, Irish and international airport retail management, and international airport investment. This procurement is driven by the need to secure a reliable, best-value supplier for electrical stock and non-stock items to support Dublin Airport's operational and maintenance requirements. The objective is to establish a strategic supplier partnership capable of delivering consistent, high-quality, and cost-effective supply. The contract will integrate with daa’s ISO 55001 asset-management framework, aiming to optimise inventory management and improve supply-chain visibility.
4. Eligibility & selection criteria
Bidders must satisfy the following minimum requirements to be considered for shortlisting. These are assessed in Step One and Step Two of the RFI evaluation process.
- Turnover requirement: A minimum turnover of €300,000 per annum from the Lead Applicant in each of its last 3 financial years will be required. Alternatively, a minimum turnover of €550,000 per annum from the Lead Applicant in each of its last 3 financial years will be required. (Note: The RFI text presents two distinct minimum turnover figures; bidders should clarify which is applicable).
- Insurance: Not specified for this RFI stage, but the RFT will contain detailed requirements. Previous tenders by daa plc have included €13 million for Employers' Liability and €13 million for Public & Product Liability. Insurance must be placed with reputable insurers with a minimum of BBB+ or similar rating, approved by daa.
- Certifications: Not specified for this RFI stage. However, the Contracting Authority implements ISO 50001 (Energy Management System) and supports an ISO 55001 asset-management framework.
- Past experience: Not specified for this RFI stage.
- Personnel: Not specified for this RFI stage. An organisational chart indicating roles is required in the RFI Questionnaire.
- Geographic / facility constraints: Not specified for this RFI stage.
Applicants are permitted to rely on the resources of others to meet these minimum requirements.
5. Award criteria & scoring
The RFI evaluation focuses on the capacity of the Applicant to perform the contract. Shortlisting will be based on Eligibility Requirements (Step One), Minimum Requirements (Step Two), and Assessment Criteria (Step Three). The Assessment Criteria will be detailed in the RFT. The RFI process involves evaluation of submissions only, with no presentations. A potential e-Auction may be used in the final RFT stage.
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| Eligibility Requirements | N/A | Defined in Section 7.5 | Pass/Fail |
| Minimum Requirements | N/A | Defined in Section 7.6 | Pass/Fail |
| Assessment Criteria | To be defined in RFT | To be defined in RFT | Minimum mark specified in RFT |
The RFI process aims to shortlist between 2-5 applicants for the RFT stage.
6. Submission requirements
Responses to the RFI Questionnaire must be submitted through the e-tenders website only.
- Method statement / response document: The RFI Questionnaire must be completed in full, responding to each element in the specified order and format. Responses should be A4 format and comply with page limits set out in the RFI Questionnaire. File/folder titles should not include "&" and should be less than 240 characters.
- CVs: Not specified for this RFI stage.
- Pricing schedule: Not specified for this RFI stage.
- Case studies: Not specified for this RFI stage.
- Declarations: Applicants must provide an organisational chart, clearly indicating the role of each member and confirming the Lead Applicant. Tax Clearance Certificate and confirmation of insurance compliance will be required at contract award.
- Mandatory site visit: Not specified for this RFI stage. Site visits are listed as TBC for the RFT stage and are not mandatory.
- Submission portal: eTenders website (www.etenders.gov.ie). Responses must be uploaded by the deadline.
7. Key dates & process
| Milestone | Date |
|---|---|
| RFI issue | 23/07/2026 |
| Latest date for Tenderers to submit Clarifications | 31/07/2026 |
| Latest date for the Contracting Authority to issue responses to Tenderer Clarifications | 11/08/2026 |
| RFI Latest date for the Receipt of Tenders from Tenderers | 30/08/2026 at 14:00 |
| Shortlisting notification letters to successful Applicants | 16/09/2026 |
| RFT issue | 23/09/2026 |
| Latest date for Tenderers to submit Clarifications | 28/09/2026 |
| Latest date for the Contracting Authority to issue responses to Tenderer Clarifications | 30/09/2026 |
| RFT Latest date for the Receipt of Tenders from Tenderers | 28/10/2026 at 14:00 |
| Issue of Regret Letters to unsuccessful Tenderers | December 2026 |
| Contract Award Letter to successful Tenderer | December 2026 |
| Contract commencement | December 2026 |
These dates are indicative and subject to change.
8. Contract terms that matter
The RFI outlines potential contract terms, with full details to be provided in the RFT.
- Term + extension structure: Not specified for this RFI stage.
- Payment terms: Not specified for this RFI stage.
- Key SLAs/KPIs: On-time and in-full delivery, lead times, helpdesk responsiveness, product quality, customer satisfaction, continuous improvement initiatives, reporting accuracy and timeliness. Failure to meet KPIs may result in suspension or termination.
- Liquidated damages or penalty regimes: Not specified for this RFI stage.
- Termination clauses: May result from failure to meet KPIs or other contractual breaches.
- IP ownership: Not specified for this RFI stage.
- Sub-contracting rules: Where a group/consortium is successful, members may act as sub-contractors. The Lead Applicant is anticipated to be liable for full performance.
- Parent-company guarantee or bond requirements: Not specified for this RFI stage, but reliance on parent company resources may require guarantees or other contractual mechanisms.
The successful tenderer will be required to comply with all applicable data protection laws, including GDPR and the Data Protection Act 2018. Relevant Contractors Tax (RCT) and Professional Services Withholding Tax (PSWT) apply. The Acquired Rights Directive (SI 131/2003) may apply to staff of the incumbent operator.
9. Risks, red flags & unusuals
- Dual Turnover Requirements: The RFI presents two distinct minimum annual turnover figures (€300,000 and €550,000). Bidders must seek clarification on which figure is the definitive requirement.
- RFI as a Prequalification Step: This is an RFI stage, not a full tender. Applicants must successfully navigate this RFI to be invited to the RFT stage, where the main evaluation and award will occur.
- Potential e-Auction: The RFT stage may involve an electronic reverse auction, which can significantly impact pricing strategies.
- Customs Clearance Mandate: The client has appointed a specific supplier for customs clearance for goods from outside the EU. This supplier must be used, and no other supplier will be accepted for this service.
- Indicative Dates: All dates provided are indicative and subject to change by the Contracting Authority.
10. SME fit assessment
This tender is structured as an RFI followed by an RFT, designed to shortlist 2-5 suppliers.
- Who can credibly bid: Small to medium-sized enterprises (SMEs) with a demonstrable track record in supplying electrical stock and non-stock items, particularly within airport or large-scale logistics environments, could be suitable. A strong understanding of inventory management, logistics, and the ability to meet stringent SLA requirements are crucial. The turnover requirements (€300k or €550k minimum annual turnover) suggest that very small businesses may struggle to meet the financial robustness criteria unless they form a consortium or rely on parent company resources.
- Consortium/sub-contracting: Consortium applications are explicitly permitted. This allows SMEs to combine resources and expertise to meet the requirements. Reliance on the resources of other entities (e.g., parent companies) is also allowed, provided it can be contractually secured.
- Indicative bid-prep effort: Preparing a comprehensive RFI response requires significant effort, including gathering financial data, detailing operational processes, and articulating capabilities. For an SME, this could range from 5-15 days of dedicated effort, depending on existing documentation and internal resources.
- Pwin signal: The tender is at an early RFI stage, making it difficult to assess incumbent strength or specific past winners. The potential use of an e-Auction in the RFT stage suggests price will be a significant factor in the final award. The requirement for specific systems integration (Maximo 7.6/Oracle ERP) and the focus on ISO 55001 asset management may favour suppliers with established ERP integration capabilities and asset management experience.
11. Where to dig deeper
- Source RFT filename: [LOT1 P20907.01 Vol1 Electrical stock.docx]
- eTenders CFT ID: Not specified in the provided text.
- Contact email or clarification portal: eTenders messaging facility (www.etenders.gov.ie).
- Most important attachments:
- RFI Questionnaire (referenced throughout)
- Part 15: Definition of Terms
- Section 7: Procurement Procedure (for key dates and evaluation steps)
Can you bid?
Required certifications
- ISO 50001
- ISO 55001
Minimum turnover
€300,000
Public liability insurance
€13,000,000
Named standards / methodologies
Scoring
Lowest Price
Lots (1)
Documents (5)
LOT1 P20907.01 Vol1 Electrical stock.docx
133.6 KB
LOT1 P20907.01 Vol2 Electrical stock.docx
170.0 KB
LOT2 P20907.02 Vol1 Consumables stock.docx
134.3 KB
LOT2 P20907.02 Vol2 Consumables stock.docx
170.2 KB
P20907 Supply of Electrical and Consumables and stock items at Dublin airport.zip
608.9 KB
Original notice text
P20907 Consumables and electrical stock and non-stock items for Dublin airport. The full range of items to be quoted will be detailed at the RFT stage. However, to provide an indication of the types of products included within the scope, please see some examples below. Electrical stock and non-stock items: Lockout/Tagout (LOTO) kits UPS units and power supplies Electrical cables and connectors (e.g. WAGO connectors, SWA cable) Lighting products (LED fittings, floodlights, lamps, downlights) Fire alarm equipment (smoke detectors, call points, sounders, beacons) Sensors and photoelectric cells Circuit breakers, RCBOs, RCCBs and contactors Sockets, switches and spur units Emergency lighting equipment Industrial control and automation components (relays, timers, power supplies, proximity sensors, inverter drives) Batteries and chargers CCTV and security equipment Electrical installation accessories (glands, conduit, trunking, terminals, cable ties, etc.) Consumables stock and non-stock items Adhesives, sealants and silicones Tapes (electrical, masking, hazard, Denso, PTFE, etc.) Batteries (AA, AAA, coin cell, rechargeable) PPE items (gloves, masks, visors, overalls) Cleaning products, wipes, disinfectants and lubricants Paints, primers and rollers Fasteners (nuts, bolts, screws, washers, anchors) Hand tools and consumables (drill bits, cutting discs, blades, sanding materials) Building materials (plywood, MDF, Perspex, cement, mortar, gravel, sand) Locks, hinges, door hardware and access control consumables Cable ties, ropes, chains and fixings Welding consumables and associated accessories The above is intended as a representative sample only and the complete item schedules and requirements will be made available during the RFT stage.
AI analysis updated 2 weeks, 5 days ago
Deadline
30 Aug
Buyer
daa plcLocation
Dublin Airport
Procedure
Negotiated
Clarification
31 Jul 2026
eTenders ID
8624946
Ask AI
Knows this tender's documents