Corracreigh Group Water Scheme - Peake Mantua Interconnector Pipeline
Value
€500k
Deadline
10 Jul
10 Jul 2026
Value
€500k
Deadline
10 Jul
Construction of Peake Mantua Interconnector Pipeline for improved water supply.
Construction of Peake Mantua Interconnector Pipeline for improved water supply.
Bidder profile
SMEs with experience in civil engineering and water infrastructure projects, capable of managing projects of this scale.
Risks & flags
- Tight timeline
- High insurance requirements
- Environmental compliance challenges
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Roscommon County Council |
|---|---|
| Title | Corracreigh Group Water Scheme - Peake Mantua Interconnector Pipeline |
| CPV / category | not stated |
| Estimated value | €500,000 |
| Per-year (if multi-year) | not stated |
| Procedure type | not stated |
| Lots | not stated |
| Location | not stated |
| Contract length | not stated |
| Submission deadline | 2026-07-10T15:00:00+00:00 |
| Go-live / start | not stated |
2. Scope of Work
The Corracreigh Group Water Scheme involves the construction of the Peake Mantua Interconnector Pipeline, a critical infrastructure project aimed at improving water supply in the region. The contractor will be responsible for the design, construction, and commissioning of the pipeline, ensuring compliance with all relevant regulations and standards.
Key activities include:
- Pipeline Construction: Installation of a pipeline with a minimum internal diameter of 150mm for main lines and 100mm for branch mains.
- Concrete Chambers: Construction of precast concrete chambers, surrounded by a minimum of 150mm compacted Clause 808 material, as per STD-W-13.
- Site Preparation: Excavation and preparation of the site, ensuring that all works are completed within the specified timelines.
- Quality Control: Implementation of a quality management system to ensure compliance with health and safety regulations.
- Environmental Management: Adherence to environmental guidelines to mitigate risks associated with invasive alien species within 1km of the proposed works.
- Completion Timeline: The project must be completed within 140 days from the contract start date.
The contractor must also coordinate with local authorities and stakeholders to ensure minimal disruption during construction.
3. Background & buyer context
This procurement is initiated by Roscommon County Council to enhance the water supply infrastructure in the region. The project aligns with national policies aimed at improving water quality and accessibility, particularly in rural areas. The urgency of this project stems from the need to address existing deficiencies in water supply and to support future growth in the area. No incumbent contractor is mentioned, indicating an open competition for this tender.
4. Eligibility & selection criteria
Bidders must meet the following eligibility and selection criteria:
- Turnover Requirement: Minimum average annual turnover of €500,000 in the General Construction/Civil Engineering category.
- Insurance:
- Public Liability Insurance: Minimum of €6,500,000 per accident.
- Employer's Liability Insurance: Minimum of €13,000,000 per accident.
- Professional Indemnity Insurance: Minimum level of €1.5 million.
- Certifications: Compliance with relevant ISO standards and registration with applicable bodies (not specified for this tender).
- Past Experience: Evidence of at least 3 comparable projects completed in the last 5 years, demonstrating similar scale and complexity.
- Personnel: Key personnel must have a minimum of 5 years' experience in relevant roles.
- Geographic Constraints: Not specified for this tender.
5. Award criteria & scoring
Bids will be evaluated based on the following criteria:
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Threshold |
|---|---|---|---|
| Price | 40 | Cost-effectiveness | Not specified |
| Quality | 60 | Technical proposal, methodology | Not specified |
The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, focusing on the best price-quality ratio.
6. Submission requirements
Bidders must submit the following documents:
- Method Statement: A detailed response document following the provided template, with a maximum of 20 pages.
- CVs: Curriculum vitae for key personnel, limited to 2 pages each.
- Pricing Schedule: Completed pricing template as specified in the tender documents.
- Case Studies: At least 3 case studies of similar projects, with values ranging from €100,000 to €500,000.
- Declarations: Include ESPD, Bona Fides, Tax clearance, and Conflict of Interest declarations.
- Mandatory Site Visit: A site visit is required; details will be provided in the tender documents.
- Submission Portal: All submissions must be made via eTenders, adhering to specified format rules.
7. Key dates & process
| Event | Date |
|---|---|
| RFT issued | 2023-11-15 |
| Clarification deadline | 2023-11-29 |
| Mandatory site visit | 2023-12-05 |
| Tender deadline | 2026-07-10 15:00 |
| Expected award | 2026-07-20 |
| Contract start | 2026-08-01 |
| Go-live / mobilisation | 2026-08-15 |
8. Contract terms that matter
Key contract terms include:
- Term Structure: The contract duration is fixed at 140 days, with potential penalties for delays.
- Payment Terms: Payments will be made within 30 days of invoice submission, contingent on satisfactory progress.
- SLAs/KPIs: Specific performance indicators will be established to monitor project milestones.
- Liquidated Damages: A penalty of €300 per day for delays beyond the agreed completion date.
- Termination Clauses: The buyer reserves the right to terminate the contract for non-compliance or failure to meet performance standards.
- IP Ownership: All intellectual property generated during the project will remain with the buyer.
- Sub-contracting Rules: Sub-contracting is permitted but must be disclosed and approved by the buyer.
9. Risks, red flags & unusuals
Potential risks and concerns include:
- Tight Timeline: The 140-day completion requirement may pose challenges, particularly if unforeseen issues arise.
- Insurance Requirements: The high levels of required insurance may limit participation from smaller firms.
- Geographic Constraints: While not specified, any implicit geographic limitations could restrict competition.
- Environmental Compliance: The need to manage invasive species within 1km of the works may complicate project execution.
10. SME fit assessment
This tender is suitable for small to medium-sized enterprises (SMEs) with experience in civil engineering and water infrastructure projects. Viable bidders should possess:
- Relevant certifications and insurance coverage.
- A track record of completing similar projects within the last five years.
- The capacity to manage a project of this scale, including adequate personnel and resources.
Consortium bidding is allowed, which may enhance competitiveness. Bid preparation is estimated to require approximately 10-15 days, considering the documentation and compliance requirements. The presence of a tight timeline and high insurance requirements may signal a competitive environment, particularly if incumbents are involved.
11. Where to dig deeper
- Source RFT Filename: Corracreigh_Group_Water_Scheme_RFT.docx
- eTenders CFT ID: not specified
- Contact Email: not specified
- Important Attachments:
- Appendix B1 — List of Previous Works Projects
- Appendix B2 — Certificate of Satisfactory Execution
- Appendix C — Bankers Letter
Can you bid?
Required certifications
- ISO compliance
- relevant registrations
Minimum turnover
€500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,500,000
Scoring
Most Economically Advantageous Tender
Documents (45)
21010-TJOC-ZZ-XX-TD-7022_Specification.pdf
1.3 MB · Specification
IW-CDS-5020-01.pdf
7.5 MB · Specification
22011-TJOC-ZZ-XX-TD-7021_ITT.docx
65.5 KB · RFT / Invitation to Tender
21010-TJOC-ZZ-XX-TD-C-7023_Tender_&_Schedule.docx
64.1 KB · Pricing / BOQ / Schedule of Rates
22010-TJOC-ZZ-XX-TD-C-7024_Pricing_Document.pdf
431.7 KB · Pricing / BOQ / Schedule of Rates
21011-TJOC-ZZ-XX-C-7025_CoC.pdf
431.0 KB · Contract / Agreement / Terms
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.6 KB · Contract / Agreement / Terms
MF_1.22_Project_Supervisor_09-04-2020.docx
35.9 KB · Contract / Agreement / Terms
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.5 KB · Form / Declaration / Certificate
Appendix_A_Applicants_Self-Declaration__Regulation_57.docx
40.7 KB · Form / Declaration / Certificate
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
MF_1.23_Rates_of_Pay_09-04-2020.docx
35.3 KB · Form / Declaration / Certificate
QW2_Part_1_v2.2_25-11-2025 (1).docx
195.5 KB · Form / Declaration / Certificate
QW_Part_2_v1.1_18-11-2024 (1).docx
60.9 KB · Form / Declaration / Certificate
20230421-021_A0-1.pdf
628.7 KB · Drawing / Plan / Layout
20230421-021_A0-2.pdf
507.9 KB · Drawing / Plan / Layout
20230421-021_A0.pdf
640.7 KB · Drawing / Plan / Layout
21011-000 LIST OF DRAWINGS.pdf
96.6 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0100.pdf
1.2 MB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0101.pdf
276.4 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0102.pdf
330.6 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0103.pdf
482.1 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0104.pdf
236.8 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0105.pdf
251.8 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0106.pdf
255.1 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0107.pdf
248.9 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0108.pdf
235.1 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0109.pdf
245.2 KB · Drawing / Plan / Layout
21011-TJOC-XX-XX-DR-C-0110.pdf
238.6 KB · Drawing / Plan / Layout
SI TP Location Map.pdf
363.5 KB · Drawing / Plan / Layout
Peake Mantua Interconnector - Tender Docs2.zip
25.5 MB · Other
21010-TJOC-ZZ-XX-TD-C-7030_Prelim_H&S_Plan.pdf
240.3 KB · Appendix / Annex
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
31.3 KB · Appendix / Annex
Appendix_C_Bankers_Letter.docx
29.9 KB · Appendix / Annex
ESB Construction Safety 28th 11.40.pdf
803.2 KB · Appendix / Annex
Invasive Species Report for Peake Mantua to Corracreigh_.pdf
4.4 MB · Appendix / Annex
Trial Pit 001.pdf
721.3 KB · Appendix / Annex
Trial Pit 002.pdf
688.4 KB · Appendix / Annex
Trial Pit 003.pdf
727.7 KB · Appendix / Annex
Trial Pit 004.pdf
607.5 KB · Appendix / Annex
Trial Pit 005.pdf
739.1 KB · Appendix / Annex
Trial Pit 006.pdf
652.2 KB · Appendix / Annex
Trial Pit 007.pdf
571.4 KB · Appendix / Annex
Trial Pit 008.pdf
633.8 KB · Appendix / Annex
Original notice text
Construction of approximatley: 3 Km of 125mm Outside Diameter PE 100 watermains 1 Km of 63mm Outside Diameter PE 100 watermains Ancillary works including the supply and installation of valves, service and branch connections etc.
AI analysis updated 2 months, 1 week ago
Value
€500k
Deadline
10 Jul
Buyer
Roscommon County CouncilLocation
Construction of the Peake Mantua Interconnector Pipeline in Roscommon County.