Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Supply and delivery of a 7T forklift to Ted Russel Docks, Limerick City
Closed Office Supplies & Equipment Supplies Open

Supply and delivery of a 7T forklift to Ted Russel Docks, Limerick City

Deadline

26 May

Supply and delivery of a 7T forklift to Ted Russel Docks

SME fit: High Bid effort: Medium 📍 Limerick

Supply and delivery of a 7T forklift to Ted Russel Docks

Bidder profile

This tender is suitable for SMEs with strong compliance and delivery capabilities in the equipment supply sector.

Risks & flags

  • Compliance requirements
  • Insurance thresholds
  • Delivery timelines

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Field Detail
Buyer Shannon Foynes Port Company
Title Supply and delivery of a 7T forklift to Ted Russel Docks, Limerick City
CPV / category Office Supplies & Equipment
Estimated value not disclosed (eTenders placeholder)
Per-year (if multi-year) not stated
Procedure type not stated
Lots not stated
Location not stated
Contract length not stated
Submission deadline 2026-05-19T11:00:00+00:00
Go-live / start not stated

2. Scope of Work

The contracting authority sought office supplies & equipment under the title "Supply and delivery of a 7T forklift to Ted Russel Docks, Limerick City" for Shannon Foynes Port Company. The extracted text pointed to a defined scope with mandatory obligations, programme interfaces, and compliance-led execution constraints. Operational activity included mobilisation, method planning, delivery sequencing, quality control, and handover obligations tied to contract conditions. The source wording repeatedly used mandatory language, which indicated that bidders had to evidence capability rather than provide high-level intent. Key quantified references in the extract included €6.5, €13, €280,000, 4 months, 7 days.

Insurance Type Required Level Public Liability €6.5m Employers Liability €13m Prod. Public Liability €6.5m . Employers Liability €13m . Product Liability €6.5m . The Applicant must provide objective evidence confirming that they achieved a turnover of at least €280,000 during each of the previous three financial years. I confirm that our turnover exceeded €280,000 per annum in each of the last three financial years.

3. Background & buyer context

The process was run by Shannon Foynes Port Company with deadline recorded as 2026-05-19T11:00:00+00:00. Procedure details were stated as not stated and lot structure as not stated. Contract period was stated as not stated with start/go-live marked not stated. The timeline required bidders to align submission content, evidence packs, and declarations to strict procurement sequencing. Any missing dates in extracts should be treated as pending clarification rather than optional.

4. Eligibility & selection criteria

Selection evidence focused on technical capacity, legal standing, and economic/financial sufficiency against mandatory thresholds. Insurance and indemnity references appeared in the verified text and should be treated as compliance gates at selection stage. Bid teams should map each mandatory phrase to objective evidence in the response index. Examples in extract included: Insurance Type Required Level Public Liability €6.5m Employers Liability €13m Prod; Public Liability €6.5m ; Employers Liability €13m ; Product Liability €6.5m ; The Applicant must provide objective evidence confirming that they achieved a turnover of at least €280,000 during each of the previous three financial years. Any criterion stated with must/shall language should be assumed pass/fail unless the RFT explicitly describes scored treatment.

5. Award criteria & scoring

Evaluation was expected to follow MEAT-style scoring with weighted quality and price components unless otherwise stated in tender schedules. Quality marks typically depended on method, risk control, programme realism, governance, and relevant delivery track record. Price submission needed arithmetic consistency with bill/rate schedules and full compliance with format instructions. Clarification risk increased where responses omitted direct mapping from requirement text to evidence. Bidders should prioritise score-driving narratives only where criteria confirmed comparative marking.

6. Submission requirements

Delivery model expectations in the extracted material pointed to planned mobilisation, controlled execution, and measurable acceptance milestones. Outputs had to match specification wording, drawings/schedules where applicable, and authority approval checkpoints. Programme control, interface management, and issue escalation routes should be explicit in the bidder methodology. Acceptance should be evidenced through inspection records, compliance certificates, and closeout documentation as required by contract documents. Any dependency on third parties, utilities, or permits should be shown as dated assumptions with mitigation pathways.

7. Key dates & process

Commercial baseline in metadata showed estimated value not disclosed (eTenders placeholder). Pricing mechanics in public tenders usually required fixed-format submissions, exclusions discipline, and tax clarity. Bidders should validate indexation, provisional sums, option pricing, and variation treatment before final submission. Cashflow profile, milestone triggers, and retention/security positions should be checked against conditions and appendices. Where value fields were absent or symbolic, competition strategy should be based on scope intensity and risk transfer level.

8. Contract terms that matter

Legal and risk obligations in the extract referenced indemnity/insurance language and operational compliance obligations. Core controls should include H&S compliance, statutory licensing, data/security duties where relevant, and records retention. Contractual risk allocation likely covered delay, defects, liability caps/exclusions, and termination events; these need legal review. Quoted risk-relevant references included Insurance Type Required Level Public Liability €6.5m Employers Liability €13m Prod; Public Liability €6.5m ; Employers Liability €13m ; Product Liability €6.5m ; The Applicant must provide objective evidence confirming that they achieved a turnover of at least €280,000 during each of the previous three financial years; I confirm that our turnover exceeded €280,000 per annum in each of the last three financial years. No submission should proceed with unresolved redlines on non-negotiable risk positions.

9. Risks, red flags & unusuals

Process discipline should center on portal deadlines, clarification cut-off control, and version-managed response packs. Clarification questions should target missing thresholds, ambiguous acceptance tests, and any conflicting schedule references. A compliant submission pack usually includes signed forms, declarations, technical method statements, pricing schedules, and insurances. With deadline at 2026-05-19T11:00:00+00:00, internal freeze points should be set before portal close to absorb upload and validation risk. Any post-submission communication should follow the authority channel rules exactly.

10. SME fit assessment

  1. Build a requirement-by-requirement compliance matrix from the RFT and map each row to objective evidence.
  2. Confirm all pass/fail gates first (legal entity, insurances, financial standing, declarations, mandatory forms).
  3. Lock technical method narrative to the scored criteria language and remove non-scoring text.
  4. Reconcile pricing schedules, totals, assumptions, and signatures across every commercial form.
  5. Submit early on the portal and retain timestamped proof of upload and final file set.

11. Where to dig deeper

This opportunity suited a delivery-capable SME or lower-mid-market contractor with strong compliance execution and disciplined bid management. Bid/no-bid should turn on pass/fail certainty, resource availability to mobilise on authority timescales, and acceptable contractual risk. If mandatory insurance/financial thresholds cannot be met directly, consortium or structured subcontracting options should be evaluated before committing bid cost. For firms already active in comparable Irish public contracts, this looked like a viable competitive pursuit with tight execution discipline. Tender reference: f107933e-e224-4ad3-a526-147eaee5bb27.

Can you bid?

Required certifications

  • Tax Clearance Certificate
  • Public Liability Insurance

Minimum turnover

€280,000

Public liability insurance

€6,500,000

Scoring

Most Economically Advantageous Tender

Documents (3)

DOCX

RFT for supply and delivery of 7 T Forklift R1.docx

3.1 MB · RFT / Invitation to Tender

DOCX

RFT for supply and delivery of 7 T Forklift.docx

3.1 MB · RFT / Invitation to Tender

DOCX

Tender Response Document 7T forklift.docx

56.0 KB · Tender Response Template

Original notice text

The Contracting Entity is seeking offers from suitable qualified economic operators for the supply and delivery of a 7T forklift to the Ted Russel Docks in Limerick City. The proposed forklift must meet the requirements and operational parameters as set forth in the tender documents to be considered. It is also noted in the tender document of a potential trade in linked to this procurement.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Deadline

26 May

View on eTenders ↗

Location

Ted Russel Docks, Limerick City

Procedure

Open

Clarification

19 May 2026

eTenders ID

7946607

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender