Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Construction of a new Hospital Entrance at the National Orthopaedic Hospital Cappagh
Closed Construction & Civil Engineering Works SME Suitable Open

Construction of a new Hospital Entrance at the National Orthopaedic Hospital Cappagh

Deadline

28 Aug

Construction of a new hospital entrance at National Orthopaedic Hospital Cappagh, involving installation of new windows, doors, and a rooflight, with a 90-day contract duration.

SME fit: Medium Bid effort: Medium 📍 Dublin

Construction of new hospital entrance including window and door installation at National Orthopaedic Hospital Cappagh

Bidder profile

Firms with proven experience in healthcare construction, specifically in building envelope works like window and door installation, and capable of managing a short, intensive project.

Risks & flags

  • Conflicting turnover requirements
  • Mandatory site visit close to deadline
  • Potential asbestos presence requires strict H&S
  • Short 90-day contract duration

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer National Orthopaedic Hospital Cappagh
Title Construction of a new Hospital Entrance at the National Orthopaedic Hospital Cappagh
CPV / category Not specified for this tender
Estimated value Not disclosed
Per-year (if multi-year) Not specified for this tender
Procedure type Not specified for this tender
Lots Not specified for this tender
Location Cappagh Road, Dublin 11
Contract length 90 days
Submission deadline 2026-08-28T11:00:00+00:00
Go-live / start Not specified for this tender

2. Scope of Work

This tender seeks a contractor for the construction of a new hospital entrance at the National Orthopaedic Hospital Cappagh. The project involves the installation of new windows and external doors, and potentially associated works. The contract duration is specified as 90 days.

Key activities and components include:

  • Window and Door Installation:
  • Installation of new double-glazed uPVC sliding sash window sets to match existing office and back-office areas.
  • Installation of new double-glazed uPVC window sets to the main entrance and waiting area external walls, matching the size and break-up of existing windows.
  • Installation of a walk-on flat glass rooflight (Roofglaze Skyway or equal approved) with a thermally broken aluminium frame, double-glazed, non-fragile, and designed to specific loading requirements (minimum 1.5 kN/m² UDL and 2.0 kN concentrated load).
  • All uPVC and aluminium window systems must be thermally broken, powder-coated, and achieve specific U-values (maximum 1.6 W/m²K), g-values (0.4), and light transmittance (0.71).
  • Weather performance requirements include air permeability (600pa), water tightness (600pa), and wind resistance (1/175 deflection).
  • Manifestations on glazed screens and doors must comply with TGD Part M.
  • Trickle vents are required for each window to achieve 700mm²/m² floor area.
  • Restrictors are required for openings below 1800mm above finished floor level to limit openings to 100mm.
  • Telescopic remote window opening devices are required for high-level opening windows.
  • Materials and Standards:
  • uPVC window systems to be equal to VELFAC V200 for aluminium systems.
  • Weatherstrips to be EPDM to BS4255-1.
  • Fasteners to be stainless steel, grade A4 to I.S. EN ISO 3506-1.
  • Glazing to comply with barrier loadings as described in Building Regulations, TGD Part K & BS 6180.
  • All cills, flashings, insulated panels, and corner posts to be supplied by the window manufacturer in an approved RAL colour.
  • Site Considerations:
  • The tender documents include asbestos air monitoring certificates for various areas within the hospital, including the boiler room and theatre roof, indicating potential prior or concurrent works requiring strict environmental controls. These reports detail background air tests, leak tests, and clearance indicator tests, all showing satisfactory results (<0.01 f/ml).
  • The contract duration is 90 days from the contract start date.

3. Background & buyer context

The National Orthopaedic Hospital Cappagh is procuring the construction of a new hospital entrance. The tender documents indicate that the hospital has undertaken various works, including asbestos removal and environmental cleaning in specific areas such as the boiler room and theatre roof, as evidenced by multiple air monitoring certificates dated between August and November 2020. These reports confirm satisfactory air quality following remedial works, suggesting a focus on health and safety compliance within the hospital environment. The project appears to be a standalone capital works initiative to upgrade or replace existing entrance facilities.

4. Eligibility & selection criteria

Bidders must meet the following minimum requirements to be considered compliant:

  • Turnover requirement:
  • An average annual turnover of not less than €3,000,000, calculated over the last three financial years.
  • One document also states a requirement for a certified average annual turnover of not less than €4,000,000 over the last three financial years.
  • Insurance:
  • Employer's Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event.
  • Public Liability Insurance: Maximum excess of €6,500.
  • Employer's Liability Insurance: Maximum excess of €6,500.
  • Insurance of the Works and goods and materials for the Works: Maximum excess of €20,000.
  • Certifications: Not specified for this tender.
  • Past experience:
  • Demonstrate successful completion and handover of a minimum of 3 projects of a similar nature and complexity.
  • Projects must have been carried out in a Health Care Setting.
  • Projects must have been completed within the past 5 years.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Not specified for this tender.

Submissions not meeting these minimum requirements will be deemed non-compliant.

5. Award criteria & scoring

The award criteria and scoring mechanism are not detailed in the provided extract. However, the tender documents mention a "Satisfactory – meets minimum requirements" threshold for certain aspects, indicating a pass/fail element for essential criteria. The typical award split for public sector construction tenders in Ireland is a combination of quality and price, often weighted towards quality.

Criterion Weight (%) Sub-criteria Pass/Fail Thresholds
Not specified Not specified Not specified Not specified

6. Submission requirements

Bidders are required to submit the following:

  • Method statement / response document: Not specified for this tender.
  • CVs: Not specified for this tender.
  • Pricing schedule: Not specified for this tender.
  • Case studies: Not specified for this tender.
  • Declarations:
  • Tax Clearance Access Number and Tax Reference Number for online verification.
  • Bona Fides declarations.
  • Conflict of Interest declarations.
  • Mandatory site visit:
  • Attendance is mandatory for all tenderers.
  • Date: Wednesday, 12/08/2026 at 12:00 pm.
  • Meeting point: Hospital main reception.
  • Intention to attend must be notified via eTenders, including names and positions of attendees.
  • Submission portal: Tenders must be submitted via eTenders. Specific format rules are not detailed here but are expected within the full tender pack.

7. Key dates & process

Event Date Time
RFT issued 30/07/2026 Not stated
Clarification deadline 21/08/2026 Not stated
Mandatory site visit 12/08/2026 12:00 pm
Tender deadline 28/08/2026 11:00 am
Expected award Not specified Not stated
Contract start Not specified Not stated
Go-live / mobilisation Not specified Not stated

8. Contract terms that matter

  • Contract length: 90 days from the contract start date.
  • Payment terms: Not specified for this tender.
  • Key SLAs/KPIs: Not specified for this tender.
  • Liquidated damages or penalty regimes: Not specified for this tender.
  • Termination clauses: Not specified for this tender.
  • IP ownership: Not specified for this tender.
  • Sub-contracting rules: Not specified for this tender.
  • Parent-company guarantee or bond requirements: Not specified for this tender.

9. Risks, red flags & unusuals

  • Conflicting Turnover Requirements: The tender documents present two different minimum average annual turnover figures: €3,000,000 and €4,000,000. Bidders must clarify which figure is binding.
  • Mandatory Site Visit: The site visit is mandatory, scheduled for 12/08/2026, which is relatively close to the tender submission deadline of 28/08/2026. Failure to attend disqualifies a bidder.
  • Asbestos Presence: While the provided asbestos reports indicate satisfactory clearance, the presence of asbestos in the hospital environment suggests that any works must be conducted with extreme caution and adherence to strict health and safety protocols, potentially impacting site access and scheduling.
  • Short Contract Duration: A 90-day contract duration for construction works, including window and door installation, is relatively short and may require efficient project management and resource allocation.

10. SME fit assessment

This tender is likely suitable for small to medium-sized enterprises (SMEs) with demonstrable experience in healthcare construction.

  • Who can credibly bid: A firm with a proven track record in constructing or refurbishing building envelopes, specifically within healthcare or similar sensitive environments, would be well-positioned. The requirement for 3 similar projects in a healthcare setting within the last 5 years suggests a need for specialized experience rather than general construction.
  • Consortium or sub-contracting: The tender documents do not explicitly prohibit consortia or sub-contracting. However, the requirement for the main contractor to have managed at least 3 similar projects implies that the lead entity must possess the core experience.
  • Indicative bid-prep effort: Bid preparation would likely require 5-10 days, focusing on compiling evidence of past performance in healthcare settings, detailing the proposed approach to window and door installation, and ensuring compliance with all mandatory requirements, especially the site visit.
  • Pwin signal: The presence of specific technical specifications for windows and doors, alongside the mandatory site visit and experience requirements, suggests a competitive tender. The conflicting turnover figures could be a point of confusion or a potential barrier if not clarified. The incumbent's identity is not disclosed.

11. Where to dig deeper

  • Source RFT filename(s): Invitation to Tender - Site Visit.docx
  • eTenders CFT ID: Not specified for this tender
  • Contact email or clarification portal: Clarifications should be submitted via eTenders.
  • Most important attachments:
  • [2511 TEN 012 - Window & External Doors Schedule Sheet 2 of 2.pdf]
  • [Appendix A boiler room HS File.pdf] (Contains asbestos reports, relevant for site context and H&S)
  • [Appendix D Supporting Document.zip]

Can you bid?

Minimum turnover

€3,000,000

Named standards / methodologies

BS4255-1EN ISO 3506-1BS 6180TGD Part MTGD Part K

Documents (128)

PDF

02 Mechanical Services Specification.pdf

1.9 MB · Specification

PDF

3300-E-SP-01 General Electrical Specification.pdf

7.2 MB · Specification

PDF

3300-E-SP-02 Electrical Specification.pdf

1.2 MB · Specification

ZIP

Appendix A Works Requirements.zip

42.8 MB · Specification

PDF

New_Entrance_to_the_National_Orthopaedic_Hospital_Specification.pdf

1.8 MB · Specification

DOCX

Invitation to Tender - Site Visit.docx

947.4 KB · RFT / Invitation to Tender

PDF

03 Electrical Services Pricing Schedule.pdf

469.5 KB · Pricing / BOQ / Schedule of Rates

PDF

03 Mechanical Services Pricing Schedule.pdf

280.8 KB · Pricing / BOQ / Schedule of Rates

ZIP

Appendix C Pricing Document.zip

116.4 KB · Pricing / BOQ / Schedule of Rates

DOC

2026-07-27 New Entrance Declaration of Suitability for Contractors for Small Works.doc

47.5 KB · Contract / Agreement / Terms

PDF

Volume D 07. PW-CF6-v1.13-29-07-2021 Conditions of Contract.pdf

434.3 KB · Contract / Agreement / Terms

DOCX

2026-07-27 A2-PW-CF6_Rates_of_Pay_and_Conditions_of_Employment_Certificate.docx

22.4 KB · Form / Declaration / Certificate

ZIP

Appendix B Form of Tender.zip

1.0 MB · Form / Declaration / Certificate

DOCX

MF_2.6 - H&S Compliance Declaration by PSCS.docx

23.1 KB · Form / Declaration / Certificate

PDF

2511 - NOHC Entrance Tender Drawing Register_2026.07.14.pdf

219.0 KB · Drawing / Plan / Layout

PDF

2511 TEN 001 - Site Layout Plan.pdf

339.0 KB · Drawing / Plan / Layout

PDF

2511 TEN 003 - Proposed Ground Floor Plan.pdf

674.0 KB · Drawing / Plan / Layout

PDF

2511 TEN 005 - Proposed Main Elevation.pdf

534.5 KB · Drawing / Plan / Layout

PDF

2511 TEN 006 - Proposed Elevations.pdf

492.9 KB · Drawing / Plan / Layout

PDF

2511 TEN 010 - Landscape Site Plan_Rev D.pdf

576.6 KB · Drawing / Plan / Layout

PDF

Drawing Issue Sheet.pdf

50.0 KB · Drawing / Plan / Layout

PDF

01 Mechanical Services Equipment Schedule.pdf

1.0 MB

PDF

2024-03-19 NOHC Management Asbestos Survey Update.pdf

12.5 MB

DOCX

2026-07-28 Works Requirement Brief - Conservatory Entrance.docx

3.2 MB

PDF

2511 Sanitary Ware Schedule.pdf

230.4 KB

PDF

2511 TEN 002 - Demolition Plan.pdf

1.6 MB

PDF

2511 TEN 004 - Proposed Roof Plan.pdf

396.3 KB

PDF

2511 TEN 007 - Proposed Section.pdf

174.8 KB

PDF

2511 TEN 008 - Phasing Plan_Rev F.pdf

658.1 KB

PDF

2511 TEN 009 - Site Access & Builders Compound.pdf

617.6 KB

PDF

2511 TEN 011 - Window & External Doors Schedule Sheet 1 of 2.pdf

95.6 KB · Appendix / Annex

PDF

2511 TEN 012 - Window & External Doors Schedule Sheet 2 of 2.pdf

96.5 KB · Appendix / Annex

PDF

2511 TEN 013 - Temporary External Door Schedule.pdf

74.0 KB

PDF

2511 TEN 015 - Door Schedule.pdf

513.9 KB

PDF

2511 TEN 016 - Door Details.pdf

191.5 KB

PDF

2511 TEN 020 - Ground Floor RCP.pdf

209.8 KB

PDF

2511 TEN 025 - Ground Floor Finishes.pdf

816.3 KB

PDF

2511 TEN 030 - Partition Types Details.pdf

169.0 KB

PDF

2511 TEN 031 - Partition Types Corner Details.pdf

173.6 KB

PDF

2511 TEN 035 - Fire Stopping Sheet 1.pdf

600.0 KB

PDF

2511 TEN 036 - Fire Stopping Sheet 2.pdf

281.1 KB

PDF

2511 TEN 037 - Fire Stopping Sheet 3.pdf

548.1 KB

PDF

2511 TEN 038 - Fire Stopping Sheet 4.pdf

1015.8 KB

PDF

2511 TEN 040 - Construction Details Sheet 1.pdf

198.7 KB

PDF

2511 TEN 041 - Construction Details Sheet 2.pdf

112.9 KB

PDF

2511 TEN 042 - Window Details.pdf

151.9 KB

PDF

2511 TEN 043 - Portico Details.pdf

438.4 KB

PDF

2511 TEN 044 - Airtightness Line.pdf

158.2 KB

PDF

2511 TEN 045 - Toilet Details Sheet 01.pdf

574.1 KB

PDF

2511 TEN 050 - Furniture Package 01 - Reception Desk.pdf

497.2 KB

PDF

2511 TEN 051 - Furniture Package 02 - Typical Furniture Sheet.pdf

81.2 KB

PDF

2511 TEN 052 - Furniture Package 03 - Waiting Area Seating.pdf

218.7 KB

PDF

2511 TEN 060 - RDS - Office 1.pdf

356.6 KB

PDF

2511 TEN 061 - RDS - Office 2.pdf

438.4 KB

PDF

26090-PSDP-01-PrelimPlan__Rev_02_June2026.pdf

5.8 MB

PDF

3300 - Designers Risk Assessment.pdf

1.1 MB

PDF

3300 - M&E Services Builders Work.pdf

147.1 KB

PDF

3300-BW-100.pdf

450.4 KB

PDF

3300-BW-101.pdf

513.0 KB

PDF

3300-E-100.pdf

850.6 KB

PDF

3300-E-200.pdf

2.0 MB

PDF

3300-E-201.pdf

463.4 KB

PDF

3300-E-300.pdf

454.8 KB

PDF

3300-E-400.pdf

443.1 KB

PDF

3300-E-500.pdf

564.5 KB

PDF

3300-M-100.pdf

510.2 KB

PDF

3300-M-200.pdf

507.8 KB

PDF

3300-M-300.pdf

474.0 KB

PDF

989-91-- G16C .pdf

348.5 KB

PDF

989-91-- G11E .pdf

497.7 KB

PDF

989-91-- G13C .pdf

345.6 KB

PDF

989-91-- G14C .pdf

371.0 KB

PDF

989-91-- G17B .pdf

287.5 KB

PDF

989-91-- C10B Extg.pdf

513.3 KB

PDF

989-91-- C20C.pdf

827.1 KB

PDF

989-91--- G15C.pdf

359.9 KB

PDF

989-91--- G12D Rf.pdf

327.0 KB

PDF

989-91--- G18B .pdf

270.7 KB

PDF

989-91---G10E .pdf

315.0 KB

PDF

989-91-C15C-A1.pdf

823.2 KB

PDF

989-91-C22 A1.pdf

326.7 KB

PDF

Air cert_Cappagh Hospital_280920.pdf

369.6 KB

PDF

Air cert_Cappagh Hospital_Boiler room_131120_.pdf

288.2 KB

PDF

Air cert_Cappagh Hospital_Boiler_room_131120 (1).pdf

288.7 KB

PDF

Air cert_Cappagh Hospital_Boiler_room_131120.pdf

290.1 KB

PDF

Air cert_Leak Test_Cappagh Hospital_111019 (1).pdf

811.6 KB

PDF

Appendix A boiler room HS File.pdf

2.2 MB · Appendix / Annex

ZIP

Appendix D Supporting Document.zip

6.0 MB · Appendix / Annex

PDF

Cappagh Hospital Convent RDAS_130517.pdf

2.9 MB

PDF

Cappagh Management Asbestos Survey Update_2024.pdf

13.3 MB

PDF

Cappagh Operating Theatre_RDAS_060715.pdf

567.4 KB

PDF

Cappagh_Hospital_Air Cert_060919 (1).pdf

373.6 KB

PDF

Cappagh_Main Boiler Room_ Clearance Test_101120.pdf

76.5 KB

PDF

Cappagh_Main Boiler_Room_ Clearance Test_280920 (1).pdf

196.7 KB

PDF

Cappagh_Main Boiler_Room_ Clearance Test_280920 (2).pdf

196.7 KB

PDF

Cappagh_Main Boiler_Room_ Clearance Test_280920.pdf

198.0 KB

PDF

Cappagh_Paediatric_P2_Basement Plan 257E.pdf

503.8 KB

PDF

Document Issue Sheet.pdf

45.8 KB

DOCX

FTS-6_v1.7_06-11-2025 Entrance (29.07.26).docx

61.4 KB

PDF

Health and Safety File - Cappagh Boiler Room.pdf

11.0 MB

PDF

IES_Air Cert_Cappagh Hosp_Boiler room_021120.pdf

56.0 KB

PDF

IES_Air Cert_Cappagh Hosp_Boiler room_121020.pdf

178.2 KB

PDF

IES_Air Cert_Cappagh Hosp_convent QA offices_100721.pdf

66.1 KB

ZIP

Information Pack.zip

84.6 MB

DOCX

ITTW4_Open_Procedure_Short_Form_v2 (002).docx

63.7 KB

PDF

Laboratory Building Toilet Project_220322.pdf

332.5 KB

PDF

NEW A+E Roof CfR_111019.pdf

94.8 KB

PDF

New_Entrance_to_the_National_Orthopaedic_Hospital_Preliminaries.pdf

776.9 KB

PDF

NOHC Main Entrance Works Drg Issue Reg Civil July2026 989-91 _.pdf

356.5 KB

PDF

NOHC Main Entrance Works Drg Issue Reg Str July2026 989-91 _.pdf

360.9 KB

PDF

NOHC_Laboratory Upgrade Asbestos Report_080223.pdf

696.5 KB

PDF

NOHC_Old Convent Bld_RDAS_190321.pdf

839.6 KB

PDF

NOHC_Operating Theatre Waiting Areas Upgrade Report_080223.pdf

512.9 KB

PDF

NOHC_Theatres 3-4 Upgrade Report_181022.pdf

419.1 KB

OTHER

plot.log

486 bytes

PDF

PoN_Cappagh_Convent Refurbishment Project_190919.pdf

786.6 KB

PDF

PoN_Cappagh_New Paediatric Dept_200420.pdf

1.6 MB

PDF

RDAS_Cappagh Hospital Convent 080517.pdf

2.7 MB

PDF

Room 12 3rd floor WC refurb_220322.pdf

282.8 KB

PDF

X-Ref L00-Model.pdf

3.3 MB

PDF

X-Ref L01-Model.pdf

2.1 MB

PDF

Zone 1 - MRI and XRay files and reports.pdf

8.6 MB

PDF

Zone 1 Appendices.pdf

9.9 MB

PDF

Zone 2 Appendices.pdf

1.8 MB

PDF

Zone 4_Convent Air Tests.pdf

6.2 MB

DOCX

~$24-09-06 Project Brief - OPD & Laboratory Building Phase 2.docx

162 bytes

DOCX

~$TW4_Open_Procedure_Short_Form_v2 (002).docx

162 bytes

DOCX

~$vitation to Tender - Site Visit.docx

162 bytes

Original notice text

Construction of a new Hospital Main Entrance at the National Orthopaedic Hospital Cappagh

AI analysis updated 3 weeks ago

Bid ↗
Details

Deadline

28 Aug

View on eTenders ↗

Location

Cappagh Road, Dublin 11

Procedure

Open

Clarification

21 Aug 2026

eTenders ID

8754459

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender