Skip to content
TenderMatch
The recorded submission deadline has passed. Find open opportunities. Check the official notice for amendments.
← Tenders / Environmental Monitoring System
Closed Environmental & Ecology Services SME Suitable Open

Environmental Monitoring System

Value

€120k

Deadline

15 Jun

Environmental Monitoring System for the National Gallery of Ireland

SME fit: High Bid effort: Medium 📍 Dublin

Environmental Monitoring System for the National Gallery of Ireland

Bidder profile

Suitable for SMEs with experience in environmental monitoring systems, especially those with cultural institution clients.

Risks & flags

  • Integration with legacy system
  • Network coverage challenges

Briefing

AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.

1. At a glance

Attribute Details
Buyer National Gallery of Ireland
Title Environmental Monitoring System
CPV / category Not stated
Estimated value €120,000
Per-year (if multi-year) Not stated
Procedure type Open Procedure
Lots Not stated
Location National Gallery of Ireland
Contract length Not stated
Submission deadline 9th June 2026
Go-live / start Not stated

2. Scope of Work

The National Gallery of Ireland seeks a contractor to provide an Environmental Monitoring System (EMS) for its facilities. The EMS will ensure optimal environmental conditions for the preservation of artworks and compliance with conservation standards.

  • System Installation and Setup: Implement a comprehensive EMS that integrates seamlessly with the existing infrastructure. The system must operate independently of the Building Management System (BMS) but provide data for cross-referencing.
  • Environmental Monitoring: Continuous monitoring of temperature, humidity, and light levels across approximately 20,000 m² of gallery space.
  • Data Management: Secure, cloud-based data logging with full ownership and access rights retained by the Gallery. The system must support real-time monitoring and alerts for environmental fluctuations.
  • User Interface: Provide a user-friendly dashboard for data visualization, including customizable alerts and thresholds.
  • Training and Support: Deliver comprehensive training for Gallery staff, covering system navigation, data interpretation, and equipment handling.
  • Maintenance and Upgrades: Ensure system reliability with regular maintenance, calibration, and software updates.
  • Sustainability: Incorporate energy efficiency analytics to support the Gallery's sustainability goals.

3. Background & buyer context

The National Gallery of Ireland is procuring an Environmental Monitoring System to enhance the preservation of its art collection. This initiative aligns with the Gallery's commitment to conservation best practices and sustainability. The procurement is driven by the need to replace the legacy Hanwell system and ensure compliance with international conservation standards. The Gallery's strategic focus includes improving environmental monitoring capabilities and reducing energy consumption.

4. Eligibility & selection criteria

  • Turnover requirement: Minimum average annual turnover of €40,000 over the last three financial years.
  • Insurance:
  • Employers Liability: €13,000,000
  • Public Liability: €6,500,000
  • Product Liability: €6,500,000
  • Professional Indemnity: €1,000,000
  • Cyber Liability: €1,000,000
  • Certifications: Not specified for this tender.
  • Past experience: At least three comparable contracts delivered in the last three years, one for a cultural institution.
  • Personnel: Not specified for this tender.
  • Geographic / facility constraints: Not specified for this tender.

5. Award criteria & scoring

Criterion Weight (%) Sub-criteria Pass/Fail Thresholds
Technical and Functional Fit 40% System compliance with conservation standards 2400/4000
On-boarding & Exit Strategy 10% Implementation and data migration plans 600/1000
Training, Support, Maintenance 20% Training resources and support services 1200/2000
Sustainability & Social Value 10% Energy efficiency and social impact 600/1000
Cost 20% Pricing schedule n/a

The price/quality split follows the MEAT (Most Economically Advantageous Tender) principle.

6. Submission requirements

  • Method statement / response document: Use named template, adhere to page limits.
  • CVs: Include for key roles, page count not specified.
  • Pricing schedule: Complete Appendix 2, include all costs.
  • Case studies: Three required, demonstrate relevant experience.
  • Declarations: ESPD, Bona Fides, Tax clearance, Conflict of Interest.
  • Mandatory site visit: Not specified.
  • Submission portal: eTenders, follow specific format rules.

7. Key dates & process

Event Date
RFT issued Not specified
Clarification deadline 1st June 2026
Tender deadline 9th June 2026, 23:00
Expected award Not specified
Contract start Not specified
Go-live / mobilisation Not specified

8. Contract terms that matter

The contract may be extended for up to 12 months. Payment terms are not specified. Key SLAs include response times for issues and system reliability. Liquidated damages apply if performance standards are not met. Termination clauses allow for 14 days' notice. The Gallery retains IP ownership of all data. Sub-contracting is permitted, but details must be disclosed.

9. Risks, red flags & unusuals

The turnover requirement is relatively low, potentially allowing a wide range of bidders. The contract's dependency on the Gallery's existing infrastructure could favor incumbents familiar with the system. The need for seamless integration with the legacy Hanwell system may pose challenges for new entrants. The requirement for real-time monitoring in areas lacking network coverage could limit feasible solutions.

10. SME fit assessment

This tender is open to small and medium-sized enterprises with experience in environmental monitoring systems, particularly those with cultural institution clients. Consortiums and sub-contracting are allowed, offering flexibility in meeting requirements. Bid preparation may take several days, given the need for detailed technical responses and case studies. The incumbent's familiarity with the Gallery's infrastructure could be an advantage, but the open procedure allows for competitive bids.

11. Where to dig deeper

  • Source RFT filename: "TRD - National Gallery of Ireland - EMS.docx"
  • eTenders CFT ID: Not specified
  • Contact email or clarification portal: Not specified
  • Important attachments: "Appendix B2 — Suitability Assessment", "Mandatory Requirements Schedule"

Can you bid?

Public liability insurance

€6,500,000

Professional indemnity insurance

€1,000,000

Scoring

Most Economically Advantageous Tender

Documents (10)

PDF

NGI Environmental Standards (ML).pdf

363.5 KB · Specification

PDF

RFT - Provision of EMS National Gallery of Ireland - final v2.pdf

1.3 MB · RFT / Invitation to Tender

PDF

RFT - Provision of EMS National Gallery of Ireland - final.pdf

1.3 MB · RFT / Invitation to Tender

DOCX

TRD - National Gallery of Ireland - EMS.docx

118.8 KB · RFT / Invitation to Tender

XLSX

CRD - Appendix 2 Pricing.xlsx

28.9 KB · Pricing / BOQ / Schedule of Rates

PDF

national-gallery-ireland-climate-action-roadmap-2023-final.pdf

736.1 KB · Other

PDF

Preventive Conservation_Risk Management Statement.pdf

287.3 KB · Other

PDF

Clarifications - EMS 25.5.pdf

445.3 KB · Clarification / Addendum

PDF

Clarifications - EMS.pdf

455.0 KB · Clarification / Addendum

DOCX

ESPD - National Gallery of Ireland.docx

70.8 KB · ESPD (European Single Procurement Document)

Original notice text

Provision of a comprehensive environmental monitoring service to support the preservation, protection, and long-term care of the Gallery's collections. Refer to the RFT documents for further details.

AI analysis updated 2 months, 2 weeks ago

Bid ↗
Details

Value

€120k

Deadline

15 Jun

View on eTenders ↗

Location

National Gallery of Ireland

Procedure

Open

Clarification

01 Jun 2026

eTenders ID

8097700

✦ Ask AI about this tender

Ask AI

Knows this tender's documents

Is this a good fit for us?
Based on the deadline, buyer, and eligibility requirements in the tender documents, here's a quick read on fit — with citations back to the exact clause 1 so you can verify it yourself.

Example only — sign up to ask about this tender