Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Corracreigh Group Water Scheme - Peake Mantua Interconnector Pipeline
Closed Construction & Civil Engineering Works SME Suitable Open

Corracreigh Group Water Scheme - Peake Mantua Interconnector Pipeline

Value

€500k

Deadline

10 Jul

Construction of Peake Mantua Interconnector Pipeline for improved water supply.

SME fit: Medium Bid effort: Medium 📍 Roscommon

Construction of Peake Mantua Interconnector Pipeline for improved water supply.

Bidder profile

SMEs with experience in civil engineering and water infrastructure projects, capable of managing projects of this scale.

Risks & flags

  • Tight timeline
  • High insurance requirements
  • Environmental compliance challenges

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Buyer Roscommon County Council
Title Corracreigh Group Water Scheme - Peake Mantua Interconnector Pipeline
CPV / category not stated
Estimated value €500,000
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-07-10T15:00:00+00:00
Go-live / start not stated

2. Scope of Work

The Corracreigh Group Water Scheme involves the construction of the Peake Mantua Interconnector Pipeline, a critical infrastructure project aimed at improving water supply in the region. The contractor will be responsible for the design, construction, and commissioning of the pipeline, ensuring compliance with all relevant regulations and standards.

Key activities include:

  • Pipeline Construction: Installation of a pipeline with a minimum internal diameter of 150mm for main lines and 100mm for branch mains.
  • Concrete Chambers: Construction of precast concrete chambers, surrounded by a minimum of 150mm compacted Clause 808 material, as per STD-W-13.
  • Site Preparation: Excavation and preparation of the site, ensuring that all works are completed within the specified timelines.
  • Quality Control: Implementation of a quality management system to ensure compliance with health and safety regulations.
  • Environmental Management: Adherence to environmental guidelines to mitigate risks associated with invasive alien species within 1km of the proposed works.
  • Completion Timeline: The project must be completed within 140 days from the contract start date.

The contractor must also coordinate with local authorities and stakeholders to ensure minimal disruption during construction.

3. Background & buyer context

This procurement is initiated by Roscommon County Council to enhance the water supply infrastructure in the region. The project aligns with national policies aimed at improving water quality and accessibility, particularly in rural areas. The urgency of this project stems from the need to address existing deficiencies in water supply and to support future growth in the area. No incumbent contractor is mentioned, indicating an open competition for this tender.

4. Eligibility & selection criteria

Bidders must meet the following eligibility and selection criteria:

  • Turnover Requirement: Minimum average annual turnover of €500,000 in the General Construction/Civil Engineering category.
  • Insurance:
  • Public Liability Insurance: Minimum of €6,500,000 per accident.
  • Employer's Liability Insurance: Minimum of €13,000,000 per accident.
  • Professional Indemnity Insurance: Minimum level of €1.5 million.
  • Certifications: Compliance with relevant ISO standards and registration with applicable bodies (not specified for this tender).
  • Past Experience: Evidence of at least 3 comparable projects completed in the last 5 years, demonstrating similar scale and complexity.
  • Personnel: Key personnel must have a minimum of 5 years' experience in relevant roles.
  • Geographic Constraints: Not specified for this tender.

5. Award criteria & scoring

Bids will be evaluated based on the following criteria:

Criterion Weight (%) Sub-criteria Pass/Fail Threshold
Price 40 Cost-effectiveness Not specified
Quality 60 Technical proposal, methodology Not specified

The evaluation will follow the Most Economically Advantageous Tender (MEAT) principle, focusing on the best price-quality ratio.

6. Submission requirements

Bidders must submit the following documents:

  • Method Statement: A detailed response document following the provided template, with a maximum of 20 pages.
  • CVs: Curriculum vitae for key personnel, limited to 2 pages each.
  • Pricing Schedule: Completed pricing template as specified in the tender documents.
  • Case Studies: At least 3 case studies of similar projects, with values ranging from €100,000 to €500,000.
  • Declarations: Include ESPD, Bona Fides, Tax clearance, and Conflict of Interest declarations.
  • Mandatory Site Visit: A site visit is required; details will be provided in the tender documents.
  • Submission Portal: All submissions must be made via eTenders, adhering to specified format rules.

7. Key dates & process

Event Date
RFT issued 2023-11-15
Clarification deadline 2023-11-29
Mandatory site visit 2023-12-05
Tender deadline 2026-07-10 15:00
Expected award 2026-07-20
Contract start 2026-08-01
Go-live / mobilisation 2026-08-15

8. Contract terms that matter

Key contract terms include:

  • Term Structure: The contract duration is fixed at 140 days, with potential penalties for delays.
  • Payment Terms: Payments will be made within 30 days of invoice submission, contingent on satisfactory progress.
  • SLAs/KPIs: Specific performance indicators will be established to monitor project milestones.
  • Liquidated Damages: A penalty of €300 per day for delays beyond the agreed completion date.
  • Termination Clauses: The buyer reserves the right to terminate the contract for non-compliance or failure to meet performance standards.
  • IP Ownership: All intellectual property generated during the project will remain with the buyer.
  • Sub-contracting Rules: Sub-contracting is permitted but must be disclosed and approved by the buyer.

9. Risks, red flags & unusuals

Potential risks and concerns include:

  • Tight Timeline: The 140-day completion requirement may pose challenges, particularly if unforeseen issues arise.
  • Insurance Requirements: The high levels of required insurance may limit participation from smaller firms.
  • Geographic Constraints: While not specified, any implicit geographic limitations could restrict competition.
  • Environmental Compliance: The need to manage invasive species within 1km of the works may complicate project execution.

10. SME fit assessment

This tender is suitable for small to medium-sized enterprises (SMEs) with experience in civil engineering and water infrastructure projects. Viable bidders should possess:

  • Relevant certifications and insurance coverage.
  • A track record of completing similar projects within the last five years.
  • The capacity to manage a project of this scale, including adequate personnel and resources.

Consortium bidding is allowed, which may enhance competitiveness. Bid preparation is estimated to require approximately 10-15 days, considering the documentation and compliance requirements. The presence of a tight timeline and high insurance requirements may signal a competitive environment, particularly if incumbents are involved.

11. Where to dig deeper

  • Source RFT Filename: Corracreigh_Group_Water_Scheme_RFT.docx
  • eTenders CFT ID: not specified
  • Contact Email: not specified
  • Important Attachments:
  • Appendix B1 — List of Previous Works Projects
  • Appendix B2 — Certificate of Satisfactory Execution
  • Appendix C — Bankers Letter

Can you bid?

Required certifications

  • ISO compliance
  • relevant registrations

Minimum turnover

€500,000

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,500,000

Scoring

Most Economically Advantageous Tender

Documents (45)

PDF

21010-TJOC-ZZ-XX-TD-7022_Specification.pdf

1.3 MB · Specification

PDF

IW-CDS-5020-01.pdf

7.5 MB · Specification

DOCX

22011-TJOC-ZZ-XX-TD-7021_ITT.docx

65.5 KB · RFT / Invitation to Tender

DOCX

21010-TJOC-ZZ-XX-TD-C-7023_Tender_&_Schedule.docx

64.1 KB · Pricing / BOQ / Schedule of Rates

PDF

22010-TJOC-ZZ-XX-TD-C-7024_Pricing_Document.pdf

431.7 KB · Pricing / BOQ / Schedule of Rates

PDF

21011-TJOC-ZZ-XX-C-7025_CoC.pdf

431.0 KB · Contract / Agreement / Terms

DOCX

3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx

51.6 KB · Contract / Agreement / Terms

DOCX

MF_1.22_Project_Supervisor_09-04-2020.docx

35.9 KB · Contract / Agreement / Terms

DOCX

3.4.2-HS-PSCS_v3.1-25-11-2025.docx

43.5 KB · Form / Declaration / Certificate

DOCX

Appendix_A_Applicants_Self-Declaration__Regulation_57.docx

40.7 KB · Form / Declaration / Certificate

DOCX

Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

26.0 KB · Form / Declaration / Certificate

DOCX

Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx

25.6 KB · Form / Declaration / Certificate

DOCX

MF_1.23_Rates_of_Pay_09-04-2020.docx

35.3 KB · Form / Declaration / Certificate

DOCX

QW2_Part_1_v2.2_25-11-2025 (1).docx

195.5 KB · Form / Declaration / Certificate

DOCX

QW_Part_2_v1.1_18-11-2024 (1).docx

60.9 KB · Form / Declaration / Certificate

PDF

20230421-021_A0-1.pdf

628.7 KB · Drawing / Plan / Layout

PDF

20230421-021_A0-2.pdf

507.9 KB · Drawing / Plan / Layout

PDF

20230421-021_A0.pdf

640.7 KB · Drawing / Plan / Layout

PDF

21011-000 LIST OF DRAWINGS.pdf

96.6 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0100.pdf

1.2 MB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0101.pdf

276.4 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0102.pdf

330.6 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0103.pdf

482.1 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0104.pdf

236.8 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0105.pdf

251.8 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0106.pdf

255.1 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0107.pdf

248.9 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0108.pdf

235.1 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0109.pdf

245.2 KB · Drawing / Plan / Layout

PDF

21011-TJOC-XX-XX-DR-C-0110.pdf

238.6 KB · Drawing / Plan / Layout

PDF

SI TP Location Map.pdf

363.5 KB · Drawing / Plan / Layout

ZIP

Peake Mantua Interconnector - Tender Docs2.zip

25.5 MB · Other

PDF

21010-TJOC-ZZ-XX-TD-C-7030_Prelim_H&S_Plan.pdf

240.3 KB · Appendix / Annex

DOCX

Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx

31.3 KB · Appendix / Annex

DOCX

Appendix_C_Bankers_Letter.docx

29.9 KB · Appendix / Annex

PDF

ESB Construction Safety 28th 11.40.pdf

803.2 KB · Appendix / Annex

PDF

Invasive Species Report for Peake Mantua to Corracreigh_.pdf

4.4 MB · Appendix / Annex

PDF

Trial Pit 001.pdf

721.3 KB · Appendix / Annex

PDF

Trial Pit 002.pdf

688.4 KB · Appendix / Annex

PDF

Trial Pit 003.pdf

727.7 KB · Appendix / Annex

PDF

Trial Pit 004.pdf

607.5 KB · Appendix / Annex

PDF

Trial Pit 005.pdf

739.1 KB · Appendix / Annex

PDF

Trial Pit 006.pdf

652.2 KB · Appendix / Annex

PDF

Trial Pit 007.pdf

571.4 KB · Appendix / Annex

PDF

Trial Pit 008.pdf

633.8 KB · Appendix / Annex

Original notice text

Construction of approximatley: 3 Km of 125mm Outside Diameter PE 100 watermains 1 Km of 63mm Outside Diameter PE 100 watermains Ancillary works including the supply and installation of valves, service and branch connections etc.

AI analysis updated 2 months, 1 week ago

Bid ↗
Details

Value

€500k

Deadline

10 Jul

View on eTenders ↗

Location

Construction of the Peake Mantua Interconnector Pipeline in Roscommon County.

Procedure

Open

Clarification

29 Nov 2023

eTenders ID

8398332

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender